[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,19,50,1681,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,318,330,342,354,366,378,390,402,414,426,438,450,462,472,484,496,508,520,532,544,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1123636,1,"单选题","废石场应设置截水、导水沟，防止（ ）流入废石场，防止泥石流危及下游环境。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","雨水",false,{"key":24,"text":25,"correct":26},"B","外部水",true,{"key":28,"text":29,"correct":22},"C","河水",{"key":31,"text":32,"correct":22},"D","尾矿水","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1123637,"在粉煤灰和锅炉渣中也常含有（ ）以上的未燃尽炭，可从中直接回收炭或用以烧制砖瓦。",[38,40,42,44],{"key":20,"text":39,"correct":26},"10％",{"key":24,"text":41,"correct":22},"15％",{"key":28,"text":43,"correct":22},"20％",{"key":31,"text":45,"correct":22},"30％",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1123638,"国家对放射性污染的防治，实行（ ）的方针。",[50,52,54,56],{"key":20,"text":51,"correct":22},"预防为主、治理为辅、严格监督、确保安全",{"key":24,"text":53,"correct":22},"积极预防、严格治理、确保安全、讲求效率",{"key":28,"text":55,"correct":22},"防治结合、严格管理、安全第一、讲究效率",{"key":31,"text":57,"correct":26},"预防为主、防治结合、严格管理、安全第一",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1123639,"开发利用伴生放射性矿的单位，应当在申请领取采矿许可证前编制环境影响报告书，上报（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"国务院环境保护行政主管部门审查批准",{"key":24,"text":65,"correct":26},"省级以上人民政府环境保护行政主管部门审查批准",{"key":28,"text":67,"correct":22},"当地政府环境保护行政主管部门审查批准",{"key":31,"text":69,"correct":22},"上级行政主管部门审批",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1123640,"安全管理制度和生产管理制度，做好现场管理和落实工作，特别要落实（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"生产管理制度的工作",{"key":24,"text":77,"correct":22},"技术管理制度的工作",{"key":28,"text":79,"correct":22},"质量管理制度的工作",{"key":31,"text":81,"correct":26},"安全管理制度的工作",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1123641,"铀（钍）矿开发利用单位应当制定铀（钍）矿退役计划，铀矿退役费用（ ）安排。",[86,88,90,92],{"key":20,"text":87,"correct":22},"自筹资金",{"key":24,"text":89,"correct":22},"矿山企业主管部门",{"key":28,"text":91,"correct":22},"省级人民政府财政预算",{"key":31,"text":93,"correct":26},"国家财政预算",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1123642,"矿业工程施工重大安全隐患管理，对于矿山企业应建立、健全通风防尘、辐射防护专业机构，配备必要的技术人员和工人，并列入生产人员编制。通风防尘专职人员名额应不少于接尘人数的（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"1％～3％",{"key":24,"text":101,"correct":22},"3％～5％",{"key":28,"text":103,"correct":26},"5％～7％",{"key":31,"text":105,"correct":22},"7％～10％",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1123643,"立井井筒施工悬吊系统管理，对于悬吊系统安装应有检查、验收记录，悬吊装置要有质量检验报告单；独眼井临时改绞须布置（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"安全梯",{"key":24,"text":113,"correct":22},"吊桶",{"key":28,"text":115,"correct":22},"吊笼",{"key":31,"text":117,"correct":22},"罐笼",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1123644,"矿井工程井下文明施工应当（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"将施工的泥浆水排人河流，防止污染环境",{"key":24,"text":125,"correct":26},"保证水沟畅通，盖板齐全、稳固、平整",{"key":28,"text":127,"correct":22},"将井下排出的废石堆放在生活区附近",{"key":31,"text":129,"correct":22},"采取提高风速的办法来降低风尘",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1123645,"矿山建设过程中，地层变形、位移和地下水迁移和运动，地表受到影响是由于（ ）导致地层压力和地下生态环境失衡引起的。",[134,136,138,140],{"key":20,"text":135,"correct":22},"疏干排水",{"key":24,"text":137,"correct":26},"开挖",{"key":28,"text":139,"correct":22},"滑坡",{"key":31,"text":141,"correct":22},"泥石流",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1123646,"工程建设环境保护要求中，不属于防治水土污染的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"临时设施的建筑材料应符合环保、消防要求",{"key":24,"text":149,"correct":22},"食堂应设置隔油池，并应及时清理",{"key":28,"text":151,"correct":22},"施工现场应设置排水沟及沉淀池",{"key":31,"text":153,"correct":22},"厕所的化粪池应做抗渗处理",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1123647,"下列不属于井下环境保护方面的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"矿井通风工作",{"key":24,"text":161,"correct":26},"个人劳动卫生保护",{"key":28,"text":163,"correct":22},"定时、定点洒水",{"key":31,"text":165,"correct":22},"井下清洁工作",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1123648,"对有毒固（液）体废物的堆放，必须采取（ ）等防止危害的措施，并设置有害废物的标志。",[170,172,174,176],{"key":20,"text":171,"correct":26},"防水、防渗、防流失",{"key":24,"text":173,"correct":22},"防止腐蚀",{"key":28,"text":175,"correct":22},"防止与一般废物混放",{"key":31,"text":177,"correct":22},"防止破碎、挥发",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1123649,"选矿厂必须有完善的（ ）设施，严禁尾矿排入江、河、湖、海。",[182,184,186,188],{"key":20,"text":183,"correct":22},"尾矿运送",{"key":24,"text":185,"correct":22},"防止渗漏和腐蚀",{"key":28,"text":187,"correct":26},"尾矿处理",{"key":31,"text":189,"correct":22},"尾矿贮存",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1123650,"施工过程中的环境保护措施不正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"严格执行“三同时”政策",{"key":24,"text":197,"correct":22},"采用先进的施工技术",{"key":28,"text":199,"correct":22},"严格遵循施工中的卫生、环保要求",{"key":31,"text":201,"correct":22},"加强施工地点通风、洒水",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1123652,"矿业工程现场管理既包括目标性管理，也包括生产要素管理，以及组织协调和现场文明管理等内容，这是一种（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"综合性管理",{"key":24,"text":209,"correct":22},"群众性管理",{"key":28,"text":211,"correct":22},"动态性管理",{"key":31,"text":213,"correct":22},"服务性管理",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1123653,"矿产资源的开发首先受到（ ）的约束。",[218,220,222,224],{"key":20,"text":219,"correct":26},"矿产资源赋存条件",{"key":24,"text":221,"correct":22},"地区经济条件",{"key":28,"text":223,"correct":22},"地区交通条件",{"key":31,"text":225,"correct":22},"资源开发的技术水平",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1123654,"国家矿产资源法规定，供矿山建设设计使用的（ ），必须经国务院或省级矿产储量审批机构审查批准；未经批准，不得作为矿山建设的依据。",[230,232,234,236],{"key":20,"text":231,"correct":22},"地质资料",{"key":24,"text":233,"correct":26},"勘查报告",{"key":28,"text":235,"correct":22},"设计规范",{"key":31,"text":237,"correct":22},"技术规范",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1123655,"不能独立发挥生产能力或效益，但具有独立施工条件并能形成独立使用功能的单元为（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"单项工程",{"key":24,"text":245,"correct":26},"单位工程",{"key":28,"text":247,"correct":22},"分部工程",{"key":31,"text":249,"correct":22},"分项工程",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1123656,"根据是否具有独立生产功能和独立施工条件，以及预算和结算的条件的不同，矿业工程项目一般划分为（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":26},"单项工程、单位工程和分部、分项工程",{"key":24,"text":257,"correct":22},"矿井建设工程与矿山开采工程",{"key":28,"text":259,"correct":22},"地面工程与地下工程",{"key":31,"text":261,"correct":22},"矿建工程、土建工程和机电安装工程",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},1123657,"进行矿山建设设计、实现矿山工程项目和矿产资源开采的前提条件是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"技术措施的选用",{"key":24,"text":269,"correct":22},"技术方案",{"key":28,"text":271,"correct":26},"资源的勘探",{"key":31,"text":273,"correct":22},"审批机构的审查批准",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},1123658,"矿山建设工程中，决定地面生产系统布局和影响施工设施布局的主要是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"施工方案",{"key":24,"text":281,"correct":22},"土建工程",{"key":28,"text":283,"correct":22},"大型施工设备的安装工程",{"key":31,"text":285,"correct":26},"地下生产系统",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":28,"analysis":33},1123659,"矿业工程项目在进行施工现场准备时，关于需要完成的任务，说法不正确的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"做好施工场地的控制网测量施测工作",{"key":24,"text":293,"correct":22},"平整工业广场，清除障碍物",{"key":28,"text":295,"correct":26},"完成“三通一平”工作",{"key":31,"text":297,"correct":22},"提出设备、机具、材料进场计划，并组织施工机具进场、组装和保养工作",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1123660,"当主、副井井筒到底进行短路贯通后，井底车场施工可全面展开，这时的通风工作比较困难。一般情况下，巷道串联通风的工作面数最多（ ）。超过时，各工作面爆破顺序必须先里后外进行，人员应同时全部撤出。",[302,304,306,308],{"key":20,"text":303,"correct":22},"不得超过2个",{"key":24,"text":305,"correct":26},"不得超过3个",{"key":28,"text":307,"correct":22},"不得超过4个",{"key":31,"text":309,"correct":22},"不得超过5个",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1123661,"矿业工程项目施工图设计是按（ ）编制的，是指导施工的依据。",[314,315,316,317],{"key":20,"text":243,"correct":22},{"key":24,"text":245,"correct":26},{"key":28,"text":249,"correct":22},{"key":31,"text":247,"correct":22},{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},1123662,"当矿井工业场地布置有主、副井两个井筒时，对于井筒的施工顺序，我国多采用（ ）的方式。",[322,324,326,328],{"key":20,"text":323,"correct":26},"主井比副井先开工",{"key":24,"text":325,"correct":22},"副井比主井先开工",{"key":28,"text":327,"correct":22},"主井与副井同时开工",{"key":31,"text":329,"correct":22},"主井与副井交替开工",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":28,"analysis":33},1123663,"矿井项目的施工准备阶段，一般应以安排（ ）为主。",[334,336,338,340],{"key":20,"text":335,"correct":22},"地面永久工程准备",{"key":24,"text":337,"correct":22},"矿井工业广场购地",{"key":28,"text":339,"correct":26},"井筒开工准备",{"key":31,"text":341,"correct":22},"矿井永久安装工程准备",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},1123664,"凿井提升机房的位置，须根据提升机型式、数量、井架高度以及提升钢丝绳的倾角、偏角等来确定，布置时应避开（ ），并考虑提升方位与永久提升方位的关系，使之能适应井筒开凿、平巷开拓、井筒装备各阶段提升的需要。",[346,348,350,352],{"key":20,"text":347,"correct":26},"永久建筑物的位置",{"key":24,"text":349,"correct":22},"临时提升机的位置",{"key":28,"text":351,"correct":22},"凿井绞车的位置",{"key":31,"text":353,"correct":22},"井口房的位置",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":28,"analysis":33},1123665,"按矿山建设基本程序，矿井项目最后要完成的工作是（ ）",[358,360,362,364],{"key":20,"text":359,"correct":22},"竣工验收",{"key":24,"text":361,"correct":22},"交付使用",{"key":28,"text":363,"correct":26},"项目后期评估",{"key":31,"text":365,"correct":22},"生产准备",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":31,"analysis":33},1123666,"煤矿井下并行轨道大巷和运输大巷长距离掘进时,优先采用的通风方案是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"大功率风机压人式通风",{"key":24,"text":373,"correct":22},"大功率风机抽出式通风",{"key":28,"text":375,"correct":22},"双巷据进混合式通风",{"key":31,"text":377,"correct":26},"双巷掘进压入式通风",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1123667,"有关井筒施工顺序的说法错误的是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"位于主要矛盾线上的风井井筒，与主、副井同时或稍后于主、副井开工为好",{"key":24,"text":385,"correct":26},"非主要矛盾线上的风井井筒，开工时间可适当提前",{"key":28,"text":387,"correct":22},"各风井井筒的开工间隔时间应控制在3～6个月",{"key":31,"text":389,"correct":22},"风井比主、副井提前开工的方案一般是不可取的",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},1123668,"矿业工程施工的技术准备工作主要包括掌握施工要求与检查施工条件、掌握与会审施工图纸以及（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"五通一平",{"key":24,"text":397,"correct":26},"编制施工组织设计及相关工作",{"key":28,"text":399,"correct":22},"技术交底和技术培训工作",{"key":31,"text":401,"correct":22},"及时完成施工图纸的收集和整理",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":28,"analysis":33},1123669,"某矿建公司通过招投标方式承担立井井筒的施工任务，工期为18个月。为了在18个月内完成施工任务，该矿建公司应（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"增加大型施工设备",{"key":24,"text":409,"correct":22},"大量增加工作面的施工人员",{"key":28,"text":411,"correct":26},"狠抓关键工程的施工",{"key":31,"text":413,"correct":22},"狠抓所有工程的施工",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},1123670,"矿业工程施工的技术准备中，关于施工图工作的说法，正确的是要求（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"检查地质条件图纸是否满足工程施工要求，否则应更换图纸",{"key":24,"text":421,"correct":22},"掌握施工对工程地质条件的影响",{"key":28,"text":423,"correct":22},"检查图纸的完整、齐全性就是检查其套数",{"key":31,"text":425,"correct":26},"根据图纸标定的坐标确定建筑物位置，并检查其正确性",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},1123671,"矿业工程项目施工总进度安排时，一般情况下（ ）是构成矿井工程项目关键路线的关键工程。",[430,432,434,436],{"key":20,"text":431,"correct":22},"井架安装",{"key":24,"text":433,"correct":22},"绞车安装",{"key":28,"text":435,"correct":26},"井筒施工",{"key":31,"text":437,"correct":22},"井筒装备",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":28,"analysis":33},1123672,"与井筒相毗连的各种硐室（马头门、装载硐室等）在一般情况下应与井筒施工（ ），装载硐室的安装应在井筒永久装备施工之前进行。",[442,444,446,448],{"key":20,"text":443,"correct":22},"顺序进行",{"key":24,"text":445,"correct":22},"交替进行",{"key":28,"text":447,"correct":26},"同时进行",{"key":31,"text":449,"correct":22},"分别进行",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},1123673,"对于矿建公司所编制的立井井筒施工组织设计，应吸收建设单位、（ ）参加。",[454,456,458,460],{"key":20,"text":455,"correct":22},"监理单位",{"key":24,"text":457,"correct":26},"设计单位",{"key":28,"text":459,"correct":22},"质监站",{"key":31,"text":461,"correct":22},"安监站",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1123674,"矿业工程项目开工前的准备阶段，为满足招标工作的需要，由（ ）编制矿井施工组织设计，其内容主要是着重于大的施工方案，及总工期总投资概算的安排，一般在大规模开工前6个月完成。",[466,467,469,471],{"key":20,"text":457,"correct":22},{"key":24,"text":468,"correct":26},"建设单位",{"key":28,"text":470,"correct":22},"施工单位",{"key":31,"text":455,"correct":22},{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":31,"analysis":33},1123675,"单位工程施工组织设计（ ）。",[476,478,480,482],{"key":20,"text":477,"correct":22},"可以在工程项目实施过程中编制",{"key":24,"text":479,"correct":22},"的主要内容是施工技术",{"key":28,"text":481,"correct":22},"的主要内容是施工安排",{"key":31,"text":483,"correct":26},"是技术与经济相结合的文件",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},1123676,"施工组织设计必须依据经批准的地质报告和（ ）进行编制。",[488,490,492,494],{"key":20,"text":489,"correct":22},"监理规划",{"key":24,"text":491,"correct":22},"监理细则",{"key":28,"text":493,"correct":22},"开工报告",{"key":31,"text":495,"correct":26},"井筒检查孔的地质与水文资料",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},1123677,"矿井建设期间为综合平衡的“四个排队”中，规模、影响、范围最大是（ ）的排队。",[500,502,504,506],{"key":20,"text":501,"correct":26},"矿建、土建和机电设备安装工程间",{"key":24,"text":503,"correct":22},"设备间",{"key":28,"text":505,"correct":22},"年度计划与季度计划",{"key":31,"text":507,"correct":22},"多工序间",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},1123678,"有关民用爆炸物品运输的正确做法是（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":26},"运输车辆按照规定悬挂或者安装符合国家标准的易燃易爆危险物品警示标志",{"key":24,"text":515,"correct":22},"运输车辆装载民用爆炸物品时还可以载人，但必须有安全保护装置",{"key":28,"text":517,"correct":22},"运输车辆应按预定的路线行驶，可以在村镇附近停留",{"key":31,"text":519,"correct":22},"运输车辆的行驶速度不得超过80km／h",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},1123679,"爆破器材存储仓库的库房内（ ）住宿。",[524,526,528,530],{"key":20,"text":525,"correct":22},"一般不可",{"key":24,"text":527,"correct":22},"严禁不相关人员",{"key":28,"text":529,"correct":22},"不能",{"key":31,"text":531,"correct":26},"严禁",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},1123680,"销售民用爆炸物品的企业，应当自民用爆炸物品买卖成交之日起（ ）日内，将销售的品种、数量和购买单位向所在地省、自治区、直辖市人民政府国防科技工业主管部门和所在地县级人民政府公安机关备案。",[536,538,540,542],{"key":20,"text":537,"correct":22},"2",{"key":24,"text":539,"correct":26},"3",{"key":28,"text":541,"correct":22},"5",{"key":31,"text":543,"correct":22},"10",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":28,"analysis":33},1123681,"关于民用爆炸物品储存的说法,错误的是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":22},"爆炸物品应当储存在专用仓库内",{"key":24,"text":551,"correct":22},"爆炸物品储存仓库禁止存放其他物品",{"key":28,"text":553,"correct":26},"过期失效的爆炸物品应及时清理并自行销毁",{"key":31,"text":555,"correct":22},"爆炸物品发生丢失应当立即报告当地公安机关",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":28,"analysis":33},1123682,"井下放炮，应使用（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":22},"照明电源起爆",{"key":24,"text":563,"correct":22},"动力电源起爆",{"key":28,"text":565,"correct":26},"防爆型发爆器",{"key":31,"text":567,"correct":22},"照明或动力电源起爆",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},1123683,"爆破作业单位跨省、自治区、直辖市行政区域从事爆破作业的，应当事先将爆破作业项目的有关情况向（ ）所在地县级人民政府公安机关报告。",[572,574,576,578],{"key":20,"text":573,"correct":22},"爆破作业单位",{"key":24,"text":575,"correct":26},"爆破施工作业",{"key":28,"text":577,"correct":22},"爆破注册单位",{"key":31,"text":579,"correct":22},"爆破保险单位",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":28,"analysis":33},1123684,"民用爆炸物品销售企业持《民用爆炸物品销售许可证》，到（ ）登记后，方可销售民用爆炸物品。",[584,586,588,590],{"key":20,"text":585,"correct":22},"政府机关",{"key":24,"text":587,"correct":22},"公安部门",{"key":28,"text":589,"correct":26},"工商行政管理部门",{"key":31,"text":591,"correct":22},"税务管理部门",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":28,"analysis":33},1123685,"《民用爆炸物品购买许可证》应当载明许可购买的品种、数量、购买单位以及（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"销售单位",{"key":24,"text":599,"correct":22},"购买时间",{"key":28,"text":601,"correct":26},"有效期限",{"key":31,"text":603,"correct":22},"运输方式",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":20,"analysis":33},1123686,"民用爆炸物品失效、销毁前，应报省级人民政府（ ）。",[608,610,612,614],{"key":20,"text":609,"correct":26},"国防科技工业主管部门",{"key":24,"text":611,"correct":22},"安全监督管理部门",{"key":28,"text":613,"correct":22},"建设行业主管部门",{"key":31,"text":615,"correct":22},"环境保护管理部门",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]