[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":737},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,33,50,1681,[13,38,53,68,83,98,112,127,142,156,170,184,199,213,227,242,256,270,284,298,313,327,341,356,370,385,399,413,427,441,455,469,484,498,512,526,540,554,569,583,597,612,626,640,654,668,681,695,709,723],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1124381,2,"多选题","矿业工程项目现场管理中为防止重大灾害发生，对现场存在的危险因素进行控制，通常煤矿上所说的“一通三防”管理，具体是指（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","通风",true,{"key":24,"text":25,"correct":22},"B","防瓦斯",{"key":27,"text":28,"correct":29},"C","防水",false,{"key":31,"text":32,"correct":22},"D","综合防尘",{"key":34,"text":35,"correct":22},"E","防灭火","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1124382,"立井提升运输的基本要求包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"严禁在同一罐笼内人员和物料混合提升",{"key":24,"text":45,"correct":29},"罐笼升降人员时的最大速度不得超过20m／s",{"key":27,"text":47,"correct":22},"吊桶提升应采用不旋转提升钢丝绳",{"key":31,"text":49,"correct":22},"吊桶上方必须装保护伞",{"key":34,"text":51,"correct":29},"必要时可采用底卸式吊桶升降人员","ACD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1124383,"矿山工程防尘工作的主要要求是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"井巷掘进时必须采取湿式凿岩",{"key":24,"text":60,"correct":29},"缺水地区或湿式凿岩有困难的地点可进行干式凿岩",{"key":27,"text":62,"correct":22},"在易产生粉尘的作业地点应采取专门的洒水防尘措施",{"key":31,"text":64,"correct":29},"风流中的粉尘应采取密闭抽尘措施来降尘",{"key":34,"text":66,"correct":22},"对在易产生矿尘作业点的施工人员要加强个体防护","ACE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1124384,"《职业健康安全管理体系——规范》强调按系统理论管理职业健康安全及其相关事务，以达到预防和减少生产事故和劳动疾病的目的，通过（ ）环节构成一个动态循环并螺旋上升的系统化管理模式。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"策划",{"key":24,"text":75,"correct":22},"行动",{"key":27,"text":77,"correct":22},"检查",{"key":31,"text":79,"correct":22},"改进",{"key":34,"text":81,"correct":29},"优化","ABCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1124385,"以下叙述不正确的有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"劳动行政主管部门和管理矿山企业的主管部门接到死亡事故或者一次重伤4人以上的事故报告后，应当立即报告本级人民政府，并报各自的上一级主管部门",{"key":24,"text":90,"correct":22},"发生伤亡事故，矿山企业和有关单位应当保护事故现场，因抢救事故，需要移动现场部分物品时，可不作出标志，知道即可",{"key":27,"text":92,"correct":29},"矿山发生事故后，事故现场有关人员应当立即报告矿长或者有关主管人员",{"key":31,"text":94,"correct":29},"矿山应当有保障安全生产、预防事故和职业危害的安全设施",{"key":34,"text":96,"correct":22},"矿山事故调查处理工作必须自事故发生之日起60d内结束，处理结案后，应当公布处理结果","ABE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":36,"analysis":37},1124386,"事故处理坚持“四不放过”原则，其包括（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"事故原因不查清不放过",{"key":24,"text":105,"correct":22},"责任人员未处理不放过",{"key":27,"text":107,"correct":29},"没有吸取教育不放过",{"key":31,"text":109,"correct":22},"有关人员未受到教育不放过",{"key":34,"text":111,"correct":22},"整改措施未落实不放过",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1124387,"现阶段用于矿井的灭火技术主要有（ ）以及新型的凝胶灭火、泡沫灭火等技术手段。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"灌浆灭火",{"key":24,"text":119,"correct":29},"灌水灭火",{"key":27,"text":121,"correct":22},"均压灭火",{"key":31,"text":123,"correct":22},"阻化灭火",{"key":34,"text":125,"correct":22},"惰气压注灭火","ACDE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1124388,"防止瓦斯引燃引爆的主要措施有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"严禁携带烟草和点火物品下井",{"key":24,"text":134,"correct":22},"防止爆破引燃引爆瓦斯",{"key":27,"text":136,"correct":22},"防止机械摩擦火花引燃瓦斯",{"key":31,"text":138,"correct":29},"人井人员严禁穿纯棉衣服",{"key":34,"text":140,"correct":29},"井下应采用气焊和喷灯焊接","ABC",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":126,"analysis":37},1124389,"矿业工程施工安全管理的基本要求包括（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"建立健全以安全生产责任制为核心的各项安全生产规章制度",{"key":24,"text":149,"correct":29},"编制和督促实施安全施工进度计划",{"key":27,"text":151,"correct":22},"有计划地组织职工进行技术培训和安全教育",{"key":31,"text":153,"correct":22},"建立健全有关安全生产的记录和档案资料",{"key":34,"text":155,"correct":22},"建立专门的安全机构或配备相适应的专职安全人员",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":82,"analysis":37},1124390,"国家对矿山建设企业的安全生产管理和监督的要求包括（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"矿山企业必须具有保障安全生产的设施，建立、健全安全管理制度",{"key":24,"text":163,"correct":22},"国务院劳动行政主管部门对全国矿山安全工作实施统一监督",{"key":27,"text":165,"correct":22},"矿山企业必须建立、健全安全生产责任制",{"key":31,"text":167,"correct":22},"矿山企业工会发现企业行政方面违章指挥等危及职工生命安全的情况时，有权提出解决问题的建议",{"key":34,"text":169,"correct":29},"矿山企业发生安全生产事故，可直接内部处理",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":52,"analysis":37},1124391,"矿体及其周围虽有水存在，但只有通过某种通道，它们才能进入井巷形成涌水或突水，自然形成的涌水通道通常有（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"地层的裂隙与断裂带",{"key":24,"text":177,"correct":29},"顶板冒落形成的裂隙通道",{"key":27,"text":179,"correct":22},"岩溶通道",{"key":31,"text":181,"correct":22},"孔隙通道",{"key":34,"text":183,"correct":29},"钻孔形成的通道",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1124392,"矿井火灾的预防措施主要应着重于（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"A：制定严格的防火制度",{"key":24,"text":191,"correct":22},"B：加强日常的管理与检查",{"key":27,"text":193,"correct":22},"C：做好通风工作",{"key":31,"text":195,"correct":29},"D：严禁采用可燃材料",{"key":34,"text":197,"correct":22},"E：制定专门措施","ABCE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":82,"analysis":37},1124393,"对于有瓦斯危害的矿井,以下预防瓦斯安全事故措施正确的有（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"必须采用机械通风",{"key":24,"text":206,"correct":22},"掘进工作面应采用独立通风",{"key":27,"text":208,"correct":22},"坚持相应的瓦斯检查制度",{"key":31,"text":210,"correct":22},"电动机附近20m内风流瓦斯浓度达1.5%时应撤出人员,切断电源",{"key":34,"text":212,"correct":29},"风机因停电而停运时,待来电后应立即开动风机恢复通风",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":36,"analysis":37},1124394,"矿山工程施工中，冒顶片帮的辨识是（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"采空区顶板发出闷雷声",{"key":24,"text":220,"correct":22},"工作面支架开始变形或发出劈裂声",{"key":27,"text":222,"correct":29},"底鼓严重",{"key":31,"text":224,"correct":22},"岩壁变松发生片帮",{"key":34,"text":226,"correct":22},"顶板裂隙增大、顶板掉渣或局部漏顶",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":241,"analysis":37},1124395,"巷道运输的安全要求是（ ）。",[231,233,235,237,239],{"key":20,"text":232,"correct":29},"矿井采用人力推车时，每次最多只准推2辆车",{"key":24,"text":234,"correct":22},"井下长距离运输采用人车运送人员时，列车行驶速度不得超过4m／s",{"key":27,"text":236,"correct":22},"严禁使用固定车厢式矿车、翻转车厢式矿车、底卸式矿车、材料车和平板车等运送人员",{"key":31,"text":238,"correct":29},"在含有瓦斯的矿井主要运输巷道内，禁止使用架线电机车进行运输",{"key":34,"text":240,"correct":22},"在高瓦斯矿井主要运输巷道内，应使用矿用防爆特殊型蓄电池机车或矿用防爆柴油机车","BCE",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":82,"analysis":37},1124396,"工程施工安全管理方面的基本制度有（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"安全生产责任制",{"key":24,"text":249,"correct":22},"安全技术教育与培训制度",{"key":27,"text":251,"correct":22},"安全检查制度",{"key":31,"text":253,"correct":22},"职工伤亡事故管理制度",{"key":34,"text":255,"correct":29},"设备检查制度",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":82,"analysis":37},1124397,"在施工过程中，发生事故后，事故报告应当包括的内容有（ ）。",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"事故发生单位概况",{"key":24,"text":263,"correct":22},"事故发生的时间、地点以及事故现场情况",{"key":27,"text":265,"correct":22},"事故已经造成或者可能造成的伤亡人数（包括下落不明的人数）和初步估计的直接经济损失",{"key":31,"text":267,"correct":22},"已经采取的措施",{"key":34,"text":269,"correct":29},"已经处分的相关责任人",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":198,"analysis":37},1124398,"发生伤亡事故后，施工单位应当立即报告（ ）。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"建设单位",{"key":24,"text":277,"correct":22},"当地安全管理部门",{"key":27,"text":279,"correct":22},"企业主管部门",{"key":31,"text":281,"correct":29},"公安部门",{"key":34,"text":283,"correct":22},"监理单位",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":126,"analysis":37},1124399,"在煤矿生产施工中，通常造成职工伤亡事故的危害因素有（ ）。",[288,290,292,294,296],{"key":20,"text":289,"correct":22},"A：瓦斯爆炸",{"key":24,"text":291,"correct":29},"B：辐射",{"key":27,"text":293,"correct":22},"C：透水",{"key":31,"text":295,"correct":22},"D：冒顶片帮",{"key":34,"text":297,"correct":22},"E：火灾",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":312,"analysis":37},1124400,"我国环境保护的基本原则包括（ ）等",[302,304,306,308,310],{"key":20,"text":303,"correct":29},"严格遵循蘸工规范",{"key":24,"text":305,"correct":29},"禁止批准有污染源的矿山开发项目",{"key":27,"text":307,"correct":22},"经济建设与环境保护协调发展",{"key":31,"text":309,"correct":22},"以防为主、防治结合、综合治理",{"key":34,"text":311,"correct":22},"堆开发谁保护,谁破坏谁治理","CDE",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":241,"analysis":37},1124401,"尾矿的处理方法应符合的要求是（ ）。",[317,319,321,323,325],{"key":20,"text":318,"correct":29},"应考虑“三废”处理技术的可能性和可靠性",{"key":24,"text":320,"correct":22},"对有现实利用价值的尾矿要考虑综合利用的要求",{"key":27,"text":322,"correct":22},"充分回收利用尾矿澄清水，少向下游排放",{"key":31,"text":324,"correct":29},"根据尾矿输送量的大小可采用单轨或双轨运输",{"key":34,"text":326,"correct":22},"尾矿贮存设施必须有防止尾矿流失和尾矿尘飞扬的措施",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":97,"analysis":37},1124402,"工程建设过程中的环境保护措施体现在（ ）。",[331,333,335,337,339],{"key":20,"text":332,"correct":22},"严格管理，尽量不产生废料污染环境",{"key":24,"text":334,"correct":22},"兼顾周边环境，保护植被",{"key":27,"text":336,"correct":29},"禁止就地取水",{"key":31,"text":338,"correct":29},"各种垃圾就地进行掩埋",{"key":34,"text":340,"correct":22},"加强个人安全防护工作",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":355,"analysis":37},1124403,"矿山施工调度工作基础是（ ），调度部门无权改变作业计划的内容。",[345,347,349,351,353],{"key":20,"text":346,"correct":29},"施工技术先进",{"key":24,"text":348,"correct":29},"施工管理严格",{"key":27,"text":350,"correct":22},"施工作业计划",{"key":31,"text":352,"correct":29},"施工作业规程",{"key":34,"text":354,"correct":22},"施工组织设计","CE",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":52,"analysis":37},1124404,"矿业工程施工对环境的影响直接表现为（ ）。",[360,362,364,366,368],{"key":20,"text":361,"correct":22},"地下开挖导致生态环境失衡",{"key":24,"text":363,"correct":29},"地下开挖导致围岩压力变化",{"key":27,"text":365,"correct":22},"地下开挖可能引起周围建筑物不均衡变形而产生开裂、倒塌",{"key":31,"text":367,"correct":22},"地下开挖有大量废水、废渣和废气排放，直接危害施工人员",{"key":34,"text":369,"correct":29},"地下开挖消耗大量木材",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":384,"analysis":37},1124405,"以下有关矿产开发中的放射性污染防治的有关叙述不准确的有（ ）。",[374,376,378,380,382],{"key":20,"text":375,"correct":29},"与铀（钍）矿和伴生放射性矿开发利用建设项目相配套的放射性污染防治设施，应当与主体工程同时设计、分批施工、依次投人使用",{"key":24,"text":377,"correct":22},"对铀（钍）矿的流出物和周围的环境实施监测，并及时向国务院环境保护行政主管部门和所在地省、自治区、直辖市人民政府环境保护行政主管部门报告监测结果",{"key":27,"text":379,"correct":22},"对产生的尾矿应在指定的地点贮存、处置",{"key":31,"text":381,"correct":22},"开发利用或者关闭铀（钍）矿的单位，应当在申请领取采矿许可证或者办理退役审批手续前编制环境影响报告书，报市级以上人民政府环境保护行政主管部门审查批准",{"key":34,"text":383,"correct":22},"国家对放射性污染的防治，实行预防为主、治理为辅、严格监督、确保安全的方针","BCDE",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":97,"analysis":37},1124406,"处理细粒含水尾矿的设施，一般由（ ）几个系统组成。",[389,391,393,395,397],{"key":20,"text":390,"correct":22},"尾矿水力输送系统",{"key":24,"text":392,"correct":22},"尾矿库系统",{"key":27,"text":394,"correct":29},"回收系统",{"key":31,"text":396,"correct":29},"废水处理系统",{"key":34,"text":398,"correct":22},"排水（包括回水）系统",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":141,"analysis":37},1124407,"矿山建设过程中由于开挖引起的对环境的影响有（ ）。",[403,405,407,409,411],{"key":20,"text":404,"correct":22},"地表下沉",{"key":24,"text":406,"correct":22},"房屋开裂",{"key":27,"text":408,"correct":22},"土地开裂",{"key":31,"text":410,"correct":29},"气候变暖",{"key":34,"text":412,"correct":29},"地下水上升",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":67,"analysis":37},1124408,"环境保护工程具有完整的设计体系和施工、验收程序，严格执行“三同时”政策，其中“三同时”是指（ ）。",[417,419,421,423,425],{"key":20,"text":418,"correct":22},"同时设计",{"key":24,"text":420,"correct":29},"同时竣工",{"key":27,"text":422,"correct":22},"同时施工",{"key":31,"text":424,"correct":29},"同时验收",{"key":34,"text":426,"correct":22},"同时投产",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":67,"analysis":37},1124409,"矿业工程项目现场管理有关提升运输系统管理的主要内容包括（ ）。",[431,433,435,437,439],{"key":20,"text":432,"correct":22},"建立完善的提升机房管理制度",{"key":24,"text":434,"correct":29},"建立严格的提升机运行制度",{"key":27,"text":436,"correct":22},"严格遵循提升机房的管理制度",{"key":31,"text":438,"correct":29},"严格遵照规范井下设备的管理",{"key":34,"text":440,"correct":22},"落实提升系统的安全、正常运行措施",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":97,"analysis":37},1124410,"矿业工程项目的现场管理工作的重点应着手于（ ）。",[445,447,449,451,453],{"key":20,"text":446,"correct":22},"现场制度管理",{"key":24,"text":448,"correct":22},"现场技术管理",{"key":27,"text":450,"correct":29},"现场生产管理",{"key":31,"text":452,"correct":29},"现场环境管理",{"key":34,"text":454,"correct":22},"“一通三防”管理",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":36,"analysis":37},1124412,"井巷工程的分项工程主要按（ ）等划分。",[459,461,463,465,467],{"key":20,"text":460,"correct":22},"施工工序",{"key":24,"text":462,"correct":22},"工种",{"key":27,"text":464,"correct":29},"施工设备",{"key":31,"text":466,"correct":22},"施工工艺",{"key":34,"text":468,"correct":22},"材料",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":483,"analysis":37},1124413,"矿业工程施工质量控制的特点有（ ）。",[473,475,477,479,481],{"key":20,"text":474,"correct":29},"多发性",{"key":24,"text":476,"correct":22},"复杂性",{"key":27,"text":478,"correct":22},"连续性",{"key":31,"text":480,"correct":22},"隐蔽性",{"key":34,"text":482,"correct":29},"有效性","BCD",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":82,"analysis":37},1124414,"施工单位的项目管理目标体系包括工程施工（ ）。",[488,490,492,494,496],{"key":20,"text":489,"correct":22},"工程质量",{"key":24,"text":491,"correct":22},"成本",{"key":27,"text":493,"correct":22},"工期",{"key":31,"text":495,"correct":22},"安全和现场标准化",{"key":34,"text":497,"correct":29},"文明施工",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":141,"analysis":37},1124415,"根据《煤矿井巷工程质量验收规范》GB 50213-2010的规定，工程项目的质量验收划分包括（ ）。",[502,504,506,508,510],{"key":20,"text":503,"correct":22},"分部工程",{"key":24,"text":505,"correct":22},"子分部工程",{"key":27,"text":507,"correct":22},"分项工程",{"key":31,"text":509,"correct":29},"子分项工程",{"key":34,"text":511,"correct":29},"检验批",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":483,"analysis":37},1124416,"矿业工程是大型综合性建设项目，除了生产系统复杂外，还具有（ ）的特点。",[516,518,520,522,524],{"key":20,"text":517,"correct":29},"施工组织简单",{"key":24,"text":519,"correct":22},"工程投资大",{"key":27,"text":521,"correct":22},"建设周期长",{"key":31,"text":523,"correct":22},"组织关系复杂",{"key":34,"text":525,"correct":29},"对环境影响小",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":198,"analysis":37},1124417,"矿业工程项目的分部工程是按工程的主要部位划分的，它们是单位工程的组成部分，下列属于井筒的分部工程是（ ）。",[530,532,534,536,538],{"key":20,"text":531,"correct":22},"井筒壁座",{"key":24,"text":533,"correct":22},"井筒冻结",{"key":27,"text":535,"correct":22},"井筒防治水",{"key":31,"text":537,"correct":29},"井筒混凝土支护",{"key":34,"text":539,"correct":22},"井筒井窝",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":82,"analysis":37},1124418,"矿业工程的施工项目管理分为（ ）。",[544,546,548,550,552],{"key":20,"text":545,"correct":22},"业主的项目管理（建设监理）",{"key":24,"text":547,"correct":22},"总承包单位的项目管理",{"key":27,"text":549,"correct":22},"设计单位的项目管理",{"key":31,"text":551,"correct":22},"施工单位的项目管理",{"key":34,"text":553,"correct":29},"监管单位的项目管理",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":568,"analysis":37},1124419,"根据国家《矿产资源法》的规定，无论地表或地下的矿产资源，其所属权不因其所依附的（ ）不同而改变。",[558,560,562,564,566],{"key":20,"text":559,"correct":29},"埋藏量",{"key":24,"text":561,"correct":22},"土地所有权",{"key":27,"text":563,"correct":29},"分布地域",{"key":31,"text":565,"correct":22},"使用权",{"key":34,"text":567,"correct":29},"赋存条件","BD",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":384,"analysis":37},1124420,"某立井井筒表土层厚度较大，需要冻结施工，则该立井井筒包括井颈、壁座、井窝、（ ）等分部工程。",[573,575,577,579,581],{"key":20,"text":574,"correct":29},"钻井井筒",{"key":24,"text":576,"correct":22},"冻结",{"key":27,"text":578,"correct":22},"井身",{"key":31,"text":580,"correct":22},"混凝土帷幕",{"key":34,"text":582,"correct":22},"防治水",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":52,"analysis":37},1124421,"施工准备工作的具体内容总体上应包括技术准备、工程准备、（ ）。",[587,589,591,593,595],{"key":20,"text":588,"correct":22},"对外协作",{"key":24,"text":590,"correct":29},"编制单项工程施工组织设计",{"key":27,"text":592,"correct":22},"劳动力准备",{"key":31,"text":594,"correct":22},"物资准备",{"key":34,"text":596,"correct":29},"编制土建工程施工组织设计",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":611,"analysis":37},1124422,"技术准备中，会审施工图纸的要求包括（ ）。",[601,603,605,607,609],{"key":20,"text":602,"correct":22},"确定拟建工程在总平面图上的坐标位置及其正确性",{"key":24,"text":604,"correct":22},"检查工程地质与水文地质图纸是否满足施工要求",{"key":27,"text":606,"correct":29},"根据水文地质资料确定矿井的涌水量和治水方案",{"key":31,"text":608,"correct":22},"掌握有关建筑、结构和设备安装图纸的要求和各细部间的关系",{"key":34,"text":610,"correct":29},"检查矿井设计的标准是否符合设计的总体要求","ABD",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":241,"analysis":37},1124423,"井下建立测量平面控制网的方法可以有（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":29},"经纬仪一水准导线",{"key":24,"text":619,"correct":22},"经纬仪一钢尺导线",{"key":27,"text":621,"correct":22},"陀螺经纬仪一光电测距导线",{"key":31,"text":623,"correct":29},"GPS网",{"key":34,"text":625,"correct":22},"全站仪导线",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":97,"analysis":37},1124424,"下列关于三类工程综合平衡的论述，正确的是（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":22},"应围绕关键线路的关键工程组织快速施工",{"key":24,"text":633,"correct":22},"一般情况下，矿建工程项目构成矿井建设的关键线路",{"key":27,"text":635,"correct":29},"关键线路和关键工程在任何情况下都是固定的",{"key":31,"text":637,"correct":29},"矿建、土建和安装工作应齐头并进，同时进行",{"key":34,"text":639,"correct":22},"井筒到底后，巷道开拓和地面建筑及机电设备安装工程将成为关键",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":568,"analysis":37},1124425,"矿井施工项目中应布置在工业广场边缘的临时设施有（ ）",[644,646,648,650,652],{"key":20,"text":645,"correct":29},"临时炸药库",{"key":24,"text":647,"correct":22},"临时油脂库",{"key":27,"text":649,"correct":29},"临时锅炉房",{"key":31,"text":651,"correct":22},"矸石场",{"key":34,"text":653,"correct":29},"混凝土搅拌站",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":67,"analysis":37},1124426,"三类工程综合平衡的具体工作内容是（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"全面规划，合理安排",{"key":24,"text":661,"correct":29},"矿建工程为主，土建和机电安装工程为辅",{"key":27,"text":663,"correct":22},"采用先进的技术和工艺，制定周密的施工方案",{"key":31,"text":665,"correct":29},"矿建工程结束后，以土建工程作为重点",{"key":34,"text":667,"correct":22},"精心组织施工，搞好综合平衡",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":141,"analysis":37},1124427,"矿井施工现场准备内容有（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":22},"测量定位",{"key":24,"text":675,"correct":22},"四通一平",{"key":27,"text":677,"correct":22},"地质补充勘探",{"key":31,"text":679,"correct":29},"图纸会审",{"key":34,"text":594,"correct":29},{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":67,"analysis":37},1124428,"矿山井巷工程过期能工安排中,对于井下三期工程煤巷工程量大。施工速度要求高,对提升能力有较高要求的矿井提升改装方案有（ ）。",[685,687,689,691,693],{"key":20,"text":686,"correct":22},"风井临时改装箕斗提升",{"key":24,"text":688,"correct":29},"副井临时改装箕斗提升",{"key":27,"text":690,"correct":22},"主井临时改装罐笼和箕斗混合提升",{"key":31,"text":692,"correct":29},"雨井临时改装罐笼和斗混合提升",{"key":34,"text":694,"correct":22},"风井临时改装罐笼和箕斗混合提升",{"id":696,"libraryId":5,"type":15,"typeLabel":16,"stem":697,"options":698,"answer":611,"analysis":37},1124429,"不同工程建设阶段有不同的测量控制网，在矿业工程中，包括有（ ）。",[699,701,703,705,707],{"key":20,"text":700,"correct":22},"勘查设计阶段的测图控制网",{"key":24,"text":702,"correct":22},"施工阶段的施工控制网",{"key":27,"text":704,"correct":29},"施工阶段还设有的变形监测控制网",{"key":31,"text":706,"correct":22},"矿井生产运行阶段要建立新的控制网",{"key":34,"text":708,"correct":29},"安装施工用的测量控制网",{"id":710,"libraryId":5,"type":15,"typeLabel":16,"stem":711,"options":712,"answer":141,"analysis":37},1124430,"目前，矿业工程项目的施工组织设计可分为（ ）等。",[713,715,717,719,721],{"key":20,"text":714,"correct":22},"矿区施工组织总设计",{"key":24,"text":716,"correct":22},"单项工程施工组织设计",{"key":27,"text":718,"correct":22},"单位工程施工组织设计",{"key":31,"text":720,"correct":29},"井巷工程施工组织设计",{"key":34,"text":722,"correct":29},"土建工程施工组织设计",{"id":724,"libraryId":5,"type":15,"typeLabel":16,"stem":725,"options":726,"answer":97,"analysis":37},1124431,"矿业工程施工技术方案的具体确定，在选择时应考虑到（ ）。",[727,729,731,733,735],{"key":20,"text":728,"correct":22},"施工准备期应以安排井筒开工以及项目所需要的准备工作为主",{"key":24,"text":730,"correct":22},"建井主要矛盾线上关键工程的施工方法",{"key":27,"text":732,"correct":29},"建井初期应重视地面土建工程施工以提供良好的生活条件",{"key":31,"text":734,"correct":29},"投人生产前应保证所有项目全部完工",{"key":34,"text":736,"correct":22},"矿井机电设备安装工程的安排应以保证项目联合试运转之前完成为原则",[738,742,745,748,751,754],{"id":739,"name":740,"category":7,"favorite":741},1,"领导干部任职前廉政法规知识测试题",92,{"id":743,"name":744,"category":7,"favorite":739},595,"建筑结构与设备",{"id":746,"name":747,"category":7,"favorite":739},715,"招标采购专业知识与法律法规",{"id":749,"name":750,"category":7,"favorite":739},848,"市政方向-通用基础",{"id":752,"name":753,"category":7,"favorite":8},534,"BIM工程师",{"id":755,"name":753,"category":7,"favorite":8},535]