[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":735},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,27,50,1681,[13,38,53,68,83,98,113,128,142,156,171,186,200,215,230,245,259,273,287,301,315,329,343,358,372,387,402,416,430,444,458,472,486,500,514,528,542,556,570,584,598,612,626,637,651,665,679,693,707,721],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1124074,2,"多选题","申请从事民用爆炸物品销售的企业，应当向所在地省、自治区、直辖市人民政府 国防科技工业主管部门提交（）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","申请书",true,{"key":24,"text":25,"correct":22},"B","可行性研究报告",{"key":27,"text":28,"correct":22},"C","能够证明其符合规定条件的有关材料",{"key":30,"text":31,"correct":32},"D","资金证明",false,{"key":34,"text":35,"correct":32},"E","财产证明","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1124075,"进行爆破作业时，必须遵守爆破安全规程。下列做法不正确的有（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"爆破作业人员应当经设区的县级人民政府公安机关考核合格，取得《爆破作 业人员许可证》后，方可从事爆破作业",{"key":24,"text":45,"correct":32},"爆破作业单位跨省、自治区、直辖市行政区域从事爆破作业的，应当事先将爆 破作业项目的有关情况向爆破作业所在地县级人民政府公安机关报告",{"key":27,"text":47,"correct":22},"领取的民用爆炸物品的数量需大于当班用量，作业后剩余的民用爆炸物品必须 当班清退回库",{"key":30,"text":49,"correct":32},"实施爆破作业，应当遵守国家有关标准和规范，在安全距离以外设置警示标志 并安排警戒人员，防止无关人员进入",{"key":34,"text":51,"correct":22},"爆破后，发出解除警报信号","ACE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1124076,"下列属于民用爆炸物品的爆破器材有（）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"各类炸药、雷管",{"key":24,"text":60,"correct":22},"导爆索、导火索",{"key":27,"text":62,"correct":32},"黑火药、烟火剂",{"key":30,"text":64,"correct":22},"非电导爆系统、起爆药",{"key":34,"text":66,"correct":22},"爆破剂","ABDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1124079,"下列存储爆破器材的仓库有关规定中，叙述正确的有（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"建立出入库检查、登记制度",{"key":24,"text":75,"correct":22},"对性质相抵触的民用爆炸物品必须分库储存",{"key":27,"text":77,"correct":32},"其他容易引起燃烧、爆炸的物品带入仓库区内时，应与所存储爆破器材保持安 全距离",{"key":30,"text":79,"correct":32},"可以把爆破器材发给有条件保管的个人或承包户",{"key":34,"text":81,"correct":22},"民用爆炸物品丢失、被盗，应当立即报告当地公安机关","ABE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1124080,"关于民用爆炸物品，其销售应当（）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"遵守《民用爆炸物品安全管理条例》的规定",{"key":24,"text":90,"correct":32},"具备专用的运输工具和管理人员",{"key":27,"text":92,"correct":32},"向当地县级人民政府提交申请",{"key":30,"text":94,"correct":22},"凭《民用爆炸物品销售许可证》进行",{"key":34,"text":96,"correct":32},"凭《民用爆炸物品生产许可证》进行","AD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1124081,"民用爆炸物品的储存，应该（）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"储存在专用仓库内",{"key":24,"text":105,"correct":32},"将炸药和雷管放在同一仓库内",{"key":27,"text":107,"correct":22},"安排专人管理",{"key":30,"text":109,"correct":22},"及时销毁过期失效爆炸物品",{"key":34,"text":111,"correct":32},"与汽油一起存放","ACD",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1124082,"关于经由道路运输民用爆炸物品的规定，以下说法正确的是（）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"输车辆安全技术状况应当符合国家有关安全技术标准的要求，并按照规定悬挂或者安装符合国家标准的易燃易爆危险物品警示标志",{"key":24,"text":120,"correct":22},"运输民用爆炸物品的车辆应当保持安全车速",{"key":27,"text":122,"correct":22},"按照规定的路线行驶，途中经停应当有专人看守，并远离建筑设施和人口稠密的地方，不得在许可以外的地点经停",{"key":30,"text":124,"correct":22},"按照安全操作规程装卸民用爆炸物品，并在装卸现场设置警戒，禁止无关人员进入",{"key":34,"text":126,"correct":32},"出现危险情况立即采取必要的应急处置措施，并报告当地政府环保主管部门","ABCD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":112,"analysis":37},1124083,"在进行爆破施工时，施工单位必须（）。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"有安全管理制度",{"key":24,"text":135,"correct":32},"自行做好安全警戒",{"key":27,"text":137,"correct":22},"如实记载领取的爆炸物品种类、数量及编号",{"key":30,"text":139,"correct":22},"按规定排除未引爆的爆炸物品",{"key":34,"text":141,"correct":32},"销毁多余的爆炸物品",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":127,"analysis":37},1124084,"关于爆炸器材使用的管理规定，以下说法正确的是（）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"严禁转让、出借、转借、抵押、赠送、私藏或者非法持有民用爆炸物品",{"key":24,"text":149,"correct":22},"爆破作业单位的主要负责人是本单位民用爆炸物品安全管理责任人，对本单位的民用爆炸物品安全管理工作全面负责。爆破作业单位应当建立安全管理制度、岗位安全责任制度，制订安全防范措施和事故应急预案，设置安全管理机构或者配备专职安全管理人员",{"key":27,"text":151,"correct":22},"无民事行为能力人、限制民事行为能力人或者曾因犯罪受过刑事处罚的人，不得从事爆破作业",{"key":30,"text":153,"correct":22},"爆破作业单位应当建立民用爆炸物品登记制度，如实将本单位生产、销售、购买、运输、储存、使用民用爆炸物品的品种、数量和流向信息输入计算机系统",{"key":34,"text":155,"correct":32},"爆破作业单位应当如实记载领取、发放民用爆炸物品的品种、数量、编号以及领取、发放人员姓名。领取民用爆炸物品的数量不得超过当班用量，作业后剩余的民用爆炸物品必须当班清退回库。爆破作业单位应当将领取、发放民用爆炸物品的原始记录保存1年备査",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1124085,"国家规定，非经国务院授权的有关主管部门同意，不得在下列地区开采矿产资源( )",[160,162,164,166,168],{"key":20,"text":161,"correct":32},"农村产粮区一定范围内",{"key":24,"text":163,"correct":22},"重要工业区、大型水利工程设施、城镇市政工程设施附近一定距离内",{"key":27,"text":165,"correct":22},"铁路、重要公路两侧一定距离以内",{"key":30,"text":167,"correct":22},"重要河流、堤坝两侧一定距离以内",{"key":34,"text":169,"correct":22},"国家划定的自然保护区、重要风景区","BCDE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1124086,"经国务院授权的有关主管部门同意，可以开采矿产资源的地区是（）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"大型水利工程设施附近一定距离内",{"key":24,"text":178,"correct":22},"铁路、重要公路两侧一定距离内",{"key":27,"text":180,"correct":32},"农村灌慨渠道两侧一定距离内",{"key":30,"text":182,"correct":22},"国家划定的自然保护区内",{"key":34,"text":184,"correct":32},"用于放牧的草原地区","ABD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":112,"analysis":37},1124088,"关于矿产资源开采的政策，下列说法正确的是（）。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"对有价值的伴生矿产应当统一规划，综合开采和利用",{"key":24,"text":193,"correct":32},"鼓励个人开采国家实施保护的特种矿产资源",{"key":27,"text":195,"correct":22},"必须遵守国家劳动安全卫生规定，保障安全生产",{"key":30,"text":197,"correct":22},"必须遵守环境保护的法律规定，防止污染环境",{"key":34,"text":199,"correct":32},"资源开采率应达到90%以上",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},1124089,"对于未取得采矿许可证，擅自开采国家规定实行保护性开采的特定矿种，应当（）。",[204,206,208,210,212],{"key":20,"text":205,"correct":32},"吊销采矿许可证",{"key":24,"text":207,"correct":22},"责令停止开采、赔偿损失",{"key":27,"text":209,"correct":22},"没收采出的矿产品和违法所得",{"key":30,"text":211,"correct":22},"根据情节轻重，可以并处罚款",{"key":34,"text":213,"correct":32},"追究当地主管部门的责任","BCD",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},1124090,"关于矿产资源管理，以下说法正确的是（）。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"国务院地质矿产主管部门主管全国矿产资源勘査、开采的监督管理工作。国务院有关主管部门协助国务院地质矿产主管部门进行矿产资源勘查、开采和监督管理工作",{"key":24,"text":222,"correct":32},"国家对国家规划矿区、对国民经济具有重要价值的矿区和国家规定实行保护性开采的特定矿种，实行有计划的开采；未经省、自治区、直辖市人民政府地质矿产主管部门批准，任何单位和个人不得开采",{"key":27,"text":224,"correct":22},"在开采主要矿产的同时，对具有工业价值的共生和伴生矿产应当统一规划，综合开采，综合利用，防止浪费；对暂时不能综合开采或者必须同时采出而暂时还不能综合利用的矿产以及含有有用组分的尾矿，应当采取有效的保护措施，防止损失破坏",{"key":30,"text":226,"correct":22},"开采矿产资源，必须遵守有关环境保护的法律规定，防止污染环境。开采矿产资源，应当节约用地。耕地、草原、林地因采矿受到破坏的，矿山企业应当因地制宜地采取复垦利用、植树种草或者其他利用措施",{"key":34,"text":228,"correct":22},"开采矿产资源给他人生产、生活造成损失的，应当负责赔偿，并采取必要的补救措施","ACDE",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},1124091,"矿山建设工程的设计文件，必须符合（ ），并按照国家规定经管理矿山企业的 主管部门批准；不符合矿山安全规程和行业技术规范的，不得批准。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"矿山安全规程",{"key":24,"text":237,"correct":22},"行业技术规范",{"key":27,"text":239,"correct":32},"建设单位要求",{"key":30,"text":241,"correct":32},"施工单位要求",{"key":34,"text":243,"correct":32},"监理单位要求","AB",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":112,"analysis":37},1124092,"下列有关矿山建设的安全保障规定叙述不正确的有（）。",[249,251,253,255,257],{"key":20,"text":250,"correct":22},"安全工程的“三同时”指矿山建设工程安全设施的设计审查必须有设计部门、 主管部门、劳动行政主管部门同时参加",{"key":24,"text":252,"correct":32},"矿山安全规程和行业技术规范，由国务院管理矿山企业的主管部门制定",{"key":27,"text":254,"correct":22},"矿井必须有1个以上能行人的安全出口",{"key":30,"text":256,"correct":22},"矿山建设工程安全设施竣工后，由管理矿山企业的主管部门验收，并须有建设 行政主管部门参加",{"key":34,"text":258,"correct":32},"矿山必须有与外界相通的、符合安全要求的运输和通信设施",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":36,"analysis":37},1124093,"有关矿山建设事故处理的规定叙述不准确的有（）。",[263,265,267,269,271],{"key":20,"text":264,"correct":22},"发生矿山事故，矿山企业必须立即组织抢救，防止事故扩大，减少人员伤亡 和财产损失，对伤亡事故必须立即如实报告建设行政主管部门和管理矿山企业的主管部门",{"key":24,"text":266,"correct":22},"管理矿山企业主管部门应对矿山事故中伤亡的职工按照国家规定给予抚恤或者 补偿",{"key":27,"text":268,"correct":22},"矿山事故发生后，应当尽快消除现场危险，査明事故原因后方可恢复生产",{"key":30,"text":270,"correct":32},"发生一般矿山事故，由矿山企业负责调查和处理",{"key":34,"text":272,"correct":32},"发生重大矿山事故，由政府及其有关部门、工会和矿山企业按照行政法规的规 定进行调査和处理",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":170,"analysis":37},1124094,"违反《中华人民共和国矿山安全法》规定，有下列行为之一的，由劳动行政主管部门责令改正，可以并处罚款；情节严重的，提请县级以上人民政府决定责令停产整顿；对主管人员和直接责任人员由其所在单位或者上级主管机关给予行政处分，以下说法正确的是（）。",[277,279,281,283,285],{"key":20,"text":278,"correct":32},"对职工进行安全教育、培训，其效果不到位，引发安全事故的",{"key":24,"text":280,"correct":22},"使用不符合国家安全标准或者行业安全标准的设备、器材、防护用品、安全检测仪器的",{"key":27,"text":282,"correct":22},"未按照规定提取或者使用安全技术措施专项费用的",{"key":30,"text":284,"correct":22},"拒绝矿山安全监督人员现场检查或者在被检查时隐瞒事故隐患、不如实反映情况的",{"key":34,"text":286,"correct":22},"未按照规定及时、如实报告矿山事故的",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":127,"analysis":37},1124095,"按照《中华人民共和国矿山安全法》规定，矿山企业出现（ ）情况者，应责令 其停止施工(或停产）。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"矿山建设工程安全设施的设计未经批准擅自施工",{"key":24,"text":294,"correct":22},"矿长不具备安全专业知识，又无法在限期内调整和配备",{"key":27,"text":296,"correct":22},"矿山建设工程的安全设施未经验收或者验收不合格擅自投人生产的",{"key":30,"text":298,"correct":22},"安全生产的特种作业人员未取得操作资格证书上岗作业，逾期不改的",{"key":34,"text":300,"correct":32},"矿山企业主管人员违章指挥、强令工人冒险作业，因而发生重大伤亡事故的",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":36,"analysis":37},1124096,"对于地基土为（ ）可液化土等特殊±时，设计时要综合考虑土体的特殊性质， 选用适当的增强体和施工工艺。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"欠固结土",{"key":24,"text":308,"correct":22},"膨胀土",{"key":27,"text":310,"correct":22},"湿陷性黄土",{"key":30,"text":312,"correct":32},"固结土",{"key":34,"text":314,"correct":32},"岩石",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":244,"analysis":37},1124097,"复合地基承载力特征值应通过（）。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"现场复合地基载荷承载试验确定",{"key":24,"text":322,"correct":22},"采用增强体的载荷试验结果和周边土的承载力特征值结合经验确定",{"key":27,"text":324,"correct":32},"采用增强体的载荷试验结果确定",{"key":30,"text":326,"correct":32},"采用复合地基载荷承载验算确定",{"key":34,"text":328,"correct":32},"凭经验确定",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":127,"analysis":37},1124098,"应在施工期间及使用期间进行变形观测的建筑物有（）。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"地基基础设计等级为甲级的建筑物",{"key":24,"text":336,"correct":22},"复合地基或软弱地基上的设计等级为乙级的建筑物",{"key":27,"text":338,"correct":22},"加层、扩建建筑物",{"key":30,"text":340,"correct":22},"受邻近深基坑开挖施工影响或受场地地下水等环境因素变化影响的建筑物",{"key":34,"text":342,"correct":32},"学校",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":357,"analysis":37},1124099,"压实填土包括（）填土。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"分层压实",{"key":24,"text":350,"correct":32},"整层压实",{"key":27,"text":352,"correct":22},"分层夯实",{"key":30,"text":354,"correct":32},";整层夯实",{"key":34,"text":356,"correct":32},"自然压实","AC",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":36,"analysis":37},1124100,"当场地内有地下水时，应根据（ ）和支护结构与基础形式等因素，确定地下水 控制方法。当场地周围有地表水汇流、排泄或地下水管渗漏时，应对基坑采取保护措施。",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"场地及周边区域的工程地质条件",{"key":24,"text":365,"correct":22},"水文地质条件",{"key":27,"text":367,"correct":22},"周边环境情况",{"key":30,"text":369,"correct":32},"天气情况",{"key":34,"text":371,"correct":32},"施工单位技术水平",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":386,"analysis":37},1124101,"当基坑底为隔水层且层底作用有承压水时，应进行坑底突涌验算，必要时可取 ()保证坑底土层稳定。",[376,378,380,382,384],{"key":20,"text":377,"correct":32},"强排措施",{"key":24,"text":379,"correct":22},"水平封底隔渗措施",{"key":27,"text":381,"correct":22},"钻孔减压措施",{"key":30,"text":383,"correct":32},"注浆加固",{"key":34,"text":385,"correct":32},"压重措施","BC",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":401,"analysis":37},1124102,"关于检査孔的施工要求，以下说法正确的是（）。",[391,393,395,397,399],{"key":20,"text":392,"correct":22},"检查孔钻进过程中，每钻进30~50 m应进行一次测斜，钻孔偏斜率应控制在1.0%以内",{"key":24,"text":394,"correct":22},"检査孔在岩层钻进中，每一层应采取一个样品进行物理力学试验。当层厚超过5m时，应适当增加采样数量；可采煤层的顶、底板应单独采样",{"key":27,"text":396,"correct":22},"洗井应采用机械方法对抽水层段反复抽洗，并应将岩粉和泥浆全部清除，直至孔内流出清水为止",{"key":30,"text":398,"correct":32},"所穿过各主要含水层（组），应分层进行抽水试验。试验中水位降低不宜少于3次，每次降深应相等，其稳定时间不少于4h；困难条件下，水位降低不应小于2m；每层抽水的最后一次降水，应采取水样，测定水温和气温，并应进行水质化验分析",{"key":34,"text":400,"correct":22},"检查孔钻完后，除施工尚应利用的孔外，其他检查孔在清除孔壁和孔底的岩粉后，应用水泥砂浆封堵严实，其抗压强度不应低于10MP a，并应设立永久性标志","ABCE",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":244,"analysis":37},1124103,"《有色金属矿山井巷工程设计规范》YSJ 021—1993规定，竖井、斜井施工图设计 必须有工程地质检查钻孔资料，对于已有勘探资料表明，地质条件简单和不通过含水冲积层的井筒，符合下列条件之一者，可不打工程地质钻孔（）。",[406,408,410,412,414],{"key":20,"text":407,"correct":22},"在竖井井筒周围25m范围内有勘探钻孔，并符合检查孔要求的工程地质和水 文地质资料",{"key":24,"text":409,"correct":22},"矿区内已有生产矿井，掌握新设计井筒通过的岩层物理性质、水文地质及其变 化规律，并经主管部门确认",{"key":27,"text":411,"correct":32},"历史上该地区是缺水地区",{"key":30,"text":413,"correct":32},"相临矿区开采表明了工程地质和水文地质资料",{"key":34,"text":415,"correct":32},"该地区年降水量小于0mm时",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":229,"analysis":37},1124104,"关于《煤炭工业矿井设计规范》对排水设施(设计)的重要规定，以下说法正确的是（）。",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"矿井正常涌水量在1000m3\u002Fh及其以下，井底水仓的有效容量应能容纳8h矿井正常涌水量。采区水仓的有效容量应能容纳4h采区正常涌水量",{"key":24,"text":423,"correct":32},"主排水泵的工作水泵的总能力，必须在20h内排出矿井24h的正常涌水量（包括充填水及其他用水）。备用水泵的能力应不少于工作水泵台数的60%",{"key":27,"text":425,"correct":22},"工作水泵和备用水泵的总能力应能在20h内排出矿井24h的最大涌水量",{"key":30,"text":427,"correct":22},"主排水管应设工作和备用水管，其中工作水管的能力，应当能配合工作水泵在20h内排出矿井24h的正常涌水量",{"key":34,"text":429,"correct":22},"全部管路的总能力，应当能配合工作水泵和备用泵在20h内排出矿井24h的最大涌水量",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":386,"analysis":37},1124105,"根据《煤炭工业矿井设计规范》规定，选择主排水管应符合下列规定（）。",[434,436,438,440,442],{"key":20,"text":435,"correct":32},"主排水管应设工作和备用水管，其中工作水管的能力，应在24h内排出矿井 48h的正常涌水量",{"key":24,"text":437,"correct":22},"主排水管应设工作和备用水管，其中工作水管的能力，应在20h内排出矿井 24h的正常涌水量",{"key":27,"text":439,"correct":22},"全部管路的总能力，应在20h内排出矿井24h的最大涌水量",{"key":30,"text":441,"correct":32},"全部管路的总能力，应在24h内排出矿井48h的最大涌水量",{"key":34,"text":443,"correct":32},"全部管路的总能力，应大于最大涌水量",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":127,"analysis":37},1124106,"《煤矿井巷工程施工规范》GB 50511—2010关于“先探(水)后掘(进)”的重要规 定，当掘进工作面遇有下列情况之一时必须先探水后掘进（）。",[448,450,452,454,456],{"key":20,"text":449,"correct":22},"接近溶洞、水量大的含水层",{"key":24,"text":451,"correct":22},"接近可能与河流、湖泊、水库、蓄水池、含水层等相通的断层",{"key":27,"text":453,"correct":22},"接近被淹井巷、老空或老窑",{"key":30,"text":455,"correct":22},"接近隔离矿柱",{"key":34,"text":457,"correct":32},"长时间停头恢复掘进时",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":36,"analysis":37},1124107,"根据《有色金属矿采矿设计规范》GB 50771—2012关于施工防渗帷幕的规定， 采用防渗帷幕时，必须具备下列水文地质基础条件（）",[462,464,466,468,470],{"key":20,"text":463,"correct":22},"区域地下水进入矿坑的通道在平面和剖面上都比较窄",{"key":24,"text":465,"correct":22},"进水通道两侧和底部应有稳定、可靠和连续分布的隔水层或相对隔水层",{"key":27,"text":467,"correct":22},"含水层必须具备良好的灌注条件，其灌注深度不宜大于400m",{"key":30,"text":469,"correct":32},"含水层必须具备良好的灌注条件，其灌注深度不宜大于200m",{"key":34,"text":471,"correct":32},"防渗帷幕只能用在防止地表水渗透的地质条件下",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":127,"analysis":37},1124108,"关于探放水的安全规定，以下说法正确的是（）。",[476,478,480,482,484],{"key":20,"text":477,"correct":22},"探放水钻孔的直径、位置、方向、数量、每次钻进的深度、超前距离等，应在探放水施工设计中明确",{"key":24,"text":479,"correct":22},"钻进中应测定钻孔的长度、方向和倾角，并应标注在巷道的平、剖面图上",{"key":27,"text":481,"correct":22},"探水钻进前，应安装孔口管、三通、阀门、水压表等。钻孔内的水压过大时，应采用反压和防喷装置钻进，并应采取防止孔口管和煤岩壁突然鼓出的措施",{"key":30,"text":483,"correct":22},"钻进中应根据预想地质柱状图、钻孔位置、水质、气体化验结果进行综合分析，应预计透水距离和时间，并应提前做好防护工作",{"key":34,"text":485,"correct":32},"以上都不对",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":112,"analysis":37},1124109,"瓦斯含量大和有煤与瓦斯突出危险的煤层采用水力采煤时，应采取的措施是( )。",[490,492,494,496,498],{"key":20,"text":491,"correct":22},"增加边界回风眼和回风石门",{"key":24,"text":493,"correct":32},"在厚煤层中增设回风巷",{"key":27,"text":495,"correct":22},"采取倒面开采",{"key":30,"text":497,"correct":22},"工作面采用液控水枪离机操作时，应采用压入新风、抽出瓦斯的通风方式",{"key":34,"text":499,"correct":32},"开采解放层",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":82,"analysis":37},1124110,"开采有煤与瓦斯突出的煤层应符合下列规定（）。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"在突出矿井中开采煤层群时，应首先开采解放层",{"key":24,"text":507,"correct":22},"开采解放层的矿井，被解放层的巷道必须布置在解放范围内",{"key":27,"text":509,"correct":32},"开采解放层的矿井，被解放层的巷道不得布置在解放范围内",{"key":30,"text":511,"correct":32},"在突出矿井中开采煤层群时，不应首先开采解放层",{"key":34,"text":513,"correct":22},"石门揭穿煤(岩)与瓦斯突出煤层及突出煤层的掘进工作面，应设置连续监测的 突出危险预测的预报装置，并应接人矿井安全监测系统。",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":401,"analysis":37},1124111,"关于井巷施工遇到突出煤层时，采掘作业的规定，以下说法正确的是（）。",[518,520,522,524,526],{"key":20,"text":519,"correct":22},"严禁采用水力采煤法、倒台阶采煤法及其他非正规采煤法",{"key":24,"text":521,"correct":22},"急倾斜煤层适合采用伪倾斜正台阶、掩护支架采煤法",{"key":27,"text":523,"correct":22},"急倾斜煤层掘进上山时，采用双上山或伪倾斜上山等掘进方式，并加强支护",{"key":30,"text":525,"correct":32},"掘进工作面与煤层巷道交叉贯通前，被贯通的煤层巷道必须超过贯通位置，其超前距不得小于3 m，并且贯通点周围5 m内的巷道应加强支护。在掘进工作面与被贯通巷道距离小于40m的作业期间，被贯通巷道内不得安排作业，并保持正常通风，且在放炮时不得有人",{"key":34,"text":527,"correct":22},"采煤工作面尽可能采用刨煤机或浅截深采煤机采煤",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":127,"analysis":37},1124112,"立井施工前钻进检查孔，通过井筒施工检查钻孔可以获得有关的地质和水文地质 资料，作为井筒施工的依据。有关检查钻孔的相关规定（）。",[532,534,536,538,540],{"key":20,"text":533,"correct":22},"井筒开工前，应完成检査钻孔，并具有完整的检査钻孔资料",{"key":24,"text":535,"correct":22},"地质构造、水文条件中等，且无有害气体突出危险，检查钻孔可以布置在井筒 范围内",{"key":27,"text":537,"correct":22},"水文地质条件复杂，有煤层、岩层和有害气体突出的危险时，检查钻孔与井筒 中心之间的距离不得超过25m",{"key":30,"text":539,"correct":22},"井筒离特大含水层较近，以及采用冻结法施工的井筒，检查钻孔不得布置在井 筒范围内",{"key":34,"text":541,"correct":32},"钻孔的终深可小于井筒设计深度",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":170,"analysis":37},1124113,"有关立井井筒采用冻结法施工的规定有（）。",[546,548,550,552,554],{"key":20,"text":547,"correct":32},"井壁必须有能承受最大注浆压力的强度",{"key":24,"text":549,"correct":22},"冻结法凿井时，地质检査钻孔不得打在冻结井筒内",{"key":27,"text":551,"correct":22},"水文观察钻孔偏斜不得超出井筒，深度不得超过冻结段下部隔水层",{"key":30,"text":553,"correct":22},"基岩段涌水较大时，应加深冻结深度",{"key":34,"text":555,"correct":22},"冻结深度应穿过风化带进人稳定的基岩10m以上",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":229,"analysis":37},1124114,"立井井筒施工的有关规定包括（）。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"采用抓岩机出渣时，必须在作业前，要详细检查抓岩机各部件和悬吊的钢 丝绳",{"key":24,"text":563,"correct":32},"采用滑模施工或伞钻打眼时，其间距不得大于4m，但必须制订防止片帮措施， 报工程处处长批准",{"key":27,"text":565,"correct":22},"采用普通法凿井时，立井的永久支护或临时支护到工作面的距离不得大于2m",{"key":30,"text":567,"correct":22},"采用井壁注浆堵水时，必须遵守井筒在流砂层部位时，注浆孔深度应至少小于 井壁厚度200mm",{"key":34,"text":569,"correct":22},"井筒工作面预注浆前，在注浆含水岩层上方设置注浆岩帽或混凝土止 浆垫",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":67,"analysis":37},1124115,"立井井筒施工中，有关井下爆破作业的基本规定是（）。",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"专职爆破员应依照爆破作业说明书进行作业",{"key":24,"text":577,"correct":22},"井下爆破工作应由专职爆破员担任",{"key":27,"text":579,"correct":32},"井下炸药库50m以内的区域不应进行爆破作业",{"key":30,"text":581,"correct":22},"爆破作业应执行“一炮三检制”",{"key":34,"text":583,"correct":22},"专职爆破员应专门培训，考试合格，持证上岗",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":214,"analysis":37},1124116,"某煤矿井下石门穿过断层破碎带时，应进行探水，进行探水钻进施工应（）。",[588,590,592,594,596],{"key":20,"text":589,"correct":32},"首先施工好防水墙",{"key":24,"text":591,"correct":22},"先安装好孔口管、三通、阀门、水压表等",{"key":27,"text":593,"correct":22},"准备相关的防喷、防孔口管和岩壁突然鼓出的措施",{"key":30,"text":595,"correct":22},"设置好避灾路线",{"key":34,"text":597,"correct":32},"做好加强通风工作",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":185,"analysis":37},1124117,"当石门遇到有煤与沼气突出危险的煤层时，其施工应注意（）。",[602,604,606,608,610],{"key":20,"text":603,"correct":22},"对有煤与沼气突出危险的煤层，必须卸压后，才能进行掘进",{"key":24,"text":605,"correct":22},"沼气压力必须降至1MPa以下，才能进行掘进",{"key":27,"text":607,"correct":32},"工作面应采用风镐掘进",{"key":30,"text":609,"correct":22},"施工过程中，通风机必须连续运转",{"key":34,"text":611,"correct":32},"爆破作业时，雷管的总延期时间必须少于160ms",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":170,"analysis":37},1124118,"关于井筒揭露有煤与瓦斯突出的煤层的规定，以下说法正确的是（）。",[616,618,620,622,624],{"key":20,"text":617,"correct":32},"当采用爆破作业时，应采用正向装药，应采用安全等级不低于三级的煤矿许用含水炸药和煤矿许用瞬发雷管，使用煤矿许用毫秒延期雷管时，其最后一段的延期的时间不得超过150ms",{"key":24,"text":619,"correct":22},"爆破时，人员应撤离至井外安全地带。井口附近不得有明火及带电电源，其安全距离应根据具体情况确定。爆破后应检査井口附近瓦斯含量",{"key":27,"text":621,"correct":22},"过煤层应及时做好井帮支护封闭工作，当穿过中厚煤层进入底板岩层后，应立即砌筑永久井壁，并应根据需要注黄泥浆封闭",{"key":30,"text":623,"correct":22},"井筒穿过煤层期间，工作面必须定时监测，当发现井壁压力增大等异常现象时，应撤出人员，并采取治理措施",{"key":34,"text":625,"correct":22},"井筒施工过程，通风机必须连续运转。在无水的井筒中，掘进有煤层爆炸危险的煤层时，应采取喷雾洒水措施。在干燥的情况下，不得使用风镐掘进",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":185,"analysis":37},1124119,"井下爆破工作应由专职爆破员担任，在煤(岩)与瓦斯突出煤层中，专职爆破员应 固定在同一工作面工作，应做到（）。",[630,631,632,634,635],{"key":20,"text":581,"correct":22},{"key":24,"text":583,"correct":22},{"key":27,"text":633,"correct":32},"爆破后10min后，专职爆破员才能进工作面检査",{"key":30,"text":575,"correct":22},{"key":34,"text":636,"correct":32},"在特殊情况下可以由班长放炮",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":170,"analysis":37},1124120,"石门揭煤采用远距离爆破时，应制定包括（）等的专门措施。",[641,643,645,647,649],{"key":20,"text":642,"correct":32},"爆破看护",{"key":24,"text":644,"correct":22},"爆破地点",{"key":27,"text":646,"correct":22},"避灾路线",{"key":30,"text":648,"correct":22},"停电、撤人",{"key":34,"text":650,"correct":22},"警戒范围",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":127,"analysis":37},1124121,"井筒穿过含水岩层或破碎带，采用地面或工作面预注浆时的主要安全要求有( )",[655,657,659,661,663],{"key":20,"text":656,"correct":22},"注浆深度应大于注浆的含水层全部厚度，并深入进透水岩层或硬岩层5~10m",{"key":24,"text":658,"correct":22},"井底的设计位置在注浆的含水岩层内时，注浆深度应大于井深10m",{"key":27,"text":660,"correct":22},"井筒工作面预注浆前，在注浆含水岩层上方，必须设置注浆岩帽或混凝土止浆垫",{"key":30,"text":662,"correct":22},"岩帽或止浆垫的结构形式和厚度应根据最大注浆压力、岩石性质和工作条件 确定",{"key":34,"text":664,"correct":32},"注浆浆液的浓度一般要求采用浓浆",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":36,"analysis":37},1124122,"立井井筒施工时，要求安全梯的电动稳车能力不得小于5t，除此之外，还应设置 应急设施，以备断电时用以提升井下人员，下列（）可以作为应急设施。",[669,671,673,675,677],{"key":20,"text":670,"correct":22},"备用电源",{"key":24,"text":672,"correct":22},"手摇稳车",{"key":27,"text":674,"correct":22},"柴油发电机",{"key":30,"text":676,"correct":32},"备用稳车",{"key":34,"text":678,"correct":32},"爬梯",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":36,"analysis":37},1124123,"开拓新水平的井巷第一次接近未揭露的各煤层时，应做到（）。",[683,685,687,689,691],{"key":20,"text":684,"correct":22},"按照地测部门提供的掘进工作面距煤层的准确位置，必须在距煤层10m以外 开始打钻",{"key":24,"text":686,"correct":22},"钻孔超前工作面不得小于5m，并经常检査工作面瓦斯",{"key":27,"text":688,"correct":22},"当岩巷掘到遇到煤线或接近地质破碎带时，也必须经常检査瓦斯，如发现有瓦 斯大量增加或其他异常时，都必须撤出人员，停止掘进，进行处理",{"key":30,"text":690,"correct":32},"井下除了打钻作业人员，其他无关人员全部撤至地面",{"key":34,"text":692,"correct":32},"揭煤爆破前必须切断井下所有电源",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":82,"analysis":37},1124124,"《金属非金属地下矿山安全规程》规定在维修斜井和平巷，必须遵守的规定包括有 ( )。",[697,699,701,703,705],{"key":20,"text":698,"correct":22},"平巷修理或扩大断面，应首先加固工作地点附近的支架，然后拆除工作地点 的支架，并做好临时支护工作的准备",{"key":24,"text":700,"correct":22},"每次拆除的支架数应根据具体情况确定，密集支架的拆除，一次不得超过两架",{"key":27,"text":702,"correct":32},"维修独头巷道时必须按照从里向外的顺序进行",{"key":30,"text":704,"correct":32},"撤换独头巷道支架时，里边只能留班队长",{"key":34,"text":706,"correct":22},"维修斜井时，应停止车辆运行，并设警戒和明显标志",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":185,"analysis":37},1124125,"《铀矿业安全规程》规定，凡工程地质条件复杂，存在地压威胁的矿山，应遵守下 列规定（ ）。",[711,713,715,717,719],{"key":20,"text":712,"correct":22},"设立专门机构或专职人员负责地压管理，及时进行现场实测，掌握地压活动 规律，做好预测预报工作",{"key":24,"text":714,"correct":22},"发现有大面积地压活动预兆时，必须立即停止作业，将人员撤至安全地点，并 报告主管部门",{"key":27,"text":716,"correct":32},"地表陷落区应设明显标志或栅栏，通往陷落区和采空区的井巷应封闭。人员必 须进人陷落区和采空区，应由班队长组织",{"key":30,"text":718,"correct":22},"地表有滚石和陷落危险的矿山，应掌握滚石移动和陷落规律，及时提出预防措 施，不得在陷落区和滚石滑落范围内建筑任何设施",{"key":34,"text":720,"correct":32},"当遇暴雨天气时井下必须撤人",{"id":722,"libraryId":5,"type":15,"typeLabel":16,"stem":723,"options":724,"answer":127,"analysis":37},1124127,"《尾矿库安全管理规定》中的施工要求，未经技术论证和安全生产监督管理部门的 批准，任何单位和个人不得随意变更下述涉及尾矿库安全的事宜（）。",[725,727,729,731,733],{"key":20,"text":726,"correct":22},"筑坝方式",{"key":24,"text":728,"correct":22},"坝型、坝外坡坡比和最终埂轴线的位置",{"key":27,"text":730,"correct":22},"坝体防渗、排渗及反滤层的设置",{"key":30,"text":732,"correct":22},"排洪系统的形式、布置及尺寸",{"key":34,"text":734,"correct":32},"顼体的非破损性检査",[736,740,743,746,749,752],{"id":737,"name":738,"category":7,"favorite":739},1,"领导干部任职前廉政法规知识测试题",92,{"id":741,"name":742,"category":7,"favorite":737},595,"建筑结构与设备",{"id":744,"name":745,"category":7,"favorite":737},715,"招标采购专业知识与法律法规",{"id":747,"name":748,"category":7,"favorite":737},848,"市政方向-通用基础",{"id":750,"name":751,"category":7,"favorite":8},534,"BIM工程师",{"id":753,"name":751,"category":7,"favorite":8},535]