[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":731},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,31,50,1681,[13,38,53,67,82,97,112,126,140,155,169,184,199,214,228,243,254,269,284,299,313,328,343,357,370,379,394,409,423,437,452,465,479,493,507,520,535,549,561,576,590,604,618,632,646,660,674,688,703,717],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1124281,2,"多选题","下列关于注浆法说法中，正确的是（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","根据注浆工作与井巷掘进工序的先后时间次序进行分类，注浆法分为预注浆法和壁后注浆法",true,{"key":24,"text":25,"correct":22},"B","预注浆法是在凿井前或在井筒掘进到含水层之前所进行的注浆工作",{"key":27,"text":28,"correct":22},"C","后注浆法是在井巷掘砌之后所进行的注浆工作",{"key":30,"text":31,"correct":32},"D","预注浆往往是为了减少井筒涌水，杜绝井壁和井帮的渗水和加强永久支护采取的治水措施",false,{"key":34,"text":35,"correct":22},"E","注浆法既可用于为了减少井筒涌水，加快凿井速度、对井筒全深范围内的所有含水层进行预注浆“打干井”施工，又可对裂隙含水岩层和松散砂土层进行堵水、加固","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1124282,"通常立井井筒基岩段含水层的处理方法包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"地面预注浆",{"key":24,"text":45,"correct":22},"工作面预注浆",{"key":27,"text":47,"correct":32},"壁后注浆",{"key":30,"text":49,"correct":32},"利用泄水管泄水",{"key":34,"text":51,"correct":32},"布置吊泵排水","AB",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":36,"analysis":37},1124283,"下山掘进时，井筒涌水的处理方法有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"注浆堵水",{"key":24,"text":60,"correct":22},"导水与截水",{"key":27,"text":62,"correct":22},"钻孔泄水",{"key":30,"text":64,"correct":32},"潜水泵配吊桶排水",{"key":34,"text":66,"correct":22},"井筒排水",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1124284,"下列属于立井井筒施工辅助生产系统的是（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":32},"出矸系统",{"key":24,"text":74,"correct":22},"通风及排水系统",{"key":27,"text":76,"correct":22},"工作面照明与信号的设置、井筒测量以及布置安全梯",{"key":30,"text":78,"correct":22},"压风和供水系统",{"key":34,"text":80,"correct":22},"立井施工的地面排矸（废石）系统","BCDE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1124285,"立井井筒施工中井筒内应布置（ ），用于突发涌水情况下的排水工作。",[86,88,90,92,94],{"key":20,"text":87,"correct":32},"吊桶",{"key":24,"text":89,"correct":32},"潜水泵",{"key":27,"text":91,"correct":22},"吊泵",{"key":30,"text":93,"correct":22},"卧泵",{"key":34,"text":95,"correct":32},"压力泵","CD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1124286,"下列关于立井井筒掘进装岩设备的说法，错误的是（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":32},"长绳悬吊抓岩机，施工中工人的劳动强度较大，抓斗的灵活性较差",{"key":24,"text":104,"correct":32},"中心回转抓岩机安设在下层吊盘，安装使用都很方便",{"key":27,"text":106,"correct":22},"环行轨道抓岩机由于其轨道的特殊性，使用中比中心回转抓岩机方便",{"key":30,"text":108,"correct":32},"靠壁抓岩机通常固定在岩壁上，要求围岩条件较好，一般适用于冶金矿山井筒的掘进",{"key":34,"text":110,"correct":22},"目前使用最为普遍的是HZ形环行轨道抓岩机","CE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":81,"analysis":37},1124287,"岩石巷道与硐室的施工目前主要以采用钻眼爆破法为主，其主要施工程序包括（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":32},"设备安装",{"key":24,"text":119,"correct":22},"工作面钻眼爆破",{"key":27,"text":121,"correct":22},"通风、安全检查",{"key":30,"text":123,"correct":22},"临时支护",{"key":34,"text":125,"correct":22},"装渣出渣以及巷道永久支护",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":36,"analysis":37},1124288,"立井井筒施工的主要辅助工作有（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"通风工作",{"key":24,"text":133,"correct":22},"井筒涌水的处理",{"key":27,"text":135,"correct":22},"压风和供水工作",{"key":30,"text":137,"correct":32},"支护工作",{"key":34,"text":139,"correct":22},"其他辅助工作",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},1124289,"立井井筒永久支护是井筒施工中的一个重要工序，根据所用材料不同，立井井筒永久支护可采用（ ）。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"料石井壁",{"key":24,"text":147,"correct":22},"混凝土井壁",{"key":27,"text":149,"correct":22},"钢筋混凝土井壁",{"key":30,"text":151,"correct":22},"锚喷支护井壁",{"key":34,"text":153,"correct":32},"井圈背板井壁","ABCD",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":154,"analysis":37},1124290,"井巷工程中，钻眼爆破法施工的主要工序包括（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"工作面钻眼爆破工作",{"key":24,"text":162,"correct":22},"装岩与提升工作",{"key":27,"text":164,"correct":22},"井筒支护工作",{"key":30,"text":166,"correct":22},"通风、排水、测量等辅助工作",{"key":34,"text":168,"correct":32},"施工组织设计编制",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},1124291,"井巷爆破的主要爆破参数包括（ ）。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"炸药消耗量",{"key":24,"text":176,"correct":22},"炮眼的深度",{"key":27,"text":178,"correct":32},"炮眼位置",{"key":30,"text":180,"correct":32},"炮眼直径",{"key":34,"text":182,"correct":22},"炮眼数目","ABE",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1124292,"矿山爆破工程中爆破图表的内容包括（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"爆破原始条件",{"key":24,"text":191,"correct":22},"爆破参数表",{"key":27,"text":193,"correct":32},"爆破施工组织设计",{"key":30,"text":195,"correct":22},"炮眼布置图",{"key":34,"text":197,"correct":22},"预期爆破效果","ABDE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},1124293,"立井基岩蘸工中,不需要临时支护的作业方式有（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"短段掘砌单行作业",{"key":24,"text":206,"correct":32},"短段掘砌平行作业",{"key":27,"text":208,"correct":32},"长段掘砌单行作业",{"key":30,"text":210,"correct":32},"长段掘砌平行作业",{"key":34,"text":212,"correct":22},"掘砌混合作业","AE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":198,"analysis":37},1124294,"下列属于民用爆炸物品的爆破器材有（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"各类炸药、雷管",{"key":24,"text":221,"correct":22},"导爆索、导火索",{"key":27,"text":223,"correct":32},"黑火药、烟火剂",{"key":30,"text":225,"correct":22},"非电导爆系统、起爆药",{"key":34,"text":227,"correct":22},"爆破剂",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":242,"analysis":37},1124295,"在立井基岩掘进中，钻眼爆破工作是一项主要工序，其中的爆破工作主要包括（ ）。",[232,234,236,238,240],{"key":20,"text":233,"correct":32},"爆破安全评估",{"key":24,"text":235,"correct":22},"爆破器材的选择",{"key":27,"text":237,"correct":22},"确定爆破参数",{"key":30,"text":239,"correct":22},"编制爆破图表",{"key":34,"text":241,"correct":32},"炸药和雷管购买","BCD",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":81,"analysis":37},1124296,"立井井筒施工的辅助工作主要包括（ ）。",[247,248,249,250,252],{"key":20,"text":137,"correct":32},{"key":24,"text":131,"correct":22},{"key":27,"text":133,"correct":22},{"key":30,"text":251,"correct":22},"压风工作",{"key":34,"text":253,"correct":22},"供水工作",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":268,"analysis":37},1124297,"关于井筒预注浆工作，说法错误的是（ ）。",[258,260,262,264,266],{"key":20,"text":259,"correct":32},"含水层距地表较浅时，采用地面预注浆较为合适",{"key":24,"text":261,"correct":32},"地面预注浆的钻孔一般布置在大于井筒掘进直径1～3m的圆周上",{"key":27,"text":263,"correct":32},"当含水岩层埋藏较深时，采用井筒工作面预注浆是比较合适",{"key":30,"text":265,"correct":22},"工作面预注浆的注浆孔间距取决于浆液在含水岩层中的扩散半径，一般为1．5～3．0m",{"key":34,"text":267,"correct":22},"地面预注浆时，无论含水层厚薄，均可将含水岩层一次注完全深","DE",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":283,"analysis":37},1124298,"井筒在施工时可能会出现涌水，关于工作面排水的正确说法是（ ）。",[273,275,277,279,281],{"key":20,"text":274,"correct":22},"工作面积水的排出方法可分为吊桶排水和吊泵或卧泵排水",{"key":24,"text":276,"correct":32},"利用吊泵排水，井筒工作面涌水量以不超过50m3／h为宜",{"key":27,"text":278,"correct":32},"井筒工作面涌水量不超过10m3／h时，采用吊桶排水较为合适",{"key":30,"text":280,"correct":22},"吊桶排水能力，与吊桶容积和每小时提升次数有关",{"key":34,"text":282,"correct":22},"当井筒深度超过水泵扬程时，就需要设中间泵房进行多段排水","ADE",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":298,"analysis":37},1124299,"井筒工作面预注浆应该设置（ ），其目的是为了防止冒水跑浆。",[288,290,292,294,296],{"key":20,"text":289,"correct":32},"保护盘",{"key":24,"text":291,"correct":22},"混凝土止水垫",{"key":27,"text":293,"correct":32},"保护岩柱",{"key":30,"text":295,"correct":22},"保留岩帽",{"key":34,"text":297,"correct":32},"止浆盘","BD",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":198,"analysis":37},1124300,"立井井筒施工时可选择的排水方案有（ ）。",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"吊桶排水",{"key":24,"text":306,"correct":22},"吊泵排水",{"key":27,"text":308,"correct":32},"压气排水系统",{"key":30,"text":310,"correct":22},"风动潜水泵配合吊泵进行排水",{"key":34,"text":312,"correct":22},"卧泵排水",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":327,"analysis":37},1124301,"立井井筒掘进的装岩设备主要是抓岩机，常用的抓岩机械包括（ ）。",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"长绳悬吊抓岩机",{"key":24,"text":320,"correct":22},"中心回转抓岩机",{"key":27,"text":322,"correct":22},"环行轨道抓岩机",{"key":30,"text":324,"correct":32},"反铲式抓岩机",{"key":34,"text":326,"correct":32},"耙斗式抓岩机","ABC",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},1124302,"在立井施工中用伞形钻架打眼，其主要优点有（ ）。",[332,334,336,338,340],{"key":20,"text":333,"correct":22},"机械化程度高",{"key":24,"text":335,"correct":32},"适应条件好",{"key":27,"text":337,"correct":22},"劳动强度低",{"key":30,"text":339,"correct":22},"钻眼速度快",{"key":34,"text":341,"correct":22},"工作安全","ACDE",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":342,"analysis":37},1124303,"在立井施工中选择HZ-4中心回转抓岩机出渣的优点是（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"安装使用都很方便",{"key":24,"text":350,"correct":32},"运行费用低",{"key":27,"text":352,"correct":22},"机械化程度高、生产能力大",{"key":30,"text":354,"correct":22},"动力单一、操作灵便",{"key":34,"text":356,"correct":22},"结构合理、运转可靠",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":342,"analysis":37},1124304,"立井井筒施工时需要布置的凿井设施主要包括有（ ）。",[361,363,364,366,368],{"key":20,"text":362,"correct":22},"吊盘",{"key":24,"text":289,"correct":32},{"key":27,"text":365,"correct":22},"固定盘",{"key":30,"text":367,"correct":22},"封口盘",{"key":34,"text":369,"correct":22},"翻矸台",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":268,"analysis":37},1124305,"立井井筒施工时布置在井筒内的凿井设施主要包括有（ ）。",[374,375,376,377,378],{"key":20,"text":367,"correct":32},{"key":24,"text":369,"correct":32},{"key":27,"text":289,"correct":32},{"key":30,"text":362,"correct":22},{"key":34,"text":365,"correct":22},{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":393,"analysis":37},1124306,"关于立井短段掘、砌单行作业的说法，正确的有（ ）。",[383,385,387,389,391],{"key":20,"text":384,"correct":22},"不用临时支护",{"key":24,"text":386,"correct":32},"爆破后矸石需要全部清除",{"key":27,"text":388,"correct":22},"井壁混凝土接茬缝比较多",{"key":30,"text":390,"correct":22},"模板高度应与段高一致",{"key":34,"text":392,"correct":32},"围岩不能及时封闭","ACD",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":408,"analysis":37},1124307,"目前常用立井施工机械化配套作业线包括有（ ）。",[398,400,402,404,406],{"key":20,"text":399,"correct":32},"人工设备机械化作业线",{"key":24,"text":401,"correct":22},"综合设备机械化作业线",{"key":27,"text":403,"correct":22},"普通设备机械化作业线",{"key":30,"text":405,"correct":32},"高强设备机械化作业线",{"key":34,"text":407,"correct":32},"一般设备机械化作业线","BC",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":198,"analysis":37},1124308,"立井施工中井筒基岩段施工选择了综合机械化作业线，一般情况下组配机械化作业线的原则为（ ）。",[413,415,417,419,421],{"key":20,"text":414,"correct":22},"应根据工程的条件，施工队伍的素质和已具有的设备条件等因素，进行综合考虑，最后选定配套类型",{"key":24,"text":416,"correct":22},"各设备之间的能力要匹配，配套方式应与作业方式相适应",{"key":27,"text":418,"correct":32},"应考虑以经济效益第一为前提",{"key":30,"text":420,"correct":22},"配套方式应与设备技术性能相适应，选用寿命长、性能可靠的设备",{"key":34,"text":422,"correct":22},"配套方式应与施工队伍的素质相适应",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":327,"analysis":37},1124309,"井筒表土普通施工法包括（ ）。",[427,429,431,433,435],{"key":20,"text":428,"correct":22},"井圈背板普通施工法",{"key":24,"text":430,"correct":22},"吊挂井壁施工法",{"key":27,"text":432,"correct":22},"板桩施工法",{"key":30,"text":434,"correct":32},"表土降水施工法",{"key":34,"text":436,"correct":32},"冻结施工法",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":451,"analysis":37},1124310,"当深部矿井巷道围岩压力较大、变形严重时,宜采用的永久支护形式有（ ）。",[441,443,445,447,449],{"key":20,"text":442,"correct":22},"可缩性金属支架支护",{"key":24,"text":444,"correct":32},"砌前支护",{"key":27,"text":446,"correct":22},"锚喷支护",{"key":30,"text":448,"correct":32},"管棚支护",{"key":34,"text":450,"correct":22},"联合支护","ACE",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":154,"analysis":37},1124311,"井巷工程的临时支护通常可采用的方式是（ ）。",[456,457,459,461,463],{"key":20,"text":446,"correct":22},{"key":24,"text":458,"correct":22},"金属锚杆支护",{"key":27,"text":460,"correct":22},"金属棚子或木棚子支护",{"key":30,"text":462,"correct":22},"前探支架支护",{"key":34,"text":464,"correct":32},"现浇混凝土支护",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":36,"analysis":37},1124312,"巷道施工机械化作业线设备的配套，应保证各工序所使用的机械设备在生产能力上的匹配合理，下列配套方案合理的是（ ）。",[469,471,473,475,477],{"key":20,"text":470,"correct":22},"多台气腿式凿岩机、带调车盘耙斗装载机、矿车及电机车运输",{"key":24,"text":472,"correct":22},"多台气腿式凿岩机、蟹爪式装载机、梭式矿车及电机车运输",{"key":27,"text":474,"correct":22},"凿岩台车、铲斗侧卸式装载机、胶带转载机、矿车及电机车运输",{"key":30,"text":476,"correct":32},"钻装机、铲斗侧卸式装载机、胶带转载机、矿车及电机车运输",{"key":34,"text":478,"correct":22},"岩巷掘进机综合机械化作业线",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":36,"analysis":37},1124313,"井下施工应做好综合防尘工作，综合防尘措施包括（ ）。",[483,485,487,489,491],{"key":20,"text":484,"correct":22},"坚持采用湿式钻眼",{"key":24,"text":486,"correct":22},"坚持冲洗岩帮",{"key":27,"text":488,"correct":22},"坚持装岩时洒水降尘",{"key":30,"text":490,"correct":32},"放炮使用炮泥堵塞",{"key":34,"text":492,"correct":22},"加强个人防护",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":451,"analysis":37},1124314,"巷道采用局部扇风机进行通风，通风方式可分为（ ）。",[497,499,501,503,505],{"key":20,"text":498,"correct":22},"压入式",{"key":24,"text":500,"correct":32},"正压通风",{"key":27,"text":502,"correct":22},"抽出式",{"key":30,"text":504,"correct":32},"负压通风",{"key":34,"text":506,"correct":22},"混合式",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":154,"analysis":37},1124315,"倾斜巷道的下山施工法包括（ ）。",[511,513,514,516,518],{"key":20,"text":512,"correct":22},"钻眼爆破工作",{"key":24,"text":162,"correct":22},{"key":27,"text":515,"correct":22},"排水工作",{"key":30,"text":517,"correct":22},"安全工作",{"key":34,"text":519,"correct":32},"工程检查工作",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":534,"analysis":37},1124316,"在巷道支护施工中,有利于及时、充分发挥支护能力的措施有（ ）。",[524,526,528,530,532],{"key":20,"text":525,"correct":32},"支架设置棚间拉杆",{"key":24,"text":527,"correct":22},"保证锚杆预紧力",{"key":27,"text":529,"correct":22},"支架用背板背实",{"key":30,"text":531,"correct":32},"选用砂浆杆",{"key":34,"text":533,"correct":22},"拱碹壁后充填密实","BCE",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":81,"analysis":37},1124317,"与掘进循环的总时间相关的因素包括（ ）。",[539,541,543,545,547],{"key":20,"text":540,"correct":32},"排水时间",{"key":24,"text":542,"correct":22},"装岩工作时间",{"key":27,"text":544,"correct":22},"钻眼工作时间",{"key":30,"text":546,"correct":22},"装药、连线时间",{"key":34,"text":548,"correct":22},"放炮通风时间",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":560,"analysis":37},1124318,"对于近水平巷道的掘进可选择的通风方式有（ ）。",[553,554,555,557,558],{"key":20,"text":498,"correct":22},{"key":24,"text":502,"correct":22},{"key":27,"text":556,"correct":32},"全风压方式",{"key":30,"text":506,"correct":22},{"key":34,"text":559,"correct":32},"局部通风方式","ABD",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":575,"analysis":37},1124319,"下山巷道施工中由于采用自上向下法施工，为预防跑车事故，应在（ ）等处安装阻车器。",[565,567,569,571,573],{"key":20,"text":566,"correct":22},"工作面上方",{"key":24,"text":568,"correct":32},"工作面下方",{"key":27,"text":570,"correct":32},"倾斜巷道的中部",{"key":30,"text":572,"correct":22},"倾斜巷道上部车场与巷道连接处",{"key":34,"text":574,"correct":32},"倾斜巷道躲避硐内","AD",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":198,"analysis":37},1124320,"加快井巷工程关键路线施工速度的方法有（ ）。",[580,582,584,586,588],{"key":20,"text":581,"correct":22},"全面規划,统筹安排,综合平衡",{"key":24,"text":583,"correct":22},"采取平行交叉作业方法",{"key":27,"text":585,"correct":32},"合理制定井巷施工进度指标",{"key":30,"text":587,"correct":22},"优选重点队伍施工关键工作",{"key":34,"text":589,"correct":22},"采用新工艺、新技术、新装备,提高井巷工程单进水平",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":242,"analysis":37},1124321,"某施工单位承担一矿井井底车场主要巷道的掘进施工任务。所编制的施工进度计划见图2G320030-2，施工单位在工作H的施工中，由于不可预见地质因素造成工作面冒顶事故，处理事故耽误工期10d。由于发生冒顶事故，工作H发生工期拖延后，造成工作I的工期拖延10d，那么（ ）。",[594,596,598,600,602],{"key":20,"text":595,"correct":32},"该工程的总工期不会改变",{"key":24,"text":597,"correct":22},"该工程的总工期会拖延10d",{"key":27,"text":599,"correct":22},"工作C有了机动时间",{"key":30,"text":601,"correct":22},"网络计划的关键线路发生变化",{"key":34,"text":603,"correct":32},"网络计划需要重新规划和调整",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":183,"analysis":37},1124322,"矿业工程施工进度发生拖延后的控制措施，首先要分析引起拖延的原因，然后（ ）。",[608,610,612,614,616],{"key":20,"text":609,"correct":22},"对引起进度拖延的原因采取措施",{"key":24,"text":611,"correct":22},"投入更多的资源加速活动",{"key":27,"text":613,"correct":32},"采取措施保证后续工作的施工质量",{"key":30,"text":615,"correct":32},"分析进度计划，减少工作内容",{"key":34,"text":617,"correct":22},"改进施工方法和技术，提高劳动生产率",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":81,"analysis":37},1124323,"井巷工程的关键线路工期决定着矿井的建设工期，加快关键线路上各工作的施工方法和措施是（ ）。",[622,624,626,628,630],{"key":20,"text":623,"correct":32},"优化矿井设计",{"key":24,"text":625,"correct":22},"合理安排关键工作的开工顺序，采用新技术、新装备、新工艺，加快施工速度",{"key":27,"text":627,"correct":22},"把技术过硬，机械装备先进的重点队伍安排在关键线路上施工",{"key":30,"text":629,"correct":22},"利用措施工程来缩短主要矛盾线的长度",{"key":34,"text":631,"correct":22},"加强综合平衡，搞好工序衔接，缩短辅助时间",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":213,"analysis":37},1124324,"当关键工作的实际进度较计划进度落后时，调整的目标就是采取措施将耽误的时问补回来，保证项目按期完成。调整的方法主要是缩短后续关键工作的持续时间，包括（ ）。",[636,638,640,642,644],{"key":20,"text":637,"correct":22},"改变某些工作的逻辑关系",{"key":24,"text":639,"correct":32},"增加某些工作的工作内容",{"key":27,"text":641,"correct":32},"减少某些工作的计划费用",{"key":30,"text":643,"correct":32},"改变某些工作的资源消耗",{"key":34,"text":645,"correct":22},"重新编制进度计划",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":81,"analysis":37},1124325,"与横道图计划相比，网络计划的主要优点有（ ）。",[650,652,654,656,658],{"key":20,"text":651,"correct":32},"形象、直观，且易于编制和理解",{"key":24,"text":653,"correct":22},"可以找出关键线路和关键工作",{"key":27,"text":655,"correct":22},"可以明确各项工作的机动时间",{"key":30,"text":657,"correct":22},"可以利用计算机进行计算、优化和调整",{"key":34,"text":659,"correct":22},"能明确表达各项工作之间的逻辑关系",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":393,"analysis":37},1124326,"在矿山建设工程项目管理中，矿井建设的工期一般可采用下列（ ）方法来进行推算。",[664,666,668,670,672],{"key":20,"text":665,"correct":22},"根据矿井建设的关键线路来推算",{"key":24,"text":667,"correct":32},"根据安装工程的施工工期来推算",{"key":27,"text":669,"correct":22},"根据与矿建工程密切相连的土建和安装工程工期来推算",{"key":30,"text":671,"correct":22},"根据主要生产设备订货、到货和安装时间来推算",{"key":34,"text":673,"correct":32},"根据地面土建工程的施工时间来推算",{"id":675,"libraryId":5,"type":15,"typeLabel":16,"stem":676,"options":677,"answer":342,"analysis":37},1124327,"矿业工程施工阶段质量控制的重点有（ ）。",[678,680,682,684,686],{"key":20,"text":679,"correct":22},"施工工艺",{"key":24,"text":681,"correct":32},"施工段",{"key":27,"text":683,"correct":22},"施工工序",{"key":30,"text":685,"correct":22},"施工用料",{"key":34,"text":687,"correct":22},"施工机械",{"id":689,"libraryId":5,"type":15,"typeLabel":16,"stem":690,"options":691,"answer":702,"analysis":37},1124328,"按照质量事故所造成的危害程度，一般可将质量事故分为（ ）。",[692,694,696,698,700],{"key":20,"text":693,"correct":22},"一般事故",{"key":24,"text":695,"correct":32},"轻微事故",{"key":27,"text":697,"correct":22},"重大事故",{"key":30,"text":699,"correct":32},"严重事故",{"key":34,"text":701,"correct":32},"特大事故","AC",{"id":704,"libraryId":5,"type":15,"typeLabel":16,"stem":705,"options":706,"answer":534,"analysis":37},1124329,"矿业工程施工质量管理的内容包括（ ）等",[707,709,711,713,715],{"key":20,"text":708,"correct":32},"职工安全教育",{"key":24,"text":710,"correct":22},"工序质量控制",{"key":27,"text":712,"correct":22},"设置质量控制点",{"key":30,"text":714,"correct":32},"隐蔽工程验收",{"key":34,"text":716,"correct":22},"成品保护",{"id":718,"libraryId":5,"type":15,"typeLabel":16,"stem":719,"options":720,"answer":154,"analysis":37},1124330,"工程项目质量计划编制的依据有（ ）。",[721,723,725,727,729],{"key":20,"text":722,"correct":22},"施工图纸、设计文件",{"key":24,"text":724,"correct":22},"国家法律法规、国家技术标准规范",{"key":27,"text":726,"correct":22},"施工企业项目管理规划大纲",{"key":30,"text":728,"correct":22},"工程的实际情况和特点",{"key":34,"text":730,"correct":32},"监理方的要求",[732,736,739,742,745,748],{"id":733,"name":734,"category":7,"favorite":735},1,"领导干部任职前廉政法规知识测试题",92,{"id":737,"name":738,"category":7,"favorite":733},595,"建筑结构与设备",{"id":740,"name":741,"category":7,"favorite":733},715,"招标采购专业知识与法律法规",{"id":743,"name":744,"category":7,"favorite":733},848,"市政方向-通用基础",{"id":746,"name":747,"category":7,"favorite":8},534,"BIM工程师",{"id":749,"name":747,"category":7,"favorite":8},535]