[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,5,50,1681,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,465,477,489,501,513,525,537,549,561,573,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1122907,1,"单选题","关于钢筋焊接，以下说法错误的是（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","在工程开工或每批钢筋正式焊接前，应进行现象条件下的焊接性能试验。合格后，方可正式生产",false,{"key":24,"text":25,"correct":22},"B","钢筋焊接施工之前，应清除钢筋或钢板焊接部位和与电极接触的钢筋表面上的锈斑油污、杂物等；钢筋端部若有弯折、扭曲时，应予以矫直或切除。进行电阻点焊、闪光对焊、电渣压力焊或埋弧压力焊时，应随时观察电源电压的波动情况",{"key":27,"text":28,"correct":22},"C","对于电阻点焊或闪光对焊，当电源电压下降大于5 % 、小于8 % 时，应采取提高焊接变压器级数的措施；当大于或等于8 % 时，不得进行焊接",{"key":30,"text":31,"correct":32},"D","对于电渣压力焊或埋弧压力焊，当电源电压下降大于15 % 时，不宜进行焊接",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1122908,"关于单层工业厂房的设计特点，以下说法错误的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"单层厂房内一般按水平方向布置生产线。这种厂房结构简单，可以采用大跨度、大进深；便于使用重型起重运输设备，地面上可安装重型设备；可以利用天窗采光、通风。单层厂房的适应性强，既可用于生产重型产品，又可用于生产轻型产品；既可建成大跨度、大面积的，也可建小跨度、小面积的。但是占地大，相应地增加了室外道路、管线和运输线路的长度",{"key":24,"text":41,"correct":22},"厂房可采用单跨或多跨(联跨)平面，各跨多平行布置，也可有垂直跨。厂房多呈矩形，一些热加工车间厂房常采用n 形、L 形。生活用房和辅助用房多沿柱边布置或利用吊车的死角处，也可集中建在厂房附近或贴建于厂房四周，但不宜过多，以免妨碍厂房采光和通风",{"key":27,"text":43,"correct":32},"单层厂房柱距多用5 m ，或者采用10、1 5、20 m等，跨度也采用以5m 为基本参数，以便于构件的定型化。多跨厂房各跨的高度不同，应适当调整，以简化构件和构造处理，改善采光、通风效果",{"key":30,"text":45,"correct":22},"单层厂房结构通常用钢筋混凝土构架体系，特殊高大或有振动的厂房可用钢结构体系。在不需要重型吊车或大型悬挂运输设备时，还可采用薄壳、网架、悬索(见悬挂结构建筑)等大型空间结构，以扩大柱网，增加灵活性",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1122909,"关于模板的安装支设的规定，以下说法错误的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"模板及其支架应具有足够的承载能力和稳定性，能可靠地承受浇筑混凝土的重量、侧压力及施工荷载",{"key":24,"text":53,"correct":22},"要保证工程结构和构件各部分形状尺寸和相互位置的正确",{"key":27,"text":55,"correct":22},"构造简单，装拆方便，并便于钢筋的绑扎和安装，符合混凝土的浇筑和养护等工艺要求",{"key":30,"text":57,"correct":22},"模板的拼(接)缝应严密，不得漏浆",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1122910,"在立井基岩掘进中，钻眼爆破工作是一项主要工序，约占整个掘进循环时间的（）。",[62,64,66,68],{"key":20,"text":63,"correct":32},"20%~30%",{"key":24,"text":65,"correct":22},"30%~40%",{"key":27,"text":67,"correct":22},"40%~50%",{"key":30,"text":69,"correct":22},"50%~60%",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1122911,"在立井施工中，工作面常有积水，要求采用抗水炸药。在实际工程中最为常用的 抗水炸药是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"抗水岩石硝铵炸药",{"key":24,"text":77,"correct":32},"水胶炸药",{"key":27,"text":79,"correct":22},"硝化甘油炸药",{"key":30,"text":81,"correct":22},"铵油炸药",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1122912,"立井井筒施工时，当采用人工手持钻机打眼时，炮眼深度以（）为宜。",[86,88,90,92],{"key":20,"text":87,"correct":22},"1.0~1.5m",{"key":24,"text":89,"correct":32},"1. 5~2.0m",{"key":27,"text":91,"correct":22},"2. 0~2. 5m",{"key":30,"text":93,"correct":22},"2. 5~3. 0m",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1122913,"立井井筒施工时，当采用伞钻打眼时，为充分发挥机械设备的性能，炮眼深度以 ( )为宜。",[98,100,102,104],{"key":20,"text":99,"correct":22},"1. 0~2. Om",{"key":24,"text":101,"correct":22},"2. 0~3. Om",{"key":27,"text":103,"correct":32},"3. 0~6. Om",{"key":30,"text":105,"correct":22},"5. 0~6. Om",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1122914,"在立井施工中，（）是最费工时的工作，它约占整个掘进工作循环时间的50%~ 60%,是决定立井施工速度的关键工作。",[110,112,114,116],{"key":20,"text":111,"correct":32},"装岩与提升工作",{"key":24,"text":113,"correct":22},"钻眼爆破工作",{"key":27,"text":115,"correct":22},"测量工作",{"key":30,"text":117,"correct":22},"支护工作",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1122915,"在立井施工中，目前应用最为广泛的抓岩机械是（ ），它通常固定在吊盘下层 盘或稳绳盘上。",[122,124,126,128],{"key":20,"text":123,"correct":22},"’长绳悬吊抓岩机",{"key":24,"text":125,"correct":32},"中心回转式抓岩机",{"key":27,"text":127,"correct":22},"环行轨道式抓岩机",{"key":30,"text":129,"correct":22},"靠壁式抓岩机",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},1122916,"关于钻井法，以下说法错误的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"钻井法是以钻头刀具破碎岩石，用泥浆或其他介质进行洗井，护壁和排渣，在井筒钻至设计直径和深度后，再进行永久支护的一种机械化凿井方法",{"key":24,"text":137,"correct":22},"钻井法适用于各种不同的地质及工程条件，不仅可用于松散、不稳定的含水层，也可用于钻凿稳定、坚硬岩层中的立井",{"key":27,"text":139,"correct":22},"受钻井设备能力的限制，只能钻凿一定直径和深度的井筒",{"key":30,"text":141,"correct":32},"目前的立井钻井机最大钻井直径不超过11.5 m，最大钻井深度小于 90 0 m",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1122917,"关于帷幕法，以下说法错误的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"帷幕法是超前支护的一种井巷特殊施工方法",{"key":24,"text":149,"correct":22},"实质是预先在井筒或其他地下结构物设计位置的周围，建造一个封闭的圆形或其他形状的混凝土帷幕",{"key":27,"text":151,"correct":32},"深度应穿过不稳定表土层，并嵌入不透水的稳定岩层2~3m，在帷幕的保护下可安全进行掘砌作业，达到顺利通过不稳定含水地层建成井筒，或在不稳定地层中建成地下结构物的目的",{"key":30,"text":153,"correct":22},"目前因成槽机具设备、专业施工队伍和施工技术水平的限制，帷幕法仅适用于深度不超过100 m的含水不稳定表土层中立井和斜井的施工",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},1122918,"立井掘进的通风是由设置在地面的通风机和井内的风筒完成的，常用的通风方式 是（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"串联式",{"key":24,"text":161,"correct":22},"并联式",{"key":27,"text":163,"correct":22},"压入式辅以抽出式",{"key":30,"text":165,"correct":32},"抽出式辅以压入式",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1122919,"立井井筒根据（ ）在时间和空间的不同安排方式，立井井筒施工方式可分为 掘、砌单行作业，掘、砌平行作业，掘、砌混合作业和掘、砌、安一次成井。",[170,172,174,176],{"key":20,"text":171,"correct":32},"掘进、砌壁和安装",{"key":24,"text":173,"correct":22},"掘进、砌壁",{"key":27,"text":175,"correct":22},"砌壁、安装",{"key":30,"text":177,"correct":22},"掘进、安装",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1122920,"立井井筒掘砌混合作业区别于短段单行作业的主要特征是（）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"将井筒划分为若干段高，自上而下逐段施工",{"key":24,"text":185,"correct":32},"浇筑混凝土的同时即可装岩出渣",{"key":27,"text":187,"correct":22},"在同一段高内，按照掘、砌先后交替顺序作业",{"key":30,"text":189,"correct":22},"砌壁是在多层吊盘上，自上而下逐段进行的",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":30,"analysis":33},1122921,"立井井筒掘砌单行作业中，确定井筒掘进段高的因素是（）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"井筒深度、井壁结构、施工技术",{"key":24,"text":197,"correct":22},"井筒大小、支护结构、施工要求",{"key":27,"text":199,"correct":22},"井筒地质条件、井筒直径、施工水平",{"key":30,"text":201,"correct":32},"井筒穿过岩层的性质、涌水量大小、施工速度要求",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":30,"analysis":33},1122922,"立井井筒施工作业方式在选择时，应综合分析和考虑的因素是（）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"井筒位置、大小、深度、施工技术水平、施工进度要求",{"key":24,"text":209,"correct":22},"井筒位置、大小、深度、井筒装备特征、施工进度要求",{"key":27,"text":211,"correct":22},"井筒地质条件、井筒特征、井筒装备内容、施工要求",{"key":30,"text":213,"correct":32},"井筒穿过岩层性质、涌水量的大小、井筒直径和深度、施工工艺及技术装备",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1122923,"立井井筒施工中掘砌单行作业的最大优点是（）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"取消了临时支护，简化了施工工序",{"key":24,"text":221,"correct":32},"工序单一，设备简单，管理方便",{"key":27,"text":223,"correct":22},"省略了长段单行作业中掘、砌转换时间",{"key":30,"text":225,"correct":22},"利用部分支护时间进行装渣出矸，节约工时而提髙成井速度",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1122924,"立井井筒施工综合设备配套机械化作业线及其配套方案适应于（）凿井工程。",[230,232,234,236],{"key":20,"text":231,"correct":32},"井筒直径5.0~10.0m、井筒深度1000m",{"key":24,"text":233,"correct":22},"井筒直径5.0~6. 5m，井筒深度500~800m",{"key":27,"text":235,"correct":22},"井筒直径4. 0~5. 0m，井筒深度400~600m",{"key":30,"text":237,"correct":22},"井筒直径5.0~6. 5m，井筒深度300~500m",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},1122925,"立井井筒施工综合设备配套机械化作业线主要设备配套内容包括（）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"FJD~6伞钻、HS-6抓岩机、3m3吊桶等",{"key":24,"text":245,"correct":22},"FJI>6伞钻、HS-4抓岩机、3m3吊桶等",{"key":27,"text":247,"correct":32},"FJI>9伞钻、HZ-6抓岩机、5m3吊桶等",{"key":30,"text":249,"correct":22},"FJD~9伞钻、HK-4抓岩机、5m3吊桶等",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":30,"analysis":33},1122926,"下列关于地面预注浆堵水的说法中正确的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"含水层距地表较深时，采用地面预注浆较为合适",{"key":24,"text":257,"correct":22},"地面预注浆的钻注浆孔和注浆工作都可在建井期同时进行",{"key":27,"text":259,"correct":22},"钻孔布置在大于井筒掘进直径3~5m的圆周上",{"key":30,"text":261,"correct":32},"注浆时，若含水层比较薄，可将含水岩层一次注完全深",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1122927,"下列关于壁后注浆加固封水的说法正确的是（）。",[266,268,270,272],{"key":20,"text":267,"correct":32},"井筒围岩裂隙较大、出水较多的地段，应在砌壁时预埋注浆管",{"key":24,"text":269,"correct":22},"壁后注浆，一般是自下而上分段进行",{"key":27,"text":271,"correct":22},"注浆段高，视含水层赋存条件和具体出水点位置而定，一般段高为10~15m",{"key":30,"text":273,"correct":22},"注浆孔的深度应透过井壁进入含水岩层50~100mm",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},1122928,"在立井井筒施工中，表土层是否稳定对施工方式和进度影响很大，属于稳定表土 的是（）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"淤泥层",{"key":24,"text":281,"correct":22},"浸水的大孔隙土层",{"key":27,"text":283,"correct":32},"含非饱和水的黏土层",{"key":30,"text":285,"correct":22},"膨胀土",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},1122930,"井筒表土特殊施工法中和治水关系密切的两种方法是（）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"冻结法、钻井法",{"key":24,"text":293,"correct":22},"沉井法、注浆法",{"key":27,"text":295,"correct":32},"冻结法、注浆法",{"key":30,"text":297,"correct":22},"沉井法、钻井法",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1122932,"当井筒较深时，常用的通风方式是（）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"压入式通风",{"key":24,"text":305,"correct":32},"抽出式为主，辅以压入式通风",{"key":27,"text":307,"correct":22},"抽出式通风",{"key":30,"text":309,"correct":22},"压入式为主，辅以抽出式通风",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},1122933,"立井施工的辅助系统不包括（）。",[314,316,318,320],{"key":20,"text":315,"correct":32},"出矸系统",{"key":24,"text":317,"correct":22},"通风系统",{"key":27,"text":319,"correct":22},"排水系统",{"key":30,"text":321,"correct":22},"井筒测量",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},1122934,"立井井筒施工采用短段掘砌单行作业方式时，现浇混凝土井壁施工一般采用（）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"木模板",{"key":24,"text":329,"correct":32},"金属伸缩式活动模板",{"key":27,"text":331,"correct":22},"整体滑升金属模板",{"key":30,"text":333,"correct":22},"金属拆卸式模板",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":30,"analysis":33},1122935,"某立井井筒净直径为6. 5m,深度为750m，其中表土段深度为150m，则该井筒 表土段应当采用（）施工，才能确保井筒的施工安全，并获得可靠的进度指标。",[338,340,342,344],{"key":20,"text":339,"correct":22},"井圈背板普通法",{"key":24,"text":341,"correct":22},"吊挂井壁法",{"key":27,"text":343,"correct":22},"板桩法",{"key":30,"text":345,"correct":32},"冻结法",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},1122936,"某立井井筒净直径为5. 5m,深度650m，基岩段施工采用高度3. 5m的金属伸缩 式模板砌壁，工作面常用伞钻打眼的合理炮眼深度应为（）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"2. 0m",{"key":24,"text":353,"correct":22},"3. 0m",{"key":27,"text":355,"correct":32},"4. 0m",{"key":30,"text":357,"correct":22},"5. 0m",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},1122937,"立井井筒表土段采用冻结法施工时，其水文观测孔应该布置在（）。",[362,364,366,368],{"key":20,"text":363,"correct":32},"井筒掘进断面内",{"key":24,"text":365,"correct":22},"井筒冻结圈上",{"key":27,"text":367,"correct":22},"井筒掘进断面外",{"key":30,"text":369,"correct":22},"井筒附近",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1122938,"立井井筒表土段施工为冻结法施工时，其冻结深度应穿过风化带延深至稳定的基 岩（ ）以上。",[374,376,378,380],{"key":20,"text":375,"correct":22},"8m",{"key":24,"text":377,"correct":32},"10m",{"key":27,"text":379,"correct":22},"15m",{"key":30,"text":381,"correct":22},"20m",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":27,"analysis":33},1122939,"立井井筒基岩段采用爆破法掘进施工，通常采用伞形钻架打眼，伞形钻架一次钻 眼深度一般为（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"2m以下",{"key":24,"text":389,"correct":22},"2~3m",{"key":27,"text":391,"correct":32},"3~5m",{"key":30,"text":393,"correct":22},"5m以上",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1122940,"关于钻眼爆破工作的爆破参数，以下说法错误的是（）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"爆破参数包括炮眼深度、炮眼数目、炸药消耗量等",{"key":24,"text":401,"correct":32},"炮眼深度一般根据岩石性质、凿岩爆破器材的性能以及合理的循环工作组织决定的。采用人工手持钻机打眼时，以3.0~5.0 m为宜；当采用伞钻打眼时，为充分发挥机械设备的性能，以1.5~2.0 m为宜",{"key":27,"text":403,"correct":22},"炮眼数目和炸药消耗量与岩石性质、井筒断面大小和炸药性能等因素有关",{"key":30,"text":405,"correct":22},"合理的炮眼数目和炸药消耗量，应该是在保证最优爆破效果下爆破器材消耗量最少",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},1122941,"关于吊挂井壁施工法，以下说法错误的是（）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"吊挂井壁施工法是适用于稳定性较差的土层中的一种短段掘砌施工方法。为保持土的稳定性，减少土层的裸露时间，段高一般取0.5~1. 5 m。并按土层条件，分别采用台阶式或分段分块，并配以超前小井降低水位的挖掘方法。",{"key":24,"text":413,"correct":22},"吊挂井壁施工中，因段高小，不必进行临时支护。但由于段高小，每段井壁与土层的接触面积小，土对井壁的围抱力小，为了防止井壁在混凝土尚未达到设计强度前失去自身承载能力，引起井壁拉裂或脱落，必须在井壁内设置钢筋，并与上段井壁吊挂",{"key":27,"text":415,"correct":32},"这种施工方法可适用于渗透系数大于10 m \u002F d，流动性小，水压不大于2 M P a的砂层和透水性强的卵石层，以及岩石风化带。吊挂井壁法使用的设备简单，施工安全",{"key":30,"text":417,"correct":22},"它的工序转换频繁，井壁接茬多，封水性差。故常在通过整个表土层后，自下而上复砌第二层井壁。为此，需按井筒设计规格，适当扩大掘进断面",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":30,"analysis":33},1122942,"关于板桩施工法，以下说法错误的是（）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"对于厚度不大的不稳定表土层，在开挖之前，可先用人工或打桩机在工作面或地面沿井筒荒径依次打入一圈板桩，形成一个四周密封的圆筒，用以支承井壁，并在它的保护下进行掘进",{"key":24,"text":425,"correct":22},"板桩材料可采用木材和金属材料两种。木板粧多采用坚韧的松木或柞木制成，彼此采用尖形接榫。金属板桩常用1 2号槽钢相互正反扣合相接。根据板桩人土的难易程度可逐次单块打人，也可多块并成一组，分组打入",{"key":27,"text":427,"correct":22},"对于木板桩一般比金属板桩取材容易，制作简单，但刚度小，人土困难，板桩间连接紧密性差，故用于厚度为3~6 m 的不稳定土层",{"key":30,"text":429,"correct":32},"金属板桩可根据打桩设备的能力条件，适用于厚度6~8 m的不稳定土层，若与其他方法相结合，其应用深度可较大",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},1122943,"关于表土施工降水工作，以下说法错误的是（）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"井筒表土普通施工法中应特别注意水的处理，",{"key":24,"text":437,"correct":22},"一般可采用降低水位法增加施工土层的稳定性",{"key":27,"text":439,"correct":32},"工作面降低水位法：在不稳定土层中，常采用工作面超前小井方法来降低水位。它们都是在井筒中用泵抽水，使周围形成降水漏斗，变为水位下降的疏干区，以增加施工土层的稳定性。工作面降低水位法仅有工作面超前小井降低水位法一种",{"key":30,"text":441,"correct":22},"井外疏干孔降低水位法：这种方法是在预定的井筒周围打钻孔，并深人不透水层，然后用泵在孔中抽水，形成降水漏斗，使工作面水位下降，保持井筒工作面在无水情况下施工",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},1122944,"巷道与硐室施工时，一般不可能采用（）进行钻眼作业。",[446,448,450,452],{"key":20,"text":447,"correct":22},"气腿式凿岩机",{"key":24,"text":449,"correct":22},"凿岩台车",{"key":27,"text":451,"correct":32},"伞形钻架",{"key":30,"text":453,"correct":22},"钻装机",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},1122945,"巷道与硐室钻眼爆破施工时，当采用气腿式凿岩机钻眼时，炮眼的深度一般取（ ）。",[458,460,462,463],{"key":20,"text":459,"correct":22},"1. 2 ~2. Om",{"key":24,"text":461,"correct":32},"1. 6 ~2. 5m",{"key":27,"text":101,"correct":22},{"key":30,"text":464,"correct":22},"2. 5~3. 5m",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},1122947,"岩巷巷道掘进钻眼爆破工作中，工作面爆破时的装药结构一般宜采用（)，一 次爆破。",[469,471,473,475],{"key":20,"text":470,"correct":32},"反向装药结构",{"key":24,"text":472,"correct":22},"正向装药结构",{"key":27,"text":474,"correct":22},"间隔装药结构",{"key":30,"text":476,"correct":22},"藕合装药结构",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},1122948,"井巷工程施工爆破时，井工矿井如遇有瓦斯，起爆总延时不应大于（）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"100ms",{"key":24,"text":484,"correct":32},"130ms",{"key":27,"text":486,"correct":22},"150ms",{"key":30,"text":488,"correct":22},"180ms",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":30,"analysis":33},1122949,"巷道掘进时的装渣和出渣是最繁重、最费工时的工序，目前装淹主要采用机械设 备进行，但巷道掘进装渣设备一般不采用（）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"铲斗式装岩机",{"key":24,"text":496,"correct":22},"耙斗式装岩机",{"key":27,"text":498,"correct":22},"立爪式装岩机",{"key":30,"text":500,"correct":32},"悬吊式抓岩机",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":20,"analysis":33},1122950,"巷道掘进装岩过程中，工作面调车装载机的工时利用率接近100%的调车方法是( )",[505,507,509,511],{"key":20,"text":506,"correct":32},"利用转载设备进行调车",{"key":24,"text":508,"correct":22},"活动错车场调车法",{"key":27,"text":510,"correct":22},"固定错车场调车法",{"key":30,"text":512,"correct":22},"浮放错车场调车法",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":27,"analysis":33},1122951,"关于钻眼爆破法施工的临时支护，以下说法错误的是（）。",[517,519,521,523],{"key":20,"text":518,"correct":22},"巷道临时支护主要是保证掘进工作面的安全，因此临时支护一般都必须紧跟工作面，同时临时支护又是永久支护的一部分。",{"key":24,"text":520,"correct":22},"锚喷巷道的临时支护，通常是在单体液压支柱的掩护下快速打设一定数量的护顶锚杆并挂网喷浆。打设护顶锚杆只允许使用锚杆钻机，严禁使用风动凿岩机；护顶锚杆的数量可根据断面大小确定，一般以打到起拱线为准",{"key":27,"text":522,"correct":32},"金属支架支护巷道的临时支护，一般使用前探梁的方式来实现。前探梁为长度6米左右的1 1 #矿用工字钢并悬吊在顶梁上",{"key":30,"text":524,"correct":22},"放炮结束后，前移前探梁使其前端抵住山墙，固定好后在前探梁上放置顶梁并用背板背实，以保证在下面作业的人员的安全",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1122952,"目前，矿山巷道永久支护一般以（）方法为主。",[529,531,533,535],{"key":20,"text":530,"correct":22},"金属锚杆支架支护",{"key":24,"text":532,"correct":32},"锚喷支护",{"key":27,"text":534,"correct":22},"金属棚子支护",{"key":30,"text":536,"correct":22},"前探支架支护",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":24,"analysis":33},1122953,"关于钻眼爆破法施工的永久支护，以下说法错误的是（）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"锚喷支护可根据工作面围岩情况选用单一锚杆支护、喷射混凝土支护、锚杆与喷射混凝土支护以及锚杆加喷射混凝土加金属网联合支护。锚喷支护的施工包括锚杆的施工和喷射混凝土作业。锚杆施工先钻凿锚杆孔，然后安装锚杆。喷射混凝土施工一般采用混凝土喷射机(喷浆机)进行作业，喷射作业可一掘一喷或两掘一喷以至三掘一喷。",{"key":24,"text":544,"correct":32},"金属支架支护时，支架的安装要保证柱腿的稳固，底板较松软时要穿鞋，背板对接要均匀，背板和顶帮之间的空隙要充填严密，倾斜巷道架设要有13°~35°的迎山角",{"key":27,"text":546,"correct":22},"整体式支护主要是砌碹支护和现浇混凝土支护。砌碹支护使用的材料是砌块，砌筑施工包括碹胎架设和砌块敷设。砌碹施工应采用前进式，工作人员必须处于基本安全的条件下进行作业。现浇混凝土施工首先要立模，模板可采用钢模板或木模板，模板应保证位置正确和稳固，砌筑顺序应为先墙后拱，最后封顶。拆模应在混凝土达到一定强度后方可进行",{"key":30,"text":548,"correct":22},"在岩石较为破碎及地压较大时，采用双层锚网喷或锚网喷金属支架复合支护。大断面硐室施工时一般采用先锚喷支护，然后进行现浇混凝土支护的复合支护方式",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":24,"analysis":33},1122954,"在常规设备条件下，全断面一次掘进砸室的髙度，一般不得超过（）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"2 ~3m",{"key":24,"text":556,"correct":32},"4~5m",{"key":27,"text":558,"correct":22},"5~6m",{"key":30,"text":560,"correct":22},"7 ~8m",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":27,"analysis":33},1122955,"正台阶工作面(下行分层)施工法按照硐室的高度，整个断面可分为2个以上分 层，每分层的高度以（）为宜。",[565,567,569,571],{"key":20,"text":566,"correct":22},"1. 0~2. 0m",{"key":24,"text":568,"correct":22},"1. 5 ~2. 5m",{"key":27,"text":570,"correct":32},"1. 8~3. 0m",{"key":30,"text":572,"correct":22},"2. 0~4. 0m",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":30,"analysis":33},1122956,"当地质条件复杂且硐室断面特大时，通常采用（）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"全断面施工法",{"key":24,"text":580,"correct":22},"分层施工法",{"key":27,"text":582,"correct":22},"分次施工法",{"key":30,"text":584,"correct":32},"导硐施工法",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":30,"analysis":33},1122957,"巷道施工机械化作业线设备的配套，应保证各工序所使用的机械设备在生产能力 上的匹配合理，下列配套方案不合理的是（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":22},"多台气腿式凿岩机、耙斗式装载机、浮放道岔调车、矿车及电机车运输",{"key":24,"text":592,"correct":22},"多台气腿式凿岩机、蟹爪式装载机、梭式矿车及电机车运输",{"key":27,"text":594,"correct":22},"凿岩台车、铲斗侧卸式装载机、胶带转载机、矿车及电机车运输",{"key":30,"text":596,"correct":32},"钻装机、铲斗侧卸式装载机、胶带转载机、矿车及电机车运输",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":30,"analysis":33},1122961,"巷道采用下山施工法时，要特别注意（）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"提升问题",{"key":24,"text":604,"correct":22},"通风问题",{"key":27,"text":606,"correct":22},"支护问题",{"key":30,"text":608,"correct":32},"跑车事故",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":20,"analysis":33},1122962,"某运输大巷长度2500m，半圆拱断面，净段面积15m2，该巷道应当采用（）。",[613,615,617,619],{"key":20,"text":614,"correct":32},"全断面施工方法",{"key":24,"text":616,"correct":22},"导硐施工方法",{"key":27,"text":618,"correct":22},"台阶施工方法",{"key":30,"text":620,"correct":22},"分断面施工方法",[622,625,628,631,634,637],{"id":15,"name":623,"category":7,"favorite":624},"领导干部任职前廉政法规知识测试题",92,{"id":626,"name":627,"category":7,"favorite":15},595,"建筑结构与设备",{"id":629,"name":630,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":632,"name":633,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":635,"name":636,"category":7,"favorite":8},534,"BIM工程师",{"id":638,"name":636,"category":7,"favorite":8},535]