[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,7,50,1681,[13,34,46,58,70,82,92,103,115,127,139,151,163,175,187,199,211,223,235,247,259,271,283,295,307,319,331,343,355,366,378,390,401,413,425,437,449,461,473,485,496,508,520,531,543,553,565,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1123016,1,"单选题","锚杆施工钻孔的偏斜度不宜大于（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","2%",false,{"key":24,"text":25,"correct":26},"B","3%",true,{"key":28,"text":29,"correct":22},"C","5%",{"key":31,"text":32,"correct":22},"D","7%","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1123017,"钢支撑预加压力施工中，支撑安装完毕后，应及时检查各节点的连接状况，经确 认符合要求后可施加预压力，预压力的施加应在支撑的（ ）进行。",[38,40,42,44],{"key":20,"text":39,"correct":22},"前端",{"key":24,"text":41,"correct":22},"后端",{"key":28,"text":43,"correct":26},"两端同时",{"key":31,"text":45,"correct":22},"两端分别",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1123018,"地下连续墙宜采用（）法检测其墙身结构质量。",[50,52,54,56],{"key":20,"text":51,"correct":22},"射线透视",{"key":24,"text":53,"correct":26},"声波透射法",{"key":28,"text":55,"correct":22},"超声探伤",{"key":31,"text":57,"correct":22},"断开试验",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1123019,"关于喷射混凝土工程施工质量检测方法，以下说法错误的是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"喷射混凝土强度检测与普通混凝土的检测方法相同，主要是进行强度试验，并对强度进行评定。喷射混凝土强度检测常采用现场检测方法，包括预留试样（喷大板法或喷模法）、现场取样(凿孔方法或钻取并点荷载试验方法)以及拔出试验法。除上述检测方法外，还可采用前述无损检测法",{"key":24,"text":65,"correct":22},"喷射混凝土厚度检测方法：常用的有钎探法、打孔测量或取芯法检测",{"key":28,"text":67,"correct":22},"喷射混凝土工程规格尺寸检测方法：目前用于工程断面规格尺寸检测的方法主要有挂线测量法、激光测距法、超声波测距法等",{"key":31,"text":69,"correct":26},"观感质量检测方法：观感质量检测包括喷射混凝土有无漏喷、离鼓现象；有无仍在扩展或危及使用安全的裂缝；漏水量；钢筋网有无外露；成型、断面轮廓符合设计要求，做到墙直、拱平滑；喷射混凝土表面平整密实，用1m的靠尺和塞尺量测，测点1m2范围内凹凸不得大于80mm",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1123020,"关于锚杆(锚索)工程施工质量检测，以下说法错误的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"锚杆(锚索)工程质量检测仅包括锚杆(锚索)抗拔力检测",{"key":24,"text":77,"correct":22},"锚杆(锚索)抗拔力检测：锚杆抗拔力指其抵抗从岩体中拔出的能力。抗拉拔力是锚杆检测的重要内容",{"key":28,"text":79,"correct":22},"检测锚杆抗拔力的常规方法是用锚杆拉力计或扭力矩扳手进行拉力试验",{"key":31,"text":81,"correct":22},"锚杆安装质量检测：锚杆安装质量包括锚杆托板安装质量、锚杆间距、锚杆孔的深度、角度、锚杆外露长度等方面的质量",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1123021,"混凝土灌注桩质量检测，当采用低应变动测法检测桩身完整性时，检测数量不宜 少于总桩数的（），且不得少于5根。",[86,88,89,90],{"key":20,"text":87,"correct":22},"1%",{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":22},{"key":31,"text":91,"correct":26},"10%",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},1123022,"土钉墙质量检查时，墙面喷射混凝土厚度应采用（）。",[96,98,100,101],{"key":20,"text":97,"correct":22},"游标卡尺",{"key":24,"text":99,"correct":26},"钻孔检测",{"key":28,"text":51,"correct":22},{"key":31,"text":102,"correct":22},"水压试验",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},1123023,"深基坑支护水泥土粧应在施工后（）进行开挖检查或采用钻孔取芯等手段检查 成桩质量，若不符合设计要求应及时调整施工工艺。",[107,109,111,113],{"key":20,"text":108,"correct":26},"一周内",{"key":24,"text":110,"correct":22},"十天内",{"key":28,"text":112,"correct":22},"半月内",{"key":31,"text":114,"correct":22},"一月内",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":31,"analysis":33},1123024,"立井井筒工程验收时，现浇混凝土井壁的施工质量检査通常不包括（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":22},"井壁外观",{"key":24,"text":122,"correct":22},"井壁厚度",{"key":28,"text":124,"correct":22},"混凝土强度",{"key":31,"text":126,"correct":26},"钢筋数量",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":28,"analysis":33},1123025,"井筒竣工验收时要求普通法施工的井筒建成后总漏水量不得大于（）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"3m3\u002Fh",{"key":24,"text":134,"correct":22},"5m3\u002Fh",{"key":28,"text":136,"correct":26},"6m3\u002Fh",{"key":31,"text":138,"correct":22},"8m3\u002Fh",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":28,"analysis":33},1123026,"分部工程质量应由（）组织有关单位检验评定。",[143,145,147,149],{"key":20,"text":144,"correct":22},"施工单位负责人",{"key":24,"text":146,"correct":22},"监理工程师",{"key":28,"text":148,"correct":26},"建设单位代表",{"key":31,"text":150,"correct":22},"质量管理部门负责人",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":24,"analysis":33},1123027,"巷道竣工验收时，对于锚喷支护巷道，喷射混凝土厚度应达到设计的要求，局部 厚度不得小于（）。",[155,157,159,161],{"key":20,"text":156,"correct":22},"设计规定的80%",{"key":24,"text":158,"correct":26},"设计规定的90%",{"key":28,"text":160,"correct":22},"100mm",{"key":31,"text":162,"correct":22},"120mm",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":28,"analysis":33},1123028,"井巷工程质量抽检时，合格率应达到（）以上。",[167,169,171,173],{"key":20,"text":168,"correct":22},"60%",{"key":24,"text":170,"correct":22},"70%",{"key":28,"text":172,"correct":26},"80%",{"key":31,"text":174,"correct":22},"90%",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1123029,"当建设工程达到竣工条件后，施工单位应在自査、自评工程完成后填写工程竣工 报验单，并将全部竣工资料报送（），申请竣工验收。",[179,181,183,185],{"key":20,"text":180,"correct":26},"项目监理机构",{"key":24,"text":182,"correct":22},"建设单位主管部门",{"key":28,"text":184,"correct":22},"质量管理部门",{"key":31,"text":186,"correct":22},"建设行政主管部门",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},1123030,"对进场材料质量控制，要重视材料的（），以防错用或使用不合格的材料。",[191,193,195,197],{"key":20,"text":192,"correct":22},"进场验收",{"key":24,"text":194,"correct":26},"使用认证",{"key":28,"text":196,"correct":22},"检验",{"key":31,"text":198,"correct":22},"试验",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":28,"analysis":33},1123031,"立井井筒工程验收时，为了检测井壁混凝土的质量，可以在井壁上钻孔取芯测试 混凝土的强度，通常钻孔数量（）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"不应超过5处",{"key":24,"text":206,"correct":22},"不应超过3处",{"key":28,"text":208,"correct":26},"不应超过2处",{"key":31,"text":210,"correct":22},"不应超过1处",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":20,"analysis":33},1123032,"施工阶段混凝土的质量检验项目主要有坍落度、表观密度和（）等。",[215,217,219,221],{"key":20,"text":216,"correct":26},"抗压强度、抗折及抗弯强度",{"key":24,"text":218,"correct":22},"抗剪强度、抗折及抗弯强度",{"key":28,"text":220,"correct":22},"抗压强度、导热系数及抗弯强度",{"key":31,"text":222,"correct":22},"抗压强度、耐火度及抗弯强度",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},1123033,"对于混凝土结构工程的施工质量，可以采用（）进行检测。",[227,229,231,233],{"key":20,"text":228,"correct":26},"无损检测法",{"key":24,"text":230,"correct":22},"光电法",{"key":28,"text":232,"correct":22},"取芯法",{"key":31,"text":234,"correct":22},"拉拔法",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},1123034,"材料质量控制的主要内容有：材料的性能，材料取样，试验方法及（）等。",[239,241,243,245],{"key":20,"text":240,"correct":26},"材料的质量标准",{"key":24,"text":242,"correct":22},"材料的强度",{"key":28,"text":244,"correct":22},"试验设备",{"key":31,"text":246,"correct":22},"试验人员",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},1123036,"耐火材料的检验项目是（）以及吸水率、重烧线收缩、荷重软化温度等。",[251,253,255,257],{"key":20,"text":252,"correct":22},"抗折强度、耐火度、抗压强度",{"key":24,"text":254,"correct":26},"表观密度、耐火度、抗压强度",{"key":28,"text":256,"correct":22},"表观密度、耐火度、抗剪强度",{"key":31,"text":258,"correct":22},"表观密度、导热度、抗剪强度",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},1123037,"关于质量检验批的实物检查内容，以下说法错误的是（）。",[263,265,267,269],{"key":20,"text":264,"correct":22},"对原材料、构配件和器具等产品的进场复验，应按进场的批次和产品的抽样检验方案执行",{"key":24,"text":266,"correct":22},"对混凝土强度、预制构件结构性能等，应按国家现行有关标准和规范规定的抽样检验方案执行",{"key":28,"text":268,"correct":22},"对规范中采用计数检验的项目，应按抽査总点数的合格率进行检查",{"key":31,"text":270,"correct":26},"包括原材料、构配件和器具等的产品合格证（中文质量合格证明文件、规格、型号及性能检测报告等）及进场复验报告、施工过程中重要工序的自检和交接检记录、抽样检验报告、见证检测报告、隐蔽工程验收记录等",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":31,"analysis":33},1123038,"关于检验批及分项工程的验收程序与组织，以下说法错误的是（）。",[275,277,279,281],{"key":20,"text":276,"correct":22},"检验批由专业监理工程师组织项目专业质量检验员等进行验收，分项工程由专业监理工程师组织项自专业技术负责人等进行验收",{"key":24,"text":278,"correct":22},"检验批和分项工程是建筑工程质量的基础，因此，所有检验批和分项工程均应由监理工程师或建设单位项目负责人组织验收",{"key":28,"text":280,"correct":22},"验收前，施工单位先填好“检验批和分项工程的质量验收记录”（有关监理记录和结论不填），并由项目专业质量检验员和项目专业技术负责人分别在检验批和分项工程质量检验中相关栏目签字",{"key":31,"text":282,"correct":26},"由总监理工程师组织，严格按规定程序进行验收",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":28,"analysis":33},1123039,"关于单位工程的验收程序及组织，以下说法错误的是（）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"当建设工程达到竣工条件后，施工单位应在自查、自评工程完成后填写工程竣工报验单，并将全部竣工资料报送项目监理机构，申请竣工验收",{"key":24,"text":290,"correct":22},"经项目监理机构对竣工资料及实物全面检查、验收合格后，由监理工程师签署工程竣工报验单，并向建设单位提出质量评估报告",{"key":28,"text":292,"correct":26},"建设单位收到工程验收报告后，应由施工单位负责人组织施工、设计、监理等单位负责人进行单位工程验收。",{"key":31,"text":294,"correct":22},"单位工程由分包单位施工时，分包单位对所承包的工程项目应按规定的程序检查评定，总包单位应派人员参加，分包工程完成后，应将工程有关资料交总包单位，建设单位验收合格，方可交付使用",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":20,"analysis":33},1123040,"关于矿业工程质量检验类型与方法，以下说法错误的是（）。",[299,301,303,305],{"key":20,"text":300,"correct":26},"根据所采用的质量检验方法，矿业工程质量检验可分为三个类型：抽査、全检、合格证检査。抽样验收检査的理论依据是概率论和数理统计，其科学性、可靠性均较强，采用控制的费用较低，是一种比较理想的控制方法，在矿业工程项目质量检验中应优先使用",{"key":24,"text":302,"correct":22},"样本容量及判别方法的确定就属于抽样检验方案的问题。矿业工程质量抽验质量方案有两种类型，计数型抽检方案和计量型抽检方案",{"key":28,"text":304,"correct":22},"计数型抽检方案是从待检对象中抽取若干个“单位产品”组成样本，按检验结果将单位产品分为合格品或不合格品，或者计算单位产品的缺陷数，用计数制作为产品批的合格判断标准",{"key":31,"text":306,"correct":22},"计量型抽样检验方案是用计量值作为产品批质量判别标准的抽检方案",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":20,"analysis":33},1123041,"矿业工程项目的成本由建筑安装工程费、（）、工程建设其他费和预备费组成",[311,313,315,317],{"key":20,"text":312,"correct":26},"设备及工器具购置费",{"key":24,"text":314,"correct":22},"施工机具使用费",{"key":28,"text":316,"correct":22},"措施费",{"key":31,"text":318,"correct":22},"税金",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},1123042,"关于措施项目费，以下说法错误的是（）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"特殊地区施工增加费：是指工程在沙漠或其边缘地区、高海拔、高寒、原始森林等特殊地区施工增加的费用",{"key":24,"text":326,"correct":22},"大型机械设备进出场及安拆费：是指机械整体或分体自停放场地运至施工现场或由一个施工地点运至另一个施工地点，所发生的机械进出场运输及转移费用及机械在施工现场进行安装、拆卸所需的人工费、材料费、机械费、试运转费和安装所需的辅助设施的费用",{"key":28,"text":328,"correct":22},"脚手架工程费：是指施工需要的各种脚手架搭、拆、运输费用以及脚手架购置费的摊销(或租赁)费用",{"key":31,"text":330,"correct":26},"总承包服务费：是指总承包人为配合、协调建设单位进行的专业工程发包，对建设单位自行采购的材料、工程设备等进行保管以及施工现场管理、竣工资料汇总整理等服务所需的费用",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":31,"analysis":33},1123043,"矿业工程建设其他费用中的专业性项目包括有采矿权转让费、井筒地质检査钻探 费、探矿权转让费和（）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"环境影响评价费用",{"key":24,"text":338,"correct":22},"安全生产评价费",{"key":28,"text":340,"correct":22},"规费",{"key":31,"text":342,"correct":26},"维修费",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":28,"analysis":33},1123044,"在现有工程价格资料的基础上，经过分析整理用于编制项目建议书、可行性研究 报告投资估算的依据的是（）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"预算定额",{"key":24,"text":350,"correct":22},"概算定额",{"key":28,"text":352,"correct":26},"估算指标",{"key":31,"text":354,"correct":22},"概算指标",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":31,"analysis":33},1123045,"采用定额计价编制标底时，可使用的定额是（）。",[359,361,363,365],{"key":20,"text":360,"correct":22},"设计定额",{"key":24,"text":362,"correct":22},"施工定额",{"key":28,"text":364,"correct":22},"结算定额",{"key":31,"text":350,"correct":26},{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1123046,"由地区建设行政主管部门组织，考虑地区工程建设特点，对国家定额进行调整、 补充编制并批准、发布，在本地区范围内使用的定额是（）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"国家定额",{"key":24,"text":373,"correct":26},"地区定额",{"key":28,"text":375,"correct":22},"行业定额",{"key":31,"text":377,"correct":22},"企业定额",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":28,"analysis":33},1123047,"其他项目清单中，为配合协调招标人进行的工程分包和材料采购所需的费用是（）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"预留金",{"key":24,"text":385,"correct":22},"材料购置费",{"key":28,"text":387,"correct":26},"总承包服务费",{"key":31,"text":389,"correct":22},"零星工作费",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},1123048,"按照综合单价法计算，单位工程报价由分部分项工程费、措施项目费、其他项目 费、税金和（）构成。",[394,395,397,399],{"key":20,"text":340,"correct":26},{"key":24,"text":396,"correct":22},"利润",{"key":28,"text":398,"correct":22},"企业管理费",{"key":31,"text":400,"correct":22},"保险费",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":28,"analysis":33},1123049,"不属于矿业工程项目工程量变更的条件的是（）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"因设计局部修改",{"key":24,"text":408,"correct":22},"因工程施工中客观条件变化而修改施工图设计",{"key":28,"text":410,"correct":26},"超过本单位工程预备费率部分的“三材”",{"key":31,"text":412,"correct":22},"因材料代用所增加的费用",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":31,"analysis":33},1123050,"下列关于矿业工程量变更计算的规定表述错误的是（）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"工程量清单漏项或由于设计变更引起的新的工程量清单项目，其相应综合单 价由承包方提出，经发包方确认后作为结算的依据",{"key":24,"text":420,"correct":22},"由于设计变更引起工程量增减部分，属于合同约定幅度以内的，应执行原有的 综合单价",{"key":28,"text":422,"correct":22},"增减工程量属于合同约定幅度以外的，其综合单价由承包人提出，经发包人确 认以后作为结算的依据",{"key":31,"text":424,"correct":26},"由于工程量的变更，且实际发生了规定以外的费用损失，承包人不可提出索赔 要求",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":20,"analysis":33},1123051,"矿业工程项目进行招标时，其计价方法一般不采用（）。",[429,431,433,435],{"key":20,"text":430,"correct":26},"以估算计价编制标底",{"key":24,"text":432,"correct":22},"以定额计价编制标底",{"key":28,"text":434,"correct":22},"以工程量清单计价编制标底",{"key":31,"text":436,"correct":22},"以投标报价的计价编制标底",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},1123052,"根据矿山工程造价费用定额现行规定，施工方利用永久建筑工程和设备的费用来 源由发包方负责支出的是（）。",[441,443,445,447],{"key":20,"text":442,"correct":26},"四通一平工程费用",{"key":24,"text":444,"correct":22},"属于临时设施费范围内的永久工程发生的费用费",{"key":28,"text":446,"correct":22},"利用属于直接费项下的内容的永久工程和设备而发生的费用",{"key":31,"text":448,"correct":22},"利用永久设备，其费用来源由直接定额中的机械费列支",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":20,"analysis":33},1123053,"关于施工机具使用费，以下说法错误的是（）。",[453,455,457,459],{"key":20,"text":454,"correct":26},"运输损耗费：是指材料在运输装卸过程中不可避免的损耗",{"key":24,"text":456,"correct":22},"人工费：指机上司机(司炉)和其他操作人员的人工费",{"key":28,"text":458,"correct":22},"燃料动力费：指施工机械在运转作业中所消耗的各种燃料及水、电等",{"key":31,"text":460,"correct":22},"税费：指施工机械按照国家规定应缴纳的车船使用税、保险费及年检费等",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":28,"analysis":33},1123054,"关于企业管理费，以下说法错误的是（）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"财务费：是指企业为施工生产筹集资金或提供预付款担保、履约担保、职工工资支付担保等所发生的各种费用",{"key":24,"text":468,"correct":22},"税金：是指企业按规定缴纳的房产税、车船使用税、土地使用税、印花税等",{"key":28,"text":470,"correct":26},"社会保险费",{"key":31,"text":472,"correct":22},"其他：包括技术转让费、技术开发费、投标费、业务招待费、绿化费、广告费、公证费、法律顾问费、审计费、咨询费、保险费等",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":28,"analysis":33},1123055,"从可行性研究、勘察设计、组织施工、设备订货、职工培训直到竣工：验收，全部 工作交由一个承包公司完成，这种承包方式称为（）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"专项承包",{"key":24,"text":480,"correct":22},"项目承包",{"key":28,"text":482,"correct":26},"项目总承包",{"key":31,"text":484,"correct":22},"阶段承包",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},1123056,"按照项目实施的先后进行招标的方式称为（）。",[489,491,492,494],{"key":20,"text":490,"correct":22},"总承包",{"key":24,"text":484,"correct":26},{"key":28,"text":493,"correct":22},"分承包",{"key":31,"text":495,"correct":22},"独立承包",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":28,"analysis":33},1123057,"根据矿山工程项目的特点，井筒工程项目中不能单独进行工程招标的是（）。",[500,502,504,506],{"key":20,"text":501,"correct":22},"井筒冻结",{"key":24,"text":503,"correct":22},"井筒注浆",{"key":28,"text":505,"correct":26},"井筒砌壁",{"key":31,"text":507,"correct":22},"井筒安装",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":31,"analysis":33},1123058,"矿山工程项目施工招标条件不需要（）。",[512,514,516,518],{"key":20,"text":513,"correct":22},"立项批准",{"key":24,"text":515,"correct":22},"资金落实",{"key":28,"text":517,"correct":22},"设计图纸",{"key":31,"text":519,"correct":26},"编制决算",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":24,"analysis":33},1123059,"不属于招标文件内容的是（）。",[524,526,528,529],{"key":20,"text":525,"correct":22},"招标公告",{"key":24,"text":527,"correct":26},"工程造价",{"key":28,"text":517,"correct":22},{"key":31,"text":530,"correct":22},"技术要求",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":28,"analysis":33},1123060,"不属于投标须知文件内容的是（）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"资金来源",{"key":24,"text":538,"correct":22},"工程说明",{"key":28,"text":540,"correct":26},"资格审查文件",{"key":31,"text":542,"correct":22},"投标费用",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},1123061,"不属于投标文件组成部分的是（）。",[547,548,550,552],{"key":20,"text":540,"correct":22},{"key":24,"text":549,"correct":22},"投标函部分",{"key":28,"text":551,"correct":22},"技术部分",{"key":31,"text":542,"correct":26},{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},1123062,"投标报价可采用的策略是（）。",[557,559,561,563],{"key":20,"text":558,"correct":26},"提出改进技术方案",{"key":24,"text":560,"correct":22},"提前递交标书",{"key":28,"text":562,"correct":22},"低于成本价竞标",{"key":31,"text":564,"correct":22},"适当延长工期",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":28,"analysis":33},1123063,"关于投标报价的技巧，正确的说法是（）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"自身任务不足时，愿意承揽的项目报价宜高",{"key":24,"text":572,"correct":22},"地区偏僻的项目成本较低，报价宜低",{"key":28,"text":574,"correct":26},"施工技术复杂且风险高的项目，报价宜高",{"key":31,"text":576,"correct":22},"自身有特长且竞争不强时的项目报价宜低",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},1123064,"投标书编制时，对投标人的要求是（）。",[581,583,585,587],{"key":20,"text":582,"correct":22},"可以根据投标人自身的情况编制投标书",{"key":24,"text":584,"correct":26},"投标人应当参加现场踏勘工作",{"key":28,"text":586,"correct":22},"投标书编制内容可不包含投标报价",{"key":31,"text":588,"correct":22},"主体工程分包要作说明",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":31,"analysis":33},1123065,"关于招投标管理机构及其职责，以下说法错误的是（）。",[593,595,597,599],{"key":20,"text":594,"correct":22},"建设部负责全国工程建设施工招标投标的管理工作，其主要职责是：贯彻执行国家有关工程建设招标投标的法律、法规和方针、政策，制定施工招标投标的规定和办法；指导、检査各地区、各部门招标投标工作",{"key":24,"text":596,"correct":22},"省、自治区、直辖市人民政府建设行政主管部门，负责管理本行政区域内的施工招标投标工作，其主要职责是：贯彻执行国家有关工程建设招标投标的法规和方针、政策，制定施工招标投标实施办法；监督、检查有关施工招标投标活动；审批咨询、监理等单位代理施工招标投标业务的资格",{"key":28,"text":598,"correct":22},"各级施工招标投标办事机构具体负责本行政区域内施工招标投标的管理工作。主要职责是：审查招标单位的资质；审查招标申请书和招标文件；审定标底；监督开标、评标、定标和议标；调解招标投标活动中的纠纷；监督承发包合同的签订、履行",{"key":31,"text":600,"correct":26},"行业基本纪检部门对行业招投标工作进行监督管理工作。招投标代理机构、设计、施工、监理单位的地方备案及日常监督管理",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":28,"analysis":33},1123066,"关于开标评标定标的要求，以下说法错误的是（）。",[605,607,609,611],{"key":20,"text":606,"correct":22},"开标、评标、定标活动，由招标单位或招标代理机构主持进行；招标单位应邀请有关部门参加开标会议，当众宣布评标、定标办法，启封投标书及补充函件，公布投标书的主要内容和标底",{"key":24,"text":608,"correct":22},"废标的标准：未密封；无单位和法定代表人或法定代表人委托的代理人的印鉴；未按规定的格式填写，内容不全或字迹模糊、辨认不清；逾期送达；投标单位未参加开标会议",{"key":28,"text":610,"correct":26},"评标组织由建设单位及其上级主管部门和建设单位邀请的有关单位组成。评标专家由市级人民政府发改委专家库抽取",{"key":31,"text":612,"correct":22},"评标、定标应采用科学的方法。按照平等竞争、公正合理原则，一般应对投标单位的报价、工期、主要材料用量、施工方案、质量实绩、企业信誉等进行综合评价，择优确定中标单位",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]