[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,6,50,1681,[13,34,46,58,70,82,94,106,118,130,142,151,163,175,187,199,211,223,235,247,259,271,281,293,305,315,327,339,351,363,375,387,399,409,421,433,445,457,466,478,490,502,514,526,536,545,557,569,581,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1122963,1,"单选题","当工作面使用凿岩台车打眼时，配套的装岩设备一般宜选用（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","耙斗式装载机",false,{"key":24,"text":25,"correct":22},"B","铲斗后卸式装载机",{"key":27,"text":28,"correct":29},"C","铲斗侧卸式装载机",true,{"key":31,"text":32,"correct":22},"D","钻装机","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1122964,"硐室全断面施工法和普通巷道施工法基本相同，硐室全断面施工法一般适用于( )o",[38,40,42,44],{"key":20,"text":39,"correct":29},"稳定及整体性好的岩层",{"key":24,"text":41,"correct":22},"稳定性较好岩层",{"key":27,"text":43,"correct":22},"不稳定岩层",{"key":31,"text":45,"correct":22},"完整性岩层",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1122965,"下山掘进钻眼爆破工作中，应特别注意下山的（），使其符合设计要求。",[50,52,54,56],{"key":20,"text":51,"correct":29},"坡度",{"key":24,"text":53,"correct":22},"倾斜度",{"key":27,"text":55,"correct":22},"平整度",{"key":31,"text":57,"correct":22},"标高",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1122966,"下山掘进时的装岩运输工作比较困难，可利用矿车或箕斗进行提升，其中（） 提升效果更为突出。",[62,64,66,68],{"key":20,"text":63,"correct":22},"矿车",{"key":24,"text":65,"correct":22},"刮板输送机",{"key":27,"text":67,"correct":29},"箕斗",{"key":31,"text":69,"correct":22},"梭式矿车",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1122967,"巷道施工采用锚喷支护，锚喷支护目前在煤矿中普遍使用，锚杆支护是一种 ()支护形式。",[74,76,78,80],{"key":20,"text":75,"correct":22},"被动支护",{"key":24,"text":77,"correct":29},"主动支护",{"key":27,"text":79,"correct":22},"柔体支护",{"key":31,"text":81,"correct":22},"整体支护",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1122968,"关于钻眼爆破法施工的岩巷综掘机施工，以下说法错误的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"岩巷综掘机械化作业线是岩巷施工发展的方向，实现了破岩、矸石装运一体化；掘进机能够破岩、装岩并能将煤矸转载到运输设备上",{"key":24,"text":89,"correct":22},"它具有工序少、进度快、效率高、质量好、施工安全、劳动强度小等优点。而胶带转载机能实现长距离连续运输，其能力大于掘进机的生产能力，可最大限度地发挥掘进机的潜力，提高开机率，实现连续掘进",{"key":27,"text":91,"correct":29},"岩巷掘进机局限性较大，对地质及后配套运输条件都有较高要求；适用于距离较长、岩石硬度适中、后配套运输能够实现连续化的岩石巷道，在巷道长度大于1100 m时，其优越性更为明显",{"key":31,"text":93,"correct":22},"其产尘量大，严重危害职工身体健康，目前仍没有有效的防尘技术彻底解决；而且拆除、安装时间较长，同时受机电维修影响较大",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1122969,"关于巷道的施工方法，以下说法错误的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"一次成巷是把巷道施工中的掘进、永久支护、水沟掘砌三个分部工程视为一个整体，在一定距离内，按设计及质量标准要求，互相配合，前后连贯地、最大限度地同时施工，一次成巷，不留收尾工程",{"key":24,"text":101,"correct":22},"分次成巷是把巷道的掘进和永久支护两个分部工程分两次完成，先把整条巷道掘出来，暂以临时支架维护，以后再拆除临时支架进行永久支护和水沟掘砌",{"key":27,"text":103,"correct":22},"实践证明，一次成巷具有作业安全，施工速度快，施工质量好，节约材料，降低工程成本和施工计划管理可靠等优点",{"key":31,"text":105,"correct":29},"除了工程上的特殊需要外，一般不采用一次成巷施工法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1122970,"关于压入式通风，以下说法错误的是（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"压入式通风是局部扇风机把新鲜空气用风筒压入工作面，污浊空气沿巷道流出。在通风过程中炮烟逐渐随风流排出，当巷道出口处的炮烟浓度下降到允许浓度时（此时巷道内的炮烟浓度都已降到允许浓度以下），即认为排烟过程结束。",{"key":24,"text":113,"correct":29},"为了保证通风效果，局部扇风机必须安设在有新鲜风流流过的巷道内，并距掘进巷道口不得小于20 m，以免产生循环风流。为了尽快而有效地排除工作面的炮烟，风筒口距工作面的距离一般以不大于20m为宜",{"key":27,"text":115,"correct":22},"压入式通风方式可采用胶质或塑料等柔性风筒。其优点是：有效射程大，冲淡和排出炮烟的作用比较强；工作面回风不通过扇风机，在有瓦斯涌出的工作面采用这种通风方式比较安全；工作面回风沿巷道流出，沿途也就一并把巷道内的粉尘等有害气体带走",{"key":31,"text":117,"correct":22},"缺点是：长距离巷道掘进排出炮烟需要的风量大，所排出的炮烟在巷道中随风流而扩散，蔓延范围大，时间又长，工人进入工作面往往要穿过这些蔓延的污浊气流",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1122971,"矿井投产工期是指从（）之日起到部分工作面建成，并经试运转，试生产后正式投产所经历的时间。",[122,124,126,128],{"key":20,"text":123,"correct":22},"施工人员进场",{"key":24,"text":125,"correct":29},"项目正式开工",{"key":27,"text":127,"correct":22},"开始场内施工准备工作",{"key":31,"text":129,"correct":22},"施工许可证办理完毕",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1122972,"矿井建设总工期等于（）。",[134,136,138,140],{"key":20,"text":135,"correct":29},"矿井施工准备工期与矿井竣工工期之和",{"key":24,"text":137,"correct":22},"矿井施工准备工期与矿井投产工期之和",{"key":27,"text":139,"correct":22},"矿井竣工工期",{"key":31,"text":141,"correct":22},"矿井投产工期与矿井竣工工期之和",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1122973,"矿井竣工工期(或建井工期)是指从项目正式开工之日起到按照设计规定（ ）， 并经过试生产，试运转后正式交付生产所经历的时间。",[146,147,149,150],{"key":20,"text":123,"correct":22},{"key":24,"text":148,"correct":29},"竣工完成建设工程",{"key":27,"text":127,"correct":22},{"key":31,"text":129,"correct":22},{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":33},1122974,"矿井施工准备工期与矿井竣工工期之和构成矿井建设的总工期，矿井建设的总工 期一般可依据（）来进行推算。",[155,157,159,161],{"key":20,"text":156,"correct":22},"关键生产系统的施工工期",{"key":24,"text":158,"correct":22},"全部生产系统的安装工期",{"key":27,"text":160,"correct":29},"矿井建设的关键线路工期",{"key":31,"text":162,"correct":22},"全部土建工程的施工工期",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":31,"analysis":33},1122975,"矿业工程施工进度计划编制时，网络计划工作的重点是确定（）。",[167,169,171,173],{"key":20,"text":168,"correct":22},"施工方案",{"key":24,"text":170,"correct":22},"施工方法",{"key":27,"text":172,"correct":22},"施工技术",{"key":31,"text":174,"correct":29},"施工顺序",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":27,"analysis":33},1122976,"关于矿业工程施工进度计划的编制方法，以下说法错误的是（）。",[179,181,183,185],{"key":20,"text":180,"correct":22},"调査研究：调查研究的内容包括全部文件资料，包括合同规定的工程任务构成及相关政策、规程要求，特别要对施工图进行透彻研究；还有熟悉施工的客观条件，了解现场施工的具体条件",{"key":24,"text":182,"correct":22},"确定方案：施工方案是决定施工进度的主要因素。确定施工方案后就可以确定项目施工总体部署，划分施工阶段，制定施工方法，明确工艺流程，决定施工顺序等，其中施工顺序是网络计划工作的重点。这些一般都是施工组织设计中已经考虑的内容，故可直接根据有关文件中获得后进行进度计划的编制",{"key":27,"text":184,"correct":29},"划分工序并估算时间：根据工程内容和施工方案，将工程任务划分为若干道工序。要求每一道工序都有明确的任务内容，有一定的实物工程量和形象进度目标，完成与否有明确的判别标志。确定工序后，估算每道工序开始工作时间，进行进度计划的定量分析。对于工序时间的确定，一般采用经验确定和定额计算两种方法",{"key":31,"text":186,"correct":22},"绘制进度计划图表：在充分掌握施工程序和安排的基础上，绘制横道图或网络图并进行优化，确定关键线路和计划工期，提交进度计划图表",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},1122977,"矿业工程项目在确立施工进度目标时，施工方案选择的一般要求是工程应有较先 进的（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"关键进度指标",{"key":24,"text":194,"correct":29},"平均进度指标",{"key":27,"text":196,"correct":22},"施工技术水平",{"key":31,"text":198,"correct":22},"施工质量目标",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},1122979,"矿业工程项目矿、土、安三类工程的综合平衡，是决定整个矿山工程项目工期的 关键。依照矿山工程的特点，通常根据（）进度安排来布置各工作的施工顺序。",[203,205,207,209],{"key":20,"text":204,"correct":29},"矿建工程",{"key":24,"text":206,"correct":22},"土建工程",{"key":27,"text":208,"correct":22},"安装工程",{"key":31,"text":210,"correct":22},"机电工程",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1122980,"有关井筒施工顺序的说法错误的是（）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"位于主要矛盾线上的风井井筒，与主、副井同时或稍后于主、副井开工为好",{"key":24,"text":218,"correct":29},"非主要矛盾线上的风井井筒，开工时间可适当提前",{"key":27,"text":220,"correct":22},"各风井井筒的开工间隔时间应控制在3~6个月",{"key":31,"text":222,"correct":22},"风井比主、副井提前开工的方案一般是不可取的",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":31,"analysis":33},1122981,"矿山工程项目在进度控制方法上有其自身的特点，下列说法不属于该特点的是( )",[227,229,231,233],{"key":20,"text":228,"correct":22},"施工顺序明确而限制多，使控制方法难度增加",{"key":24,"text":230,"correct":22},"复杂的环境因素对进度计划影响大，使控制具有不确定性",{"key":27,"text":232,"correct":22},"进度控制手段多，但应用具有限制性",{"key":31,"text":234,"correct":29},"实施单行作业条件好，能减少施工干扰",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},1122982,"当关键工作的实际进度较计划进度落后时，调整的目标就是采取措施将耽误的时 间补回来，保证项目按期完成。调整的方法主要是缩短后续关键工作的持续时间，通常可( )",[239,241,243,245],{"key":20,"text":240,"correct":29},"改变某些工作的逻辑关系",{"key":24,"text":242,"correct":22},"增加某些工作的工作内容",{"key":27,"text":244,"correct":22},"减少某些工作的计划费用",{"key":31,"text":246,"correct":22},"改变某些工作的资源消耗",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},1122983,"矿山工程项目进度控制由于影响因素多，控制技术复杂，因此必须认真进行分析 研究和规划，具体表现在（）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"矿山工程项目是由矿建、土建和机电安装工程项目构成，在控制上具有相对 独立性，有利于实施进度控制",{"key":24,"text":254,"correct":29},"矿山工程项目由多系统组成，这些系统在施工过程中相互关联，相互影响，甚 至会制约工程的实际进度",{"key":27,"text":256,"correct":22},"矿山工程项目涉及较多的大型专用设备安装，实施进度控制将对矿山工程投资 的时间效益产生不利的影响",{"key":31,"text":258,"correct":22},"矿山工程施工条件十分复杂，需要采用科学的方法来进行进度控制并不断调整 工期，争取早日发挥经济效益",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1122984,"工程进度更新的主要工作有（）。",[263,265,267,269],{"key":20,"text":264,"correct":29},"分析进度偏差的原因",{"key":24,"text":266,"correct":22},"投入更多资源加速施工",{"key":27,"text":268,"correct":22},"调整施工合同",{"key":31,"text":270,"correct":22},"修改设计",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},1122985,"矿山工程进度拖延的事后控制措施最关键的是（)。",[275,277,279,280],{"key":20,"text":276,"correct":29},"分析进度拖延的原因",{"key":24,"text":278,"correct":22},"投人更多资源加速施工",{"key":27,"text":268,"correct":22},{"key":31,"text":270,"correct":22},{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":27,"analysis":33},1122986,"矿业工程进度控制必须要优选施工方案，下列优选施工方案的具体措施不正确的 是（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"根据实际情况，综合分析、全面衡量，缩短井巷工程关键线路的工程量",{"key":24,"text":288,"correct":22},"在制定各单位工程施工技术方案时，必须充分考虑自然条件",{"key":27,"text":290,"correct":29},"井巷工程关键路线贯通掘进，以主、副井方向开拓为主，风井为辅",{"key":31,"text":292,"correct":22},"采用的施工工艺、施工装备，要进行方案对比",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":27,"analysis":33},1122987,"某矿施工网络图见图，则该网络计划的总工期是（ ）天。",[297,299,301,303],{"key":20,"text":298,"correct":22},"80",{"key":24,"text":300,"correct":22},"85",{"key":27,"text":302,"correct":29},"90",{"key":31,"text":304,"correct":22},"95",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},1122988,"某矿施工网络图见图，其中B工作的机动时间为（ ）天。",[309,311,313],{"key":20,"text":310,"correct":29},"10",{"key":24,"text":312,"correct":22},"5",{"key":27,"text":314,"correct":22},"2",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":31,"analysis":33},1122989,"关于井巷工程施工的关键路线，以下说法错误的是（）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"矿山井巷工程的内容包括井筒、井底车场巷道及硐室、主要石门、运输大巷及采区巷道等",{"key":24,"text":322,"correct":22},"部分前后连贯的工程构成了全矿井延续距离最长，施工需时最长的工程线路，被称为总进度计划图表上的关键路线，如井筒-井底车场重车线-主要石门-运输大巷-采区车场-采区上山-最后一个采区顺槽或与风井贯通巷道等",{"key":27,"text":324,"correct":22},"井巷工程关键路线决定着矿井的建设工期",{"key":31,"text":326,"correct":29},"优化矿井设计，改变主要关键路线的开始时间，是缩短建井总工期的关键",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":31,"analysis":33},1122990,"关于进度控制的一般性措施，以下说法错误的是（）。",[331,333,335,337],{"key":20,"text":332,"correct":22},"突出关键路线，坚持抓关键路线。",{"key":24,"text":334,"correct":22},"加强生产要素配置管理。配置生产要素是指对劳动力、资金、材料、设备等进行存量、流量、流向分布的调查、汇总、分析、预测和控制",{"key":27,"text":336,"correct":22},"严格控制工序，掌握现场施工实际情况，为计划实施的检査、分析、调整、总结提供原始资料",{"key":31,"text":338,"correct":29},"征得业主的同意后，缩小工程的范围，包括减少工作量或删去一些工作包(或分项工程)",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":24,"analysis":33},1122991,"关于利用横道图计划表示矿业工程项目的施工进度的缺点，以下说法错误的是（）。",[343,345,347,349],{"key":20,"text":344,"correct":22},"不能明确地反映出各项工作之间错综复杂的相互关系。",{"key":24,"text":346,"correct":29},"形象、直观，且易于编制和理解，因而长期以来应用比较普及",{"key":27,"text":348,"correct":22},"不能反映出工作所具有的机动时间",{"key":31,"text":350,"correct":22},"不能反映工程费用与工期之间的关系",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":27,"analysis":33},1122992,"工序质量的控制，可以简单归纳为（）的管理控制循环系统。",[355,357,359,361],{"key":20,"text":356,"correct":22},"实施-检査-处理-总结",{"key":24,"text":358,"correct":22},"实施-检查-归纳-计划",{"key":27,"text":360,"correct":29},"计划-执行-检査-处理",{"key":31,"text":362,"correct":22},"计划-检査-处理-执行",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":20,"analysis":33},1122993,"健全的质量检验制度要求检验工作要从项目开始，即从（）开始，到工序检验、 最后的竣工验收的每个过程；也包括专职质量检验部门和人员的例行的检验工作，以及矿 山工程施工人员的自行的检验规定。",[367,369,371,373],{"key":20,"text":368,"correct":29},"材料、设备订货进场",{"key":24,"text":370,"correct":22},"工序检验",{"key":27,"text":372,"correct":22},"施工人员的自检",{"key":31,"text":374,"correct":22},"专职质量检验部门和人员的检验",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":24,"analysis":33},1122994,"将地面皮带运输走廊选作质量控制点的原因是该工程属于（）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"隐蔽工程",{"key":24,"text":382,"correct":29},"关键部位",{"key":27,"text":384,"correct":22},"施工的薄弱环节",{"key":31,"text":386,"correct":22},"采用新技术的部位",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":20,"analysis":33},1122995,"工程项目的质量计划是由（ ）编制的。",[391,393,395,397],{"key":20,"text":392,"correct":29},"项目经理",{"key":24,"text":394,"correct":22},"各专业工程师",{"key":27,"text":396,"correct":22},"甲方代表",{"key":31,"text":398,"correct":22},"监理工程师",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},1122996,"《质量事故处理报告》由（）编写，然后提交业主或建设单位，并上报有关主管 部门。",[403,404,405,407],{"key":20,"text":396,"correct":22},{"key":24,"text":398,"correct":29},{"key":27,"text":406,"correct":22},"施工单位",{"key":31,"text":408,"correct":22},"质检部门",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},1122997,"按照《建设工程质量管理条例》的规定，建设工程发生质量事故，有关单位应在 ()内向当地建设行政主管部门和其他有关部门报告。",[413,415,417,419],{"key":20,"text":414,"correct":22},"8h",{"key":24,"text":416,"correct":29},"24h",{"key":27,"text":418,"correct":22},"48h",{"key":31,"text":420,"correct":22},"1周",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},1122998,"在工程项目建设过程中，质量控制要贯彻（）方针。",[425,427,429,431],{"key":20,"text":426,"correct":29},"预防为主",{"key":24,"text":428,"correct":22},"三阶段控制",{"key":27,"text":430,"correct":22},"百年大计，质量第一",{"key":31,"text":432,"correct":22},"把材料质量控制放在首位",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":20,"analysis":33},1122999,"建筑工程质量控制要全面控制施工过程，施工阶段质量管理的关键是加强对（） 的质量控制。",[437,439,441,443],{"key":20,"text":438,"correct":29},"工序",{"key":24,"text":440,"correct":22},"分项工程",{"key":27,"text":442,"correct":22},"分部工程",{"key":31,"text":444,"correct":22},"检验批",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":31,"analysis":33},1123000,"关于矿业工程常见施工质量控制点，以下说法错误的是（）。",[449,451,453,455],{"key":20,"text":450,"correct":22},"工程的关键分部、分项及隐蔽工程",{"key":24,"text":452,"correct":22},"工程的关键部位",{"key":27,"text":454,"correct":22},"工程施工的薄弱环节",{"key":31,"text":456,"correct":29},"对后续工程施工或对后续工程质量或安全有重大影响的工序、部位或对象",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":27,"analysis":33},1123001,"将描杆支护钻孔设置为施工质量控制点是由于它是工程的（）。",[461,462,463,465],{"key":20,"text":382,"correct":22},{"key":24,"text":384,"correct":22},{"key":27,"text":464,"correct":29},"关键施工作业",{"key":31,"text":380,"correct":22},{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},1123002,"对工程质量事故进行处理时，首先要进行（）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"事故原因分析",{"key":24,"text":473,"correct":29},"事故调查",{"key":27,"text":475,"correct":22},"采取防护措施",{"key":31,"text":477,"correct":22},"上报",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},1123003,"质量事故的性质通常分为（）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"一般事故和重大事故",{"key":24,"text":485,"correct":22},"主要事故和非主要事故",{"key":27,"text":487,"correct":29},"责任事故和非责任事故",{"key":31,"text":489,"correct":22},"轻微事故和严重事故",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1123005,"在施工阶段工序质量管理的关键是（）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"采用合理的技术措施",{"key":24,"text":497,"correct":29},"加强对施工工序的质量控制",{"key":27,"text":499,"correct":22},"采用合理的设计方案",{"key":31,"text":501,"correct":22},"加大质量控制的投入",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":27,"analysis":33},1123006,"关于施工操作质量和施工技术管理质量，以下说法错误的是（）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"确定工程质量控制的流程；",{"key":24,"text":509,"correct":22},"主动控制工序活动条件，主要指影响工序质量的因素",{"key":27,"text":511,"correct":29},"施工操作质量检查，隐蔽工程的质量检查",{"key":31,"text":513,"correct":22},"及时检査工序质量，提出对后续工作的要求和措施",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},1123007,"关于成品保护，以下说法错误的是（）。",[518,520,522,524],{"key":20,"text":519,"correct":29},"装饰材料、半成品、构配件、设备的质量检查，并检査相应的合格证、质量保证书和试验报告",{"key":24,"text":521,"correct":22},"合理安排施工顺序，避免破坏已有产品",{"key":27,"text":523,"correct":22},"采用适当的保护措施",{"key":31,"text":525,"correct":22},"加强成品保护的检查工作",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1123008,"竣工初验收程序，工程竣工报验单应由（）签署，并向建设单位提出质量评估 报告。",[530,532,533,534],{"key":20,"text":531,"correct":22},"建设单位项目负责人",{"key":24,"text":398,"correct":29},{"key":27,"text":392,"correct":22},{"key":31,"text":535,"correct":22},"造价工程师",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},1123009,"单位工程正式验收时，应由（）来组织各有关单位负责人进行单位工程验收。",[540,542,543,544],{"key":20,"text":541,"correct":29},"建设单位负责人",{"key":24,"text":398,"correct":22},{"key":27,"text":392,"correct":22},{"key":31,"text":535,"correct":22},{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},1123010,"在矿业工程项目质量检验中应优先使用的质量检验方法是（）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"抽査",{"key":24,"text":552,"correct":22},"全检",{"key":27,"text":554,"correct":22},"合格证检査",{"key":31,"text":556,"correct":29},"抽样验收检查",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":27,"analysis":33},1123012,"砌体工程施工时，对不能同时砌筑而又必须留置的临时间断处应砌成斜槎，斜槎 水平投影长度不应小于高度的（）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"1\u002F3",{"key":24,"text":564,"correct":22},"1\u002F2",{"key":27,"text":566,"correct":29},"2\u002F3",{"key":31,"text":568,"correct":22},"3\u002F4",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},1123013,"石材砌筑时，砂浆饱满度不得小于（）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"75%",{"key":24,"text":576,"correct":29},"80%",{"key":27,"text":578,"correct":22},"85%",{"key":31,"text":580,"correct":22},"90%",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":27,"analysis":33},1123014,"排桩宜采取隔桩施工，并应在灌注混凝土（）后进行邻桩成孔施工。",[585,586,588,589],{"key":20,"text":414,"correct":22},{"key":24,"text":587,"correct":22},"12h",{"key":27,"text":416,"correct":29},{"key":31,"text":418,"correct":22},{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":31,"analysis":33},1123015,"地下连续墙施工前宜进行（）试验，确定施工工艺流程，选择操作技术参数。",[594,596,598,600],{"key":20,"text":595,"correct":22},"泥浆配合比",{"key":24,"text":597,"correct":22},"混凝土配合比",{"key":27,"text":599,"correct":22},"c.槽壁稳定性",{"key":31,"text":601,"correct":29},"墙槽成槽",[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]