[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":735},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,24,50,1681,[13,38,53,68,83,98,113,128,143,158,173,188,203,217,231,246,260,274,288,302,317,330,344,358,372,386,400,414,428,442,457,471,484,498,509,523,537,550,564,579,594,608,621,635,649,663,678,692,706,720],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1123903,2,"多选题","目前常用立井施工机械化配套作业线包括有（）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","人工设备机械化作业线",false,{"key":24,"text":25,"correct":26},"B","综合设备机械化作业线",true,{"key":28,"text":29,"correct":26},"C","普通设备机械化作业线",{"key":31,"text":32,"correct":22},"D","高强设备机械化作业线",{"key":34,"text":35,"correct":22},"E","一般设备机械化作业线","BC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1123904,"下列有关综合设备机械化作业线配套方案的正确表述是（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"该作业线由伞钻和高效能抓岩机组成",{"key":24,"text":45,"correct":26},"这种方案应用最广，并且取得了良好的经济技术效益",{"key":28,"text":47,"correct":22},"该作业线可以满足千米以上井筒快速施工的要求",{"key":31,"text":49,"correct":26},"该方案机械化程度高，设备使用方便",{"key":34,"text":51,"correct":26},"它主要适应于井筒直径5~10m，井筒深度1000m的井筒施工","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1123905,"关于井筒预注浆工作，说法错误的是（）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"含水层距地表较浅时，采用地面预注浆较为合适",{"key":24,"text":60,"correct":22},"地面预注浆的钻孔一般布置在大于井筒掘进直径1~3m的圆周上",{"key":28,"text":62,"correct":22},"当含水岩层埋藏较深时，采用井筒工作面预注浆是比较合适",{"key":31,"text":64,"correct":26},"工作面预注浆的注浆孔间距取决于浆液在含水岩层中的扩散半径，一般为 1. 5~3. 0m",{"key":34,"text":66,"correct":26},"地面预注浆时，无论含水层厚薄，均可将含水岩层一次注完全深","DE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1123908,"在不稳定表土层中施工立井井筒，必须采取特殊的施工方法，目前以（ ） 为主。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"冻结法",{"key":24,"text":75,"correct":22},"沉井法",{"key":28,"text":77,"correct":26},"钻井法",{"key":31,"text":79,"correct":22},"注浆法",{"key":34,"text":81,"correct":22},"帷幕法","AC",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1123909,"下列关于钻井法说法中，正确的是（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"钻井法以钻头刀具破碎岩石，用泥浆或其他介质进行洗井、护壁和排渣",{"key":24,"text":90,"correct":22},"钻井法只适用于含松散、不稳定的含水层的地层",{"key":28,"text":92,"correct":22},"我国目前的立井钻井机最大钻井直径不超过8.0m",{"key":31,"text":94,"correct":26},"我国目前的立井钻井机最大钻井深度小于700m",{"key":34,"text":96,"correct":26},"钻井法在井筒钻至设计直径和深度后再进行永久支护","ADE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1123910,"下列关于注浆法说法中，正确的是（）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"根据注浆工作与井巷掘进工序的先后时间次序进行分类，注浆法分为预注浆 法和后注浆法",{"key":24,"text":105,"correct":26},"预注浆法是在凿井前或在井筒掘进到含水层之前所进行的注浆工作",{"key":28,"text":107,"correct":26},"后注浆法是在井巷掘砌之后所进行的注浆工作",{"key":31,"text":109,"correct":22},"预注浆往往是为了减少井筒涌水，杜绝井壁和井帮的渗水和加强永久支护采取 的治水措施",{"key":34,"text":111,"correct":26},"注浆法既可用于为了减少井筒涌水，加快凿井速度、对井筒全深范围内的所有 含水层进行预注浆“打干井”施工，又可对裂隙含水岩层和松散砂土层进行堵 水、加固","ABCE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1123911,"下列属于立井井筒施工辅助生产系统的是（）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"出矸系统",{"key":24,"text":120,"correct":26},"通风及排水系统",{"key":28,"text":122,"correct":26},"工作面照明与信号的设置、井筒测量以及布置安全梯",{"key":31,"text":124,"correct":26},"压风和供水系统",{"key":34,"text":126,"correct":26},"立井施工的地面排矸(废石)系统","BCDE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},1123912,"下列关于立井井筒掘进装岩设备的说法，错误的是（）。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"长绳悬吊抓岩机，施工中工人的劳动强度较大，抓斗的灵活性较差",{"key":24,"text":135,"correct":22},"中心回转抓岩机安设在下层吊盘，安装使用都很方便",{"key":28,"text":137,"correct":26},"环行轨道抓岩机由于其轨道的特殊性，使用中比中心回转抓岩机方便",{"key":31,"text":139,"correct":22},"靠壁抓岩机通常固定在岩壁上，要求围岩条件较好，一般适用于冶金矿山井筒 的掘进",{"key":34,"text":141,"correct":26},"目前使用最为普遍的是HZ形环行轨道抓岩机","CE",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":157,"analysis":37},1123914,"井筒工作面预注浆应该设置（），其目的是为了防止冒水跑浆。",[147,149,151,153,155],{"key":20,"text":148,"correct":22},"保护盘",{"key":24,"text":150,"correct":26},"混凝土止水垫",{"key":28,"text":152,"correct":22},"保护岩柱",{"key":31,"text":154,"correct":26},"保留岩帽",{"key":34,"text":156,"correct":22},"止浆盘","BD",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":172,"analysis":37},1123915,"立井井筒施工中井筒内应布置（），用于突发涌水情况下的排水工作。",[162,164,166,168,170],{"key":20,"text":163,"correct":22},"吊桶",{"key":24,"text":165,"correct":22},"潜水泵",{"key":28,"text":167,"correct":26},"吊泵",{"key":31,"text":169,"correct":26},"卧泵",{"key":34,"text":171,"correct":22},"压力泵","CD",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":187,"analysis":37},1123916,"井巷工程中，钻眼爆破法施工的主要工序包括（）。",[177,179,181,183,185],{"key":20,"text":178,"correct":26},"工作面钻眼爆破工作",{"key":24,"text":180,"correct":26},"装岩与提升工作",{"key":28,"text":182,"correct":26},"井筒支护工作",{"key":31,"text":184,"correct":26},"通风、排水、测量等辅助工作",{"key":34,"text":186,"correct":22},"施工组织设计编制","ABCD",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":202,"analysis":37},1123917,"在立井基岩掘进中，钻眼爆破工作是一项主要工序，其中的爆破工作主要包括（）。",[192,194,196,198,200],{"key":20,"text":193,"correct":22},"爆破安全评估",{"key":24,"text":195,"correct":26},"爆破器材的选择",{"key":28,"text":197,"correct":26},"确定爆破参数",{"key":31,"text":199,"correct":26},"编制爆破图表",{"key":34,"text":201,"correct":22},"炸药和雷管购买","BCD",{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":112,"analysis":37},1123918,"关于井筒支护工作中的永久支护，以下说法正确的是（）。",[207,209,211,213,215],{"key":20,"text":208,"correct":26},"立井井筒永久支护是井筒施工中的一个重要工序",{"key":24,"text":210,"correct":26},"根据所用材料不同，立井井筒永久支护有料石井壁、混凝土井壁、钢筋混凝土井壁和锚喷支护井壁。砌筑料石井壁劳动强度大，不易实现机械化施工，而且井壁的整体性和封水性都很差，目前多数井筒采用整体式混凝土井壁。浇筑井壁的混凝土，其配合比必须经由有资质的单位试验确定，其强度必须由现场预留试块进行试压确认。在地面混凝土搅拌站搅拌好的混凝土，经输料管或吊桶输送到井下注入模板内",{"key":28,"text":212,"correct":26},"浇筑混凝土井壁的模板有多种。采用长段掘砌单行作业和平行作业时，多采用液压滑升模板或装配式金属模板。采用短段掘砌混合作业时，多采用金属整体移动式模板",{"key":31,"text":214,"correct":22},"短段掘砌混合作业方式在施工立井中被广泛应用，金属整体移动式伸缩模板得到了普遍地应用。金属整体移动式模板的高度，一般根据围岩的稳定性和施工段高来决定，稳定岩层中可达1~2 m",{"key":34,"text":216,"correct":26},"在我国，部分矿井井筒采用锚喷支护作为井筒永久支护，特别是无提升设备的井筒中，采用锚喷支护作为永久支护，可使施工大为简化，施工机械化程度也大为提高，并且减少了井筒掘进工程量",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":187,"analysis":37},1123919,"关于立井施工辅助工作，以下说法正确的是（）。",[221,223,225,227,229],{"key":20,"text":222,"correct":26},"通风工作：井筒施工中，工作面必须不断地通入新鲜空气，以清洗和冲淡岩石中和爆破时产生的有害气体，保证工作人员的身体健康。立井掘进的通风是由设置在地面的通风机和井内的风筒完成的。可采用压人式、抽出式或抽出辅以压人式通风。",{"key":24,"text":224,"correct":26},"井筒涌水的处理：井筒施工中，井内一般都有较大涌水，通常可采用注浆堵水、导水与截水、钻孔泄水和井筒排水等方法进行处理。",{"key":28,"text":226,"correct":26},"压风和供水工作：立井井筒施工中，工作面打眼、装岩和喷射混凝土作业所需要的压风和供水通常由吊挂在井内的压风管和供水管输送到工作面",{"key":31,"text":228,"correct":26},"其他辅助工作：立井施工时其他辅助工作还有井下供电、照明、通信与信号的设置、测量以及布置安全梯等",{"key":34,"text":230,"correct":22},"以上都不对",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":245,"analysis":37},1123920,"关于掘、砌单行作业中的长段单行作业，以下说法正确的是（）。",[235,237,239,241,243],{"key":20,"text":236,"correct":26},"长段单行作业是在规定的段高内，先自上而下掘进井筒，同时进行临时支护，待掘至设计的井段高度时，即由下而上砌筑永久井壁，直至完成全部井筒工程。",{"key":24,"text":238,"correct":22},"采用挂圈背板临时支护时，段高一般以40~60 m为宜，最大不应超过80 m，支护时间不得超过一个月",{"key":28,"text":240,"correct":26},"在井筒基岩段施工中，由于挂圈背板临时支护材料消耗大，经济效益不明显，安全可靠性也相对较低，已很少采用",{"key":31,"text":242,"correct":26},"采用锚喷临时支护时，由于井帮围岩得到及时封闭，消除了岩帮风化和出现危岩垮帮等现象，可以采用较大段高。现场为了便于成本核算和施工管理，往往按月成井速度来确定段高。锚喷临时支护的结构和参数应视井筒岩性区别对待",{"key":34,"text":244,"correct":26},"长段单行作业的缺点是需要进行临时支护，增加施工成本和工期，优点是可以较好地保证井筒施工质量，减少混凝土接茬缝。该种作业方式一般在煤矿井身施工中不常见，多用在金属矿山岩石条件较好的立井施工和煤矿的立井壁座施工中","ACDE",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":245,"analysis":37},1123921,"在立井施工中用伞形钻架打眼，其主要优点有（)",[250,252,254,256,258],{"key":20,"text":251,"correct":26},"机械化程度高",{"key":24,"text":253,"correct":22},"适应条件好",{"key":28,"text":255,"correct":26},"劳动强度低",{"key":31,"text":257,"correct":26},"钻眼速度快",{"key":34,"text":259,"correct":26},"工作安全",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":245,"analysis":37},1123922,"在立井施工中选择HZ-4中心回转抓岩机出渣的优点是（）。",[264,266,268,270,272],{"key":20,"text":265,"correct":26},"安装使用都很方便",{"key":24,"text":267,"correct":22},"运行费用低",{"key":28,"text":269,"correct":26},"机械化程度高、生产能力大",{"key":31,"text":271,"correct":26},"动力单一、操作灵便",{"key":34,"text":273,"correct":26},"结构合理、运转可靠",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":52,"analysis":37},1123923,"立井施工中井筒基岩段施工选择了综合机械化作业线，一般情况下组配机械化作 业线的原则为（）。",[278,280,282,284,286],{"key":20,"text":279,"correct":26},"应根据工程的条件，施工队伍的素质和已具有的设备条件等因素，进行综合 考虑，最后选定配套类型",{"key":24,"text":281,"correct":26},"各设备之间的能力要匹配，配套方式应与作业方式相适应",{"key":28,"text":283,"correct":22},"应考虑以经济效益第一为前提",{"key":31,"text":285,"correct":26},"配套方式应与设备技术性能相适应，选用寿命长、性能可靠的设备",{"key":34,"text":287,"correct":26},"配套方式应与施工队伍的素质相适应",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":52,"analysis":37},1123924,"立井井筒施工时可选择的排水方案有（）。",[292,294,296,298,300],{"key":20,"text":293,"correct":26},"吊桶排水",{"key":24,"text":295,"correct":26},"吊泵排水",{"key":28,"text":297,"correct":22},"压气排水系统",{"key":31,"text":299,"correct":26},"风动潜水泵配合吊泵进行排水",{"key":34,"text":301,"correct":26},"卧泵排水",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":316,"analysis":37},1123925,"通常立井井筒基岩段含水层的处理方法包括（）。",[306,308,310,312,314],{"key":20,"text":307,"correct":26},"地面预注浆",{"key":24,"text":309,"correct":26},"工作面预注浆",{"key":28,"text":311,"correct":22},"壁后注浆",{"key":31,"text":313,"correct":22},"利用泄水管泄水",{"key":34,"text":315,"correct":22},"布置吊泵排水","AB",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":245,"analysis":37},1123926,"立井井筒施工时需要布置的凿井设施主要包括有（）。",[321,323,324,326,328],{"key":20,"text":322,"correct":26},"吊盘",{"key":24,"text":148,"correct":22},{"key":28,"text":325,"correct":26},"固定盘",{"key":31,"text":327,"correct":26},"封口盘",{"key":34,"text":329,"correct":26},"翻矸台",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":112,"analysis":37},1123927,"井筒如采用工作面预注浆方法进行防治水，则应该遵守的规定有（）。",[334,336,338,340,342],{"key":20,"text":335,"correct":26},"注浆施工前，必须编制注桨工程设计",{"key":24,"text":337,"correct":26},"注浆段长度必须大于注浆的含水岩层的厚度，并深入到不透水岩层或硬岩层5 ~10m",{"key":28,"text":339,"correct":26},"注浆过程中，注浆压力突然上升时必须停止注浆泵运转，卸压后方可处理",{"key":31,"text":341,"correct":22},"注浆结束后，便可开凿井筒",{"key":34,"text":343,"correct":26},"注浆前在含水层上方，必须按设计要求设置止浆岩帽或混凝土止浆垫",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":82,"analysis":37},1123928,"若井筒采用现浇混凝土井壁结构，工作面浇注的混凝土可采用（）。",[348,350,352,354,356],{"key":20,"text":349,"correct":26},"吊桶下放混凝土",{"key":24,"text":351,"correct":22},"罐笼下放混凝土",{"key":28,"text":353,"correct":26},"管路下放混凝土",{"key":31,"text":355,"correct":22},"箕斗下放混凝土",{"key":34,"text":357,"correct":22},"矿车下放混凝土",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":127,"analysis":37},1123929,"立井井筒施工作业方式在选择时，应综合分析和考虑（）。",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"企业规模与技术人员数量",{"key":24,"text":365,"correct":26},"井筒穿过岩层性质、涌水量的大小和井壁支护结构",{"key":28,"text":367,"correct":26},"施工队伍的操作技术水平和施工管理水平",{"key":31,"text":369,"correct":26},"井筒直径和深度(基岩部分）",{"key":34,"text":371,"correct":26},"可能采用的施工工艺及技术装备条件",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":187,"analysis":37},1123930,"立井井筒施工的主要辅助工作有（）。",[376,378,380,382,384],{"key":20,"text":377,"correct":26},"通风工作",{"key":24,"text":379,"correct":26},"井筒涌水的处理",{"key":28,"text":381,"correct":26},"压风和供水工作",{"key":31,"text":383,"correct":26},"支护工作",{"key":34,"text":385,"correct":22},"其他辅助工作",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":127,"analysis":37},1123931,"关于掘、砌单行作业中的短段掘、砌单行作业，以下说法正确的是（）。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"短段掘、砌单行作业是在5~8 m (应与模板高度一致)较小的段高内，掘进后，即进行永久支护，不用临时支护",{"key":24,"text":393,"correct":26},"为便于下一循环的打眼工作，爆破后，矸石暂不全部清除",{"key":28,"text":395,"correct":26},"砌壁时，立模、稳模和浇灌混凝土都在浮矸上进行",{"key":31,"text":397,"correct":26},"短段掘、砌单行作业的优点是不需要临时支护，降低成本和工期，缺点是井壁的混凝土接茬缝比较多",{"key":34,"text":399,"correct":26},"随着井壁混凝土浇筑技术的提高，接茬缝的质量大大提高，而且一般在井筒施工完毕后进行壁后注浆封水，短段掘、砌单行作业的缺点基本得到克服，该作业方式成为目前最常见的立井施工作业方式",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":187,"analysis":37},1123932,"关于掘、砌混合作业，以下说法正确的是（）。",[404,406,408,410,412],{"key":20,"text":405,"correct":26},"井筒掘、砌工序在时间上有部分平行时称混合作业",{"key":24,"text":407,"correct":26},"它既不同于单行作业(掘、砌顺序完成），也不同于平行作业(掘、砌平行进行)。混合作业是随着凿井技术的发展而产生。这种作业方式区别于短段单行作业",{"key":28,"text":409,"correct":26},"对于短段单行作业，掘、砌工序顺序进行，而混合作业，是在向模板浇灌混凝土达1m 高左右时，在继续浇筑混凝土的同时，即可装岩出渣。待井壁浇筑完成后，作业面上的掘进工作又转为单独进行，依此往复循环",{"key":31,"text":411,"correct":26},"这种作业方式的优点是在井壁浇筑混凝土的时候有平行作业的出渣工序，节省工期。但是这种作业方式的前提是采用溜灰管输送混凝土或者是两套提升系统（一套提升系统输送混凝土一套出渣）",{"key":34,"text":413,"correct":22},"其缺点是劳动组织相对复杂，需要较高的施工管理水平，一般用在直径超过4. 5 m 的井筒中，在冻结表土段施工中使用也较常见",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":52,"analysis":37},1123933,"关于注浆法，以下说法正确的是（）。",[418,420,422,424,426],{"key":20,"text":419,"correct":26},"注浆法是矿山井巷工程凿井和治水的主要方法之一，也是地下工程中地层改良的重要手段。注浆法是将浆液注入到岩土的孔隙、裂隙或空洞中，浆液经扩散、凝固、硬化以减少岩土的渗透性，增加其强度和稳定性，达到岩土加固和堵水的目的。",{"key":24,"text":421,"correct":26},"注浆法的分类方法很多，矿山井巷工程通常根据注浆工作与井巷掘进工序的先后时间次序进行分类，即分为预注浆法和后注浆法",{"key":28,"text":423,"correct":22},"预注浆法是在凿井前或在井筒掘进到含水层之前所进行的注浆工程。依其施工地点而异，预注浆法又可分为地面预注浆，井塔底预注浆和工作面预注浆三种施工方案",{"key":31,"text":425,"correct":26},"后注浆法是在井巷掘砌之后所进行的注浆工作。后注浆的目的通常是为了减少井筒涌水，控制井壁和井帮的渗水并加强永久支护",{"key":34,"text":427,"correct":26},"注浆法目前在井巷施工中应用十分广泛，它既可用于为了减少井筒涌水，加快凿井速度、对井筒全深范围内的所有含水层(除表土外)进行预注浆的“ 打干井”施工，又可对裂隙含水岩层和松散砂土层进行堵水、加固。在大裂隙、破碎带和大溶洞等复杂地层中也可采用",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":187,"analysis":37},1123934,"巷道与硐室的施工目前主要以采用钻眼爆破法为主，该方法的主要施工程序是（）。",[432,434,436,438,440],{"key":20,"text":433,"correct":26},"工作面钻眼爆破",{"key":24,"text":435,"correct":26},"通风与安全检査",{"key":28,"text":437,"correct":26},"装渣与出渣",{"key":31,"text":439,"correct":26},"临时支护及巷道永久支护",{"key":34,"text":441,"correct":22},"排水管路安装",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":456,"analysis":37},1123936,"巷道掘进装岩过程中，工作面调车可采用（）等。",[446,448,450,452,454],{"key":20,"text":447,"correct":22},"人工调车法",{"key":24,"text":449,"correct":22},"机械调车法",{"key":28,"text":451,"correct":26},"固定错车场调车法",{"key":31,"text":453,"correct":26},"活动错车场调车法",{"key":34,"text":455,"correct":26},"利用转载设备调车法","CDE",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":52,"analysis":37},1123939,"下列关于巷道施工机械化作业线的配套原则的说法正确的是（）。",[461,463,465,467,469],{"key":20,"text":462,"correct":26},"钻眼、装岩、调车、运输等主要工序应基本采用机械化作业，以减轻笨重的 体力劳动",{"key":24,"text":464,"correct":26},"各工序所使用的机械设备，在生产能力上要匹配合理，相互适应，避免因设备 能力不均衡，而影响某些设备潜力的发挥",{"key":28,"text":466,"correct":22},"配备的机械设备能力和数量应和需要量相等",{"key":31,"text":468,"correct":26},"机械的规格及结构形式必须适应施工条件、巷道规格及作业方式的要求",{"key":34,"text":470,"correct":26},"要保证施工能获得持续高速度、高效率以及合理的经济技术指标，并确保安全",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":187,"analysis":37},1123940,"关于巷道施工机械化设备配套方案，以下说法正确的是（）。",[475,477,479,481,483],{"key":20,"text":476,"correct":26},"多台气腿式凿岩机钻眼-伊斗后卸式或耙斗式装载机装岩-固定错车场或浮放道岔或调车器调车-矿车及电机车运输。这种作业线简单易行，但机械化程度较低，且对巷道断面有一定要求，在我国矿山应用最多。",{"key":24,"text":478,"correct":26},"多台气腿式凿岩机钻眼-把斗式装载机或铲斗侧卸式装载机装岩-胶带运输机转载-主井提矸系统。这种作业线利用系统出矸，并且以增加胶带运输机来实现快速转运，效率高，速度快，但前提条件是主井必须具有提矸系统，也可以将主井改造后采取分时提矸的方式来实现",{"key":28,"text":480,"correct":26},"多台气腿式凿岩机钻眼-耙斗式装载机或铲斗侧卸式装载机装岩-胶带运输机转载-立式矸石仓-矿车及电机车运输。此种方式在金属矿应用较为广泛，但必须具备利用原有矸石仓和施工新的矸石仓的条件",{"key":31,"text":482,"correct":26},"多台气腿式凿岩机钻眼-耙斗式装载机或铲斗侧卸式装载机装岩-胶带运输机转载-水平矸石仓或梭式矿车-矿车及电机车运输。水平矸石仓就是在巷道-侧用挡板隔离人为形成一个水平储矸仓，然后使用耙斗式耙矸机将矸石装入矿车。梭式矿车的储矸能力较小，目前巳较少使用",{"key":34,"text":230,"correct":22},{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":127,"analysis":37},1123941,"与掘进循环的总时间相关的因素包括（）。",[488,490,492,494,496],{"key":20,"text":489,"correct":22},"排水时间",{"key":24,"text":491,"correct":26},"装岩工作时间",{"key":28,"text":493,"correct":26},"钻眼工作时间",{"key":31,"text":495,"correct":26},"装药、连线时间",{"key":34,"text":497,"correct":26},"放炮通风时间",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":112,"analysis":37},1123942,"倾斜巷道的上山施工法包括（ ）。",[502,504,505,506,508],{"key":20,"text":503,"correct":26},"钻眼爆破工作",{"key":24,"text":180,"correct":26},{"key":28,"text":383,"correct":26},{"key":31,"text":507,"correct":22},"排水工作",{"key":34,"text":377,"correct":26},{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":142,"analysis":37},1123944,"某矿井主要巷道采用锚喷支护，局部地段岩石比较破碎，但没有涌水，支护结构 宜采用（）。",[513,515,517,519,521],{"key":20,"text":514,"correct":22},"木支架",{"key":24,"text":516,"correct":22},"锚喷支护",{"key":28,"text":518,"correct":26},"锚喷网联合支护",{"key":31,"text":520,"correct":22},"现浇混凝土衬砌",{"key":34,"text":522,"correct":26},"锚喷复合支护",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":536,"analysis":37},1123945,"岩石平巷施工工作面使用凿岩台车打眼，凿岩台车具备的主要优点为（）。",[527,528,530,532,534],{"key":20,"text":257,"correct":26},{"key":24,"text":529,"correct":26},"炮眼质量好",{"key":28,"text":531,"correct":22},"设备一机多用",{"key":31,"text":533,"correct":26},"钻眼实现全面机械化",{"key":34,"text":535,"correct":22},"实现钻眼与装岩工作的平行作业","ABD",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":127,"analysis":37},1123946,"岩石巷道与硐室的施工目前主要以采用钻眼爆破法为主，其主要施工程序包括( )o",[541,543,544,546,548],{"key":20,"text":542,"correct":22},"设备安装",{"key":24,"text":433,"correct":26},{"key":28,"text":545,"correct":26},"通风、安全检查",{"key":31,"text":547,"correct":26},"临时支护",{"key":34,"text":549,"correct":26},"装渣出渣以及巷道永久支护",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":127,"analysis":37},1123947,"关于抽出式通风，以下说法正确的是（）。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"抽出式通风是局部扇风机把工作面的污浊空气用风筒抽出，新鲜风流沿巷道流入。风筒的排风口必须设在主要巷道风流方向的下方，距掘进巷道口也不得小于1 0 m，并将污浊空气排至回风巷道内。",{"key":24,"text":557,"correct":26},"在通风过程中，炮烟逐渐经风筒排出，当炮烟抛掷区内的炮烟浓度下降到允许浓时，即认为排烟过程结束",{"key":28,"text":559,"correct":26},"抽出式通风回风流经过扇风机，如果因叶轮与外壳碰撞或其他原因产生火花，有引起煤尘、瓦斯爆炸的危险，因此在有瓦斯涌出的工作面不宜采用",{"key":31,"text":561,"correct":26},"抽出式通风的有效吸程很短，只有当风筒口离工作面很近时才能获得满意的效果",{"key":34,"text":563,"correct":26},"抽出式通风的优点是：在有效吸程内排尘的效果好，排除炮烟所需的风量较小，回风流不污染巷道等。抽出式通风只能用刚性风筒或有刚性骨架的柔性风筒",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":578,"analysis":37},1123948,"根据硐室断面大小及其围岩的稳定程度，硐室施工方法主要分为（）。",[568,570,572,574,576],{"key":20,"text":569,"correct":22},"机械施工法",{"key":24,"text":571,"correct":26},"全断面施工法",{"key":28,"text":573,"correct":22},"部分断面施工法",{"key":31,"text":575,"correct":26},"分层施工法",{"key":34,"text":577,"correct":26},"导硐施工法","BDE",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":593,"analysis":37},1123949,"下山巷道施工中由于采用自上向下法施工，为预防跑车事故，应在（ ）等处安 装阻车器。",[583,585,587,589,591],{"key":20,"text":584,"correct":26},"工作面上方",{"key":24,"text":586,"correct":22},"工作面下方",{"key":28,"text":588,"correct":22},"倾斜巷道的中部",{"key":31,"text":590,"correct":26},"倾斜巷道上部车场与巷道连接处",{"key":34,"text":592,"correct":22},"倾斜巷道躲避硐内","AD",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":607,"analysis":37},1123950,"下山掘进时，工作面通常会有积水，影响掘进的进行，因此必须及时排出工作面 积水，常使用的排水方法有（）。",[598,599,601,603,605],{"key":20,"text":295,"correct":22},{"key":24,"text":600,"correct":26},"潜水泵排水",{"key":28,"text":602,"correct":26},"卧泵和腰泵房水仓结合排水",{"key":31,"text":604,"correct":22},"潜水泵配吊桶排水",{"key":34,"text":606,"correct":26},"喷射泵排水","BCE",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":112,"analysis":37},1123951,"如巷道施工选择机械化作业线，组配作业线应该主要考虑（）。",[612,614,615,617,619],{"key":20,"text":613,"correct":26},"掘进中各主要工序均应采用机械化作",{"key":24,"text":468,"correct":26},{"key":28,"text":616,"correct":26},"各工序使用的机械设备，在生产能力上要匹配合理、相互适应",{"key":31,"text":618,"correct":22},"企业规模大小、管理水平等",{"key":34,"text":620,"correct":26},"尽量减少机械设备的数量，尽量一机多用，并要确保安全",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":536,"analysis":37},1123952,"对于近水平巷道的掘进可选择的通风方式有（）。",[625,627,629,631,633],{"key":20,"text":626,"correct":26},"压入式",{"key":24,"text":628,"correct":26},"抽出式",{"key":28,"text":630,"correct":22},"全风压方式",{"key":31,"text":632,"correct":26},"混合式",{"key":34,"text":634,"correct":22},"局部通风方式",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":52,"analysis":37},1123953,"巷道支护为锚喷支护，为了确保喷层质量、减少回弹率和降低粉尘浓度，喷射混 凝土施工时必须正确选择的工艺参数有（）。",[639,641,643,645,647],{"key":20,"text":640,"correct":26},"喷射机工作风压与供水压力",{"key":24,"text":642,"correct":26},"水灰比",{"key":28,"text":644,"correct":22},"喷射机电机转速",{"key":31,"text":646,"correct":26},"喷头与受喷面的距离及倾角",{"key":34,"text":648,"correct":26},"分层喷射的间歇时间",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":187,"analysis":37},1123954,"关于硐室的分层施工法，以下说法正确的是（）。",[653,655,657,659,661],{"key":20,"text":654,"correct":26},"当用全断面一次掘进围岩维护困难，或者由于硐室的高度较大而不便于施工时，将整个硐室分为几个分层，施工时形成台阶状。上分层工作面超前施工的，称为正台阶工作面施工法；下分层工作面超前施工的称为倒台阶工作面施工法。",{"key":24,"text":656,"correct":26},"正台阶工作面(下行分层)施工法按照硐室的高度，整个断面可分为2 个以上分层，每分层的高度以1.8~3.0m 为宜或以起拱线作为上分层。上分层的超前距离一般为2~3 m。如果硐室是采用砌碹支护，在上分层掘进时应先用锚喷支护(一般锚喷支护为永久支护的一部分砌碹工作可落后于下分层掘进1.5~3. 0 m，下分层也随掘随砌墙，使墙紧跟迎头",{"key":28,"text":658,"correct":26},"采用正台阶工作面施工方法应注意的问题是：要合理确定上下分层的错距，距离太大，上分层出矸困难；距离太小，上分层钻眼困难，故上下分层工作面的距离以便于气腿式凿岩机正常工作为宜",{"key":31,"text":660,"correct":26},"倒台阶工作面(上行分层)施工法下分层工作面超前边掘边砌墙，上分层工作面用挑顶的矸石作脚手架砌顶部碹",{"key":34,"text":662,"correct":22},"当支护方式为金属支架支护时，上分层应先掘出起拱线以上部分，前窜前探梁并把拱顶部分支护好，然后将两帮岩石掘出，将支架的腿子栽好，并腰帮接实。中间的岩石暂时保留并作为顶板支护作业时的平台，可滞后上分层4~6m",{"id":664,"libraryId":5,"type":15,"typeLabel":16,"stem":665,"options":666,"answer":677,"analysis":37},1123955,"在矿山建设工程项目管理中，矿井建设的工期一般可采用下列（ ）方法来进行 推算。",[667,669,671,673,675],{"key":20,"text":668,"correct":26},"根据矿井建设的关键线路来推算",{"key":24,"text":670,"correct":22},"根据安装工程的施工工期来推算",{"key":28,"text":672,"correct":26},"根据与矿建工程密切相连的土建和安装工程工期来推算",{"key":31,"text":674,"correct":26},"根据主要生产设备定货、到货和安装时间来推算",{"key":34,"text":676,"correct":22},"根据地面土建工程的施工时间来推算","ACD",{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":172,"analysis":37},1123956,"以下关于矿山工程进度的说法，不正确的是（ ）。",[682,684,686,688,690],{"key":20,"text":683,"correct":22},"把工期目标定得很高，相应地投资就要增加或质量要求适当降低",{"key":24,"text":685,"correct":22},"如果对质量要求较高，就要投入较多的资金和花费较长的建设时间",{"key":28,"text":687,"correct":26},"井巷工程关键线路对矿井的建设工期没有决定作用",{"key":31,"text":689,"correct":26},"高瓦斯矿井宜采用上山掘进",{"key":34,"text":691,"correct":22},"把重点队和技术力量过硬的施工队，放在关键线路上施工可以缩短工期",{"id":693,"libraryId":5,"type":15,"typeLabel":16,"stem":694,"options":695,"answer":456,"analysis":37},1123957,"安排主、副井筒开工顺序时，考虑比较正确的是（）。",[696,698,700,702,704],{"key":20,"text":697,"correct":22},"副井先开工，因为副井工程量较小，施工进度快，有利于关键线路的推进",{"key":24,"text":699,"correct":22},"主、副井同时开工，可以在同期完成较多的工程量，有利提前完成总工作量",{"key":28,"text":701,"correct":26},"主井先开工，有利于主、副井同时到达井底和提升系统改装",{"key":31,"text":703,"correct":26},"主、副井同时开工要求设备、劳动力等的投入高",{"key":34,"text":705,"correct":26},"副井先到井底的方案，主要适用于副井能利用整套永久提升设备时考虑",{"id":707,"libraryId":5,"type":15,"typeLabel":16,"stem":708,"options":709,"answer":127,"analysis":37},1123958,"井巷工程的关键线路工期决定着矿井的建设工期，加快关键线路上各工作的施工 方法和措施是（）。",[710,712,714,716,718],{"key":20,"text":711,"correct":22},"优化矿井设计",{"key":24,"text":713,"correct":26},"合理安排关键工作的开工顺序，采用新技术、新装备、新工艺，加快施工速度",{"key":28,"text":715,"correct":26},"把技术过硬，机械装备先进的重点队伍安排在关键线路上施工",{"key":31,"text":717,"correct":26},"利用措施工程来缩短主要矛盾线的长度",{"key":34,"text":719,"correct":26},"加强综合平衡，搞好工序衔接，缩短辅助时间",{"id":721,"libraryId":5,"type":15,"typeLabel":16,"stem":722,"options":723,"answer":734,"analysis":37},1123959,"矿业工程施工中，进度控制的一般性措施包括（ ）。",[724,726,728,730,732],{"key":20,"text":725,"correct":26},"突出关键路线",{"key":24,"text":727,"correct":26},"加强生产要素的配置管理",{"key":28,"text":729,"correct":26},"严格控制工序",{"key":31,"text":731,"correct":22},"投入更多的资金",{"key":34,"text":733,"correct":22},"加强施工质量管理","ABC",[736,740,743,746,749,752],{"id":737,"name":738,"category":7,"favorite":739},1,"领导干部任职前廉政法规知识测试题",92,{"id":741,"name":742,"category":7,"favorite":737},595,"建筑结构与设备",{"id":744,"name":745,"category":7,"favorite":737},715,"招标采购专业知识与法律法规",{"id":747,"name":748,"category":7,"favorite":737},848,"市政方向-通用基础",{"id":750,"name":751,"category":7,"favorite":8},534,"BIM工程师",{"id":753,"name":751,"category":7,"favorite":8},535]