[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,18,50,1681,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,369,381,392,404,416,428,440,452,464,476,488,497,509,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1123586,1,"单选题","关于矿业工程施工索赔性质表述正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","施工索赔主要指业主在承包商施工过程中的索赔行为",false,{"key":24,"text":25,"correct":26},"B","施工索赔是一种要求经济补偿的行为，而不是给对方的惩罚",true,{"key":28,"text":29,"correct":22},"C","施工索赔是合同双方发生的合同管理业务范围外的内容",{"key":31,"text":32,"correct":22},"D","施工索赔是合同双方发生争议的解决方法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1123587,"矿业工程项目建设具有其自身的一系列特点，这些特点往往也是引起索赔的因素，通常矿业工程（ ）因素不会引起索赔。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目的性质",{"key":24,"text":41,"correct":22},"项目的内容",{"key":28,"text":43,"correct":26},"项目的大小",{"key":31,"text":45,"correct":22},"项目的环境",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1123588,"矿业工程施工中，关于索赔与变更的不正确表述是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"索赔和变更都处理原合同上没有的内容或没有正常执行的内容",{"key":24,"text":53,"correct":22},"变更通常是在施工前或施工过程中，索赔通常是在施工过程甚至更晚的时候",{"key":28,"text":55,"correct":22},"变更可能引起索赔，但不是一定引起索赔",{"key":31,"text":57,"correct":26},"索赔和变更总是同时发生和存在的",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1123589,"某矿建公司通过招投标方式承担了立井井筒的施工任务，因工期紧，建设单位在进场道路尚未全面完成的情况下即要求该矿建公司进场施工。该矿建公司为了进场方便，在建设单位的指令下支出30万元完善了进场道路，矿建公司支出的30万元应由（ ）承担。",[62,64,66,68],{"key":20,"text":63,"correct":22},"矿建公司",{"key":24,"text":65,"correct":26},"建设单位",{"key":28,"text":67,"correct":22},"当地政府",{"key":31,"text":69,"correct":22},"矿建公司和建设单位共同",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1123590,"下列关于矿业工程量变更计算的规定中，表述错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"工程量清单漏项或由于设计变更引起的新的工程量清单项目，其相应综合单价由承包方提出，经发包方确认后作为结算的依据",{"key":24,"text":77,"correct":22},"由于设计变更引起工程量增减部分，属于合同约定幅度以内的，应执行原有的综合单价",{"key":28,"text":79,"correct":22},"增减工程量属于合同约定幅度以外的，其综合单价由承包人提出，经发包人确认以后作为结算的依据",{"key":31,"text":81,"correct":26},"由于工程量的变更，且实际发生了规定以外的费用损失，承包人不可提出索赔要求",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1123591,"矿业工程施工合同变更的范围或要求包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"合同中特定工作工程量的改变",{"key":24,"text":89,"correct":22},"不得改变施工顺序或时间安排",{"key":28,"text":91,"correct":26},"工程的质量或相关特性的变更",{"key":31,"text":93,"correct":22},"不得删减合同约定的工作内容",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1123592,"施工合同文件通常由①合同协议书；②中标通知书；③投标函及其附录；④专用合同条款及其附件；⑤通用合同条款等组成，其解释顺序是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"⑤-④-③-②-①",{"key":24,"text":101,"correct":26},"①-②-③-④-⑤",{"key":28,"text":103,"correct":22},"④-③-②-①-⑤",{"key":31,"text":105,"correct":22},"⑤-④-①-②-③",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1123593,"《合同法》规定，经过当事人协商一致，可以变更合同。按照（ ）的要求，变更合同还应依据法律、行政法规的规定办理手续。",[110,112,114,116],{"key":20,"text":111,"correct":22},"《合同法》规定",{"key":24,"text":113,"correct":22},"合同签订",{"key":28,"text":115,"correct":22},"法律规定",{"key":31,"text":117,"correct":26},"行政法规",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1123594,"矿业工程在颁发工程接受证书前的（ ），业主（监理工程师）可以发布变更指示或以要求承包商递交建议书的任何一种方式提出变更。",[122,124,126,128],{"key":20,"text":123,"correct":22},"1个月内",{"key":24,"text":125,"correct":22},"半年内",{"key":28,"text":127,"correct":22},"1年内",{"key":31,"text":129,"correct":26},"任何时间",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1123595,"计算变更工程应采用的费率或价格，如果实施变更工作未导致工程施工组织和施工方法发生实质性变动，（ ）该项目的单价。",[134,136,138,140],{"key":20,"text":135,"correct":22},"局部调整",{"key":24,"text":137,"correct":22},"全部调整",{"key":28,"text":139,"correct":22},"重新确定",{"key":31,"text":141,"correct":26},"不应调整",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1123596,"矿业工程施工承包人在工程变更确定后（ ）内，提出变更工程价款的报告，经工程师确认后调整合同价款，否则，视为该项变更不涉及合同价款的变更。",[146,148,150,152],{"key":20,"text":147,"correct":22},"7d",{"key":24,"text":149,"correct":26},"14d",{"key":28,"text":151,"correct":22},"28d",{"key":31,"text":153,"correct":22},"30d",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1123597,"矿业工程施工索赔的证据，应该包括事情的全过程和事情的方方面面。可作为常用证据的材料一般不包括（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"法律关系的证明材料",{"key":24,"text":161,"correct":22},"规范、标准及技术资料",{"key":28,"text":163,"correct":26},"事件发生的时间和地点",{"key":31,"text":165,"correct":22},"事件经过的相关证明",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1123598,"一承包商承揽了一井筒的施工任务，施工准备由承包商负责，业主协助，施工中发生的（ ）事件承包商可以向业主进行索赔。",[170,172,174,176],{"key":20,"text":171,"correct":22},"井口场地未进行平整而无法竖立井架",{"key":24,"text":173,"correct":22},"施工人员技术水平低而延误进度",{"key":28,"text":175,"correct":22},"施工设备没有及时进场而延误开工",{"key":31,"text":177,"correct":26},"施工图纸不能及时提供而延误施工",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1123599,"分包人在履行分包合同时，应只服从（ ）指令。",[182,184,186,188],{"key":20,"text":183,"correct":26},"承包人",{"key":24,"text":185,"correct":22},"发包人",{"key":28,"text":187,"correct":22},"监理工程师",{"key":31,"text":189,"correct":22},"设计单位",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1123600,"某工程施工过程中遭受山体滑坡，事故给已建分部工程造成破坏，损失总计18万元人民币，应（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"由业主承担修复的经济责任",{"key":24,"text":197,"correct":22},"由施工单位承担修复的经济责任",{"key":28,"text":199,"correct":22},"由双方共同承担修复的经济责任",{"key":31,"text":201,"correct":22},"根据合同判断修复的责任。",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1123601,"关于不可抗力事件中，施工单位进场的机械、设备受到损坏以及工期的损失，说法正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"机械设备损失由业主承担，工期不顺延",{"key":24,"text":209,"correct":22},"机械设备损失由业主承担，工期顺延",{"key":28,"text":211,"correct":26},"机械设备损失由施工单位承担，工期顺延",{"key":31,"text":213,"correct":22},"机械设备损失由施工单位承担，工期不顺延",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1123602,"矿业工程安全事故应急预案的应急准备工作不包含（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"应急救援组织机构设置",{"key":24,"text":221,"correct":26},"应急预案编制",{"key":28,"text":223,"correct":22},"应急资源的配备",{"key":31,"text":225,"correct":22},"教育、训练与演练",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1123603,"罐笼提升中，不符合安全要求的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"立井升降人员应使用罐笼或带乘人用的箕斗",{"key":24,"text":233,"correct":22},"罐笼或罐帘的高度应大于1.2m",{"key":28,"text":235,"correct":22},"升降人员的罐笼地步应满铺钢板",{"key":31,"text":237,"correct":26},"立井采用罐笼升降人员时的速度不得超过斜井提人的速度",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1123604,"安全事故应急预案中，应急准备工作内容应包括做好（ ）工作。",[242,244,246,248],{"key":20,"text":243,"correct":22},"危险区的隔离",{"key":24,"text":245,"correct":26},"应急资源安排",{"key":28,"text":247,"correct":22},"事故控制措施的落实",{"key":31,"text":249,"correct":22},"应急人员安全防护",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1123605,"矿井瓦斯爆炸辨识是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"矿井风量满足井下各个作业点的施工需要，但每人每分钟少于6m3",{"key":24,"text":257,"correct":22},"在采掘工作面进风风流中，按体积浓度计算，氧气低于25％",{"key":28,"text":259,"correct":22},"矿井采取轴流机械通风",{"key":31,"text":261,"correct":26},"井下爆破未使用煤矿安全炸药和安全电雷管",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1123606,"瓦斯浓度超过（ ）时禁止爆破施工。",[266,268,270,272],{"key":20,"text":267,"correct":22},"0．1％",{"key":24,"text":269,"correct":22},"0．2％",{"key":28,"text":271,"correct":22},"0．5％",{"key":31,"text":273,"correct":26},"1．0％",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},1123607,"矿业工程职业安全健康管理体系中最重要的要素是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":26},"领导的承诺与责任",{"key":24,"text":281,"correct":22},"员工参与",{"key":28,"text":283,"correct":22},"危害辨识与风险评价",{"key":31,"text":285,"correct":22},"持续改进",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1123608,"矿井瓦斯积聚是指局部空间的瓦斯浓度达到（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"1％",{"key":24,"text":293,"correct":26},"2％",{"key":28,"text":295,"correct":22},"3％",{"key":31,"text":297,"correct":22},"5％",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1123609,"矿井巷道工作面底板灰岩含水层突水征兆是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"工作面压力增大，顶板严重下沉",{"key":24,"text":305,"correct":26},"工作面底板产生裂隙，并逐渐增大",{"key":28,"text":307,"correct":22},"工作面发潮、滴水，水中含有少量细砂",{"key":31,"text":309,"correct":22},"工作面岩壁变松，并发生片帮",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1123610,"对于有自然发火、瓦斯突出、瓦斯煤尘爆炸危险的矿井，下井人员必须（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"佩戴保险带",{"key":24,"text":317,"correct":26},"携带自救器",{"key":28,"text":319,"correct":22},"戴防尘口罩",{"key":31,"text":321,"correct":22},"配置灭火器",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},1123611,"井口房和通风机房附近（ ）m内，不得有烟火或用火炉取暖。",[326,328,330,332],{"key":20,"text":327,"correct":22},"10",{"key":24,"text":329,"correct":26},"20",{"key":28,"text":331,"correct":22},"30",{"key":31,"text":333,"correct":22},"40",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1123612,"矿山老空区的积水和淤泥，往往会对（ ）产生危害。",[338,340,342,344],{"key":20,"text":339,"correct":22},"施工中的井筒",{"key":24,"text":341,"correct":26},"矿井井下",{"key":28,"text":343,"correct":22},"工业广场或生活区",{"key":31,"text":345,"correct":22},"矿井地面生产的原则指导和组织井巷掘进施工",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":28,"analysis":33},1123613,"矿山采掘工作面的进风流中，氧气浓度不低于（ ），二氧化碳浓度不超过（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"30％，2．0％",{"key":24,"text":353,"correct":22},"25％，1.0％",{"key":28,"text":355,"correct":26},"20％，0．5％",{"key":31,"text":357,"correct":22},"15％，0．2％",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},1123614,"井下作业场所空气粉尘中游离SiO2。含量超过10％时，总粉尘的最高允许浓度不得大于（ ）mg／m3。",[362,364,366,368],{"key":20,"text":363,"correct":26},"1",{"key":24,"text":365,"correct":22},"2",{"key":28,"text":367,"correct":22},"5",{"key":31,"text":327,"correct":22},{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":31,"analysis":33},1123615,"矿业工程施工安全管理的基本制度不包括（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"安全生产责任制",{"key":24,"text":376,"correct":22},"安全技术教育与培训",{"key":28,"text":378,"correct":22},"安全检查制度",{"key":31,"text":380,"correct":26},"安全事故责任制",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":28,"analysis":33},1123616,"矿业工程施工安全管理的基本要求是要建立健全以（ ）为核心的各项安全生产规章制度，落实各部门、各岗位在安全生产中的责任和奖惩办法。",[385,387,389,390],{"key":20,"text":386,"correct":22},"企业安全生产",{"key":24,"text":388,"correct":22},"企业经济利益",{"key":28,"text":374,"correct":26},{"key":31,"text":391,"correct":22},"安全生产管理",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":31,"analysis":33},1123617,"矿山水害的防治必须坚持（ ）的原则。",[396,398,400,402],{"key":20,"text":397,"correct":22},"配足排水设备",{"key":24,"text":399,"correct":22},"边探边掘",{"key":28,"text":401,"correct":22},"保证水沟畅通",{"key":31,"text":403,"correct":26},"先探后掘",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},1123618,"有关矿井火灾预防措施,说法不正确的是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":22},"制定严格的防火制度",{"key":24,"text":411,"correct":26},"采用不燃建筑材料是避免工程火灾的关键",{"key":28,"text":413,"correct":22},"遵守安全规章制度,加强日常的管理与检查",{"key":31,"text":415,"correct":22},"加强防备工作,正确选择和按规定配备必要的消防设备",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":28,"analysis":33},1123619,"矿井防止瓦斯引燃引爆必须加强放炮和火工品管理，采掘工作面放炮必须使用取得产品许可证的煤矿许用炸药和煤矿许用电雷管，且最后一段的延期时间不得超过（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"100ms",{"key":24,"text":423,"correct":22},"120ms",{"key":28,"text":425,"correct":26},"130ms",{"key":31,"text":427,"correct":22},"180ms",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},1123620,"现阶段矿井火灾的灭火技术主要有灌浆灭火、均压灭火、阻化灭火、惰气压注灭火以及新型的凝胶灭火、泡沫灭火等技术手段。而传统的（ ）还是矿井经常采用的技术。",[432,434,436,438],{"key":20,"text":433,"correct":22},"洒水灭火",{"key":24,"text":435,"correct":22},"C02灭火",{"key":28,"text":437,"correct":22},"反风灭火",{"key":31,"text":439,"correct":26},"火区密封技术",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},1123621,"矿山工程伤亡事故发生后的首要工作是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":26},"抢救伤员和现场保护",{"key":24,"text":447,"correct":22},"组织调查组",{"key":28,"text":449,"correct":22},"进行事故调查",{"key":31,"text":451,"correct":22},"进行现场勘察",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":31,"analysis":33},1123622,"重大死亡事故调查组人员可邀请（ ）参加。",[456,458,460,462],{"key":20,"text":457,"correct":22},"公安部门",{"key":24,"text":459,"correct":22},"监察部门",{"key":28,"text":461,"correct":22},"检察部门",{"key":31,"text":463,"correct":26},"有关专家",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":28,"analysis":33},1123623,"职业安全健康管理体系的评价可分为三个层次，其中（ ）是体系成功运行的必备要素。",[468,470,472,474],{"key":20,"text":469,"correct":22},"绩效测量与监测",{"key":24,"text":471,"correct":22},"审核",{"key":28,"text":473,"correct":26},"管理评审",{"key":31,"text":475,"correct":22},"复核",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},1123624,"临时停工地点不得停风，否则必须做到（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":22},"切断电源并向调度室汇报",{"key":24,"text":483,"correct":22},"悬挂警戒牌，禁止人员入内",{"key":28,"text":485,"correct":26},"切断电源、设置栅栏、悬挂警戒牌、禁止人员入内并向矿调度室汇报",{"key":31,"text":487,"correct":22},"悬挂警戒牌、切断电源、设置栏杆",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},1123625,"矿山井巷防尘工作要求，凿岩、出渣前应清洗工作面（ ）m内的岩壁。进风道、人行道及运输巷道的岩壁，应每季至少清洗一次。",[492,493,494,495],{"key":20,"text":327,"correct":26},{"key":24,"text":329,"correct":22},{"key":28,"text":331,"correct":22},{"key":31,"text":496,"correct":22},"50",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":31,"analysis":33},1123626,"矿井水害的预防与控制措施应坚持（ ）",[501,503,505,507],{"key":20,"text":502,"correct":22},"排水为主，堵水为辅",{"key":24,"text":504,"correct":22},"探水为主，排水为辅",{"key":28,"text":506,"correct":22},"避水为主，堵水为辅",{"key":31,"text":508,"correct":26},"有疑必探，先探后掘",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},1123627,"矿井提升运输系统管理应建立完善的机房管理制度，对于提升连接装置应有探伤报告和（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"检查记录",{"key":24,"text":516,"correct":26},"罐笼防坠试验报告",{"key":28,"text":518,"correct":22},"监测报告",{"key":31,"text":520,"correct":22},"应急措施",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":28,"analysis":33},1123628,"矿山地面建筑工程文明施工要做到（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"施工设备必须有专人看管",{"key":24,"text":528,"correct":22},"废石运输时要密闭或覆盖",{"key":28,"text":530,"correct":26},"操作地点和周围必须清洁整齐",{"key":31,"text":532,"correct":22},"电力线路悬挂高度必须2m以上",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},1123629,"矿业工程施工现场技术管理要求矿山施工现场应有矿井地质、水文地质报告，（ ）等资料必须经过会审并有记录。",[537,539,541,543],{"key":20,"text":538,"correct":22},"地质报告",{"key":24,"text":540,"correct":26},"施工图纸",{"key":28,"text":542,"correct":22},"施工组织",{"key":31,"text":544,"correct":22},"施工措施",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":28,"analysis":33},1123630,"核设施营运单位、核技术利用单位、铀（钍）矿和伴生放射性矿开发利用单位，应当合理选择和利用原材料，采用先进的生产工艺和设备，（ ）放射性废物的产生量。",[549,551,553,555],{"key":20,"text":550,"correct":22},"减少",{"key":24,"text":552,"correct":22},"限制",{"key":28,"text":554,"correct":26},"尽量减少",{"key":31,"text":556,"correct":22},"杜绝",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":28,"analysis":33},1123631,"矿山工程施工调度应遵循的主要原则是（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"重点工程服从于一般工程",{"key":24,"text":564,"correct":22},"复杂工程服从于简单工程",{"key":28,"text":566,"correct":26},"安全第一，生产第二",{"key":31,"text":568,"correct":22},"质量第一，生产第二",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":31,"analysis":33},1123632,"矿山施工调度工作的作用不涉及（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"通过调度工作及时解决施工中已发生的各种问题",{"key":24,"text":576,"correct":22},"通过调度工作来预防可能发生的问题",{"key":28,"text":578,"correct":22},"通过调度工作对作业计划不准确的地方给予补充",{"key":31,"text":580,"correct":26},"通过调度工作不断调整劳动力的分配",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":24,"analysis":33},1123633,"矿山的剥离物、废石、表土及尾矿等，必须运往废石场堆置排弃或采取综合利用措施，（ ）江河、湖泊、水库和废石场以外的沟渠倾倒。",[585,587,589,591],{"key":20,"text":586,"correct":22},"不得已可向",{"key":24,"text":588,"correct":26},"不得向",{"key":28,"text":590,"correct":22},"在无人区可向",{"key":31,"text":592,"correct":22},"可向",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":28,"analysis":33},1123634,"排土场必须分期进行（ ），如排土场有可能发生滑坡和泥石流等灾害的，必须进行稳定处理。",[597,599,601,603],{"key":20,"text":598,"correct":22},"渣土堆放",{"key":24,"text":600,"correct":22},"表面封闭",{"key":28,"text":602,"correct":26},"覆土植被",{"key":31,"text":604,"correct":22},"安全防护",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":31,"analysis":33},1123635,"矿业工程建设时，前期的环境保护措施工作不正确的是（ ）。",[609,611,613,615],{"key":20,"text":610,"correct":22},"优化与环境相关的矿井主体工程设计",{"key":24,"text":612,"correct":22},"矿区地面布置设计考虑功能化分区",{"key":28,"text":614,"correct":22},"对环境保护工程严格执行“三同时”政策",{"key":31,"text":616,"correct":26},"作好个人防护工作，项目开工前劳动防护用品应全部发出",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]