[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,17,50,1681,[13,34,46,58,70,82,94,106,116,128,140,152,164,173,185,197,209,221,233,245,256,268,280,292,303,315,327,339,351,363,374,386,398,410,422,433,445,453,465,477,489,501,513,525,536,546,558,569,581,593],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1123535,1,"单选题","耐火材料的检验项目是（ ）以及吸水率、重烧线收缩、荷重软化温度等。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","抗折强度、耐火度、抗压强度",false,{"key":24,"text":25,"correct":26},"B","表观密度、耐火度、抗压强度",true,{"key":28,"text":29,"correct":22},"C","表观密度、耐火度、抗剪强度",{"key":31,"text":32,"correct":22},"D","表观密度、导热度、抗剪强度","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1123536,"水泥土墙施工后应根据设计要求取样进行（ ）试验。",[38,40,42,44],{"key":20,"text":39,"correct":26},"单轴抗压强度",{"key":24,"text":41,"correct":22},"劈裂抗拉强度",{"key":28,"text":43,"correct":22},"静力受压弹性模量",{"key":31,"text":45,"correct":22},"疲劳性能",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1123537,"深基坑支护水泥土桩应在施工后（ ）进行开挖检查或采用钻孔取芯等手段检查成桩质量，若不符合设计要求应及时调整施工工艺。",[50,52,54,56],{"key":20,"text":51,"correct":26},"一周内",{"key":24,"text":53,"correct":22},"十天内",{"key":28,"text":55,"correct":22},"半月内",{"key":31,"text":57,"correct":22},"一月内",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1123538,"混凝土灌注桩质量检测，当采用低应变动测法检测桩身完整性时，检测数量不宜少于总桩数的（ ），且不得少于5根。",[62,64,66,68],{"key":20,"text":63,"correct":22},"1％",{"key":24,"text":65,"correct":22},"3％",{"key":28,"text":67,"correct":22},"5％",{"key":31,"text":69,"correct":26},"10％",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1123539,"地下连续墙宜采用（ ）法检测其墙身结构质量。",[74,76,78,80],{"key":20,"text":75,"correct":22},"射线透视",{"key":24,"text":77,"correct":26},"声波透射",{"key":28,"text":79,"correct":22},"超声探伤",{"key":31,"text":81,"correct":22},"断开试验",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1123540,"排桩宜采取隔桩施工，并应在灌注混凝土（ ）h后进行邻桩成孔施工。",[86,88,90,92],{"key":20,"text":87,"correct":22},"8",{"key":24,"text":89,"correct":22},"12",{"key":28,"text":91,"correct":26},"24",{"key":31,"text":93,"correct":22},"48",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1123541,"钢支撑预加压力施工中，支撑安装完毕后，应及时检查各节点的连接状况，经确认符合要求后可施加预压力，预压力的施加应在支撑的（ ）进行。",[98,100,102,104],{"key":20,"text":99,"correct":22},"前端",{"key":24,"text":101,"correct":22},"后端",{"key":28,"text":103,"correct":26},"两端同时",{"key":31,"text":105,"correct":22},"两端分别",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1123542,"锚杆施工钻孔的偏斜度不宜大于（ ）。",[110,112,113,114],{"key":20,"text":111,"correct":22},"2％",{"key":24,"text":65,"correct":26},{"key":28,"text":67,"correct":22},{"key":31,"text":115,"correct":22},"7％",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":31,"analysis":33},1123543,"地下连续墙施工前宜进行（ ）试验，确定施工工艺流程，选择操作技术参数。",[120,122,124,126],{"key":20,"text":121,"correct":22},"泥浆配合比",{"key":24,"text":123,"correct":22},"混凝土配合比",{"key":28,"text":125,"correct":22},"槽壁稳定性",{"key":31,"text":127,"correct":26},"墙槽成槽",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},1123544,"石材砌筑时，砂浆饱满度不得小于（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"75％",{"key":24,"text":135,"correct":26},"80％",{"key":28,"text":137,"correct":22},"85％",{"key":31,"text":139,"correct":22},"90％",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":28,"analysis":33},1123545,"砌体工程施工时，对不能同时砌筑而又必须留置的临时间断处应砌成斜槎，斜槎水平投影长度不应小于高度的（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"1／3",{"key":24,"text":147,"correct":22},"1／2",{"key":28,"text":149,"correct":26},"2／3",{"key":31,"text":151,"correct":22},"3／4",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},1123546,"单位工程正式验收时，应由（ ）来组织各有关单位负责人进行单位工程验收。",[156,158,160,162],{"key":20,"text":157,"correct":26},"建设单位负责人",{"key":24,"text":159,"correct":22},"监理工程师",{"key":28,"text":161,"correct":22},"项目经理",{"key":31,"text":163,"correct":22},"造价工程师",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},1123547,"竣工初验收程序，工程竣工报验单应由（ ）签署，并向建设单位提出质量评估报告。",[168,170,171,172],{"key":20,"text":169,"correct":22},"建设单位项目负责人",{"key":24,"text":159,"correct":26},{"key":28,"text":161,"correct":22},{"key":31,"text":163,"correct":22},{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":31,"analysis":33},1123548,"在矿业工程项目质量检验中应优先使用的质量检验方法是（ ）。",[177,179,181,183],{"key":20,"text":178,"correct":22},"抽查",{"key":24,"text":180,"correct":22},"全检",{"key":28,"text":182,"correct":22},"合格证检查",{"key":31,"text":184,"correct":26},"抽样验收检查",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":24,"analysis":33},1123549,"无须列入锚杆质量检验项目内容的是（ ）。",[189,191,193,195],{"key":20,"text":190,"correct":22},"抗拔力",{"key":24,"text":192,"correct":26},"树脂与围岩的粘结力",{"key":28,"text":194,"correct":22},"锚杆杆体材质",{"key":31,"text":196,"correct":22},"托盘密贴岩帮",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":24,"analysis":33},1123550,"下列关于石膏的说法错误的是（ ）。",[201,203,205,207],{"key":20,"text":202,"correct":22},"凝结硬化速度快，凝结时间可调",{"key":24,"text":204,"correct":26},"凝结硬化过程中，体积微有收缩，硬化时会出现裂缝",{"key":28,"text":206,"correct":22},"硬化后，强度较低，表观密度小，隔热、吸声性好",{"key":31,"text":208,"correct":22},"具有良好的装饰性和抗火性",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":24,"analysis":33},1123551,"基坑支撑结构的施工必须严格遵守的原则是（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":22},"边支撑边开挖",{"key":24,"text":216,"correct":26},"先支撑后开挖",{"key":28,"text":218,"correct":22},"两端对称同步支撑",{"key":31,"text":220,"correct":22},"先浅后深分层支撑",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":28,"analysis":33},1123552,"砖砌体的水平灰缝厚度数值合格的是（ ）mm。",[225,227,229,231],{"key":20,"text":226,"correct":22},"3",{"key":24,"text":228,"correct":22},"6",{"key":28,"text":230,"correct":26},"10",{"key":31,"text":232,"correct":22},"15",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":20,"analysis":33},1123553,"材料质量控制的主要内容有：材料的性能、材料取样、试验方法及（ ）等。",[237,239,241,243],{"key":20,"text":238,"correct":26},"材料的质量标准",{"key":24,"text":240,"correct":22},"材料的强度",{"key":28,"text":242,"correct":22},"试验设备",{"key":31,"text":244,"correct":22},"试验人员",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":24,"analysis":33},1123554,"土钉墙质量检查时，墙面喷射混凝土厚度应采用（ ）。",[249,251,253,254],{"key":20,"text":250,"correct":22},"游标卡尺",{"key":24,"text":252,"correct":26},"钻孔检测",{"key":28,"text":75,"correct":22},{"key":31,"text":255,"correct":22},"水压试验",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":28,"analysis":33},1123555,"立井井筒工程验收时，为了检测井壁混凝土的质量，可以在井壁上钻孔取芯测试混凝土的强度，通常钻孔数量（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"不应超过5处",{"key":24,"text":263,"correct":22},"不应超过3处",{"key":28,"text":265,"correct":26},"不应超过2处",{"key":31,"text":267,"correct":22},"不应超过1处",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":20,"analysis":33},1123556,"当建设工程达到竣工条件后，施工单位应在自查、自评工程完成后填写工程竣工报验单，并将全部竣工资料报送（ ），申请竣工验收。",[272,274,276,278],{"key":20,"text":273,"correct":26},"项目监理机构",{"key":24,"text":275,"correct":22},"建设单位主管部门",{"key":28,"text":277,"correct":22},"质量管理部门",{"key":31,"text":279,"correct":22},"建设行政主管部门",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},1123557,"巷道竣工验收时，对于锚喷支护巷道，喷射混凝土厚度应达到设计的要求，局部厚度不得小于（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"设计规定的80％",{"key":24,"text":287,"correct":26},"设计规定的90％",{"key":28,"text":289,"correct":22},"100mm",{"key":31,"text":291,"correct":22},"120mm",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":28,"analysis":33},1123558,"锚杆（索）检测的重要内容是（ ）。",[296,298,300,301],{"key":20,"text":297,"correct":22},"长度",{"key":24,"text":299,"correct":22},"间距",{"key":28,"text":190,"correct":26},{"key":31,"text":302,"correct":22},"外露长度",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":28,"analysis":33},1123559,"井筒竣工验收时要求普通法施工的井筒建成后总漏水量不得大于（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":22},"3m3／h",{"key":24,"text":310,"correct":22},"5m3／h",{"key":28,"text":312,"correct":26},"6m3／h",{"key":31,"text":314,"correct":22},"8m3／h",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":20,"analysis":33},1123561,"按照综合单价法计算，单位工程报价由分部分项工程费、措施项目费、其他项目费、税金和（ ）构成。",[319,321,323,325],{"key":20,"text":320,"correct":26},"规费",{"key":24,"text":322,"correct":22},"利润",{"key":28,"text":324,"correct":22},"企业管理费",{"key":31,"text":326,"correct":22},"保险费",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":20,"analysis":33},1123562,"矿业工程项目的投资由建筑安装工程费、（ ）、工程建设其他费和预备费等组成。",[331,333,335,337],{"key":20,"text":332,"correct":26},"设备及工器具购置费",{"key":24,"text":334,"correct":22},"施工机具使用费",{"key":28,"text":336,"correct":22},"措施费",{"key":31,"text":338,"correct":22},"税金",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":28,"analysis":33},1123563,"下列不属于矿业工程组织措施费中的I临时设施费的为（ ）。",[343,345,347,349],{"key":20,"text":344,"correct":22},"临时宿舍",{"key":24,"text":346,"correct":22},"临时仓库",{"key":28,"text":348,"correct":26},"临时施工所必须的预注浆工程费",{"key":31,"text":350,"correct":22},"临时办公用房",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":24,"analysis":33},1123564,"在现有工程价格资料的基础上，经过分析整理用于编制设计概算的依据是（ ）。",[355,357,359,361],{"key":20,"text":356,"correct":22},"预算定额",{"key":24,"text":358,"correct":26},"概算定额",{"key":28,"text":360,"correct":22},"估算指标",{"key":31,"text":362,"correct":22},"概算指标",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":31,"analysis":33},1123565,"采用定额计价编制标底时，可使用的定额是（ ）。",[367,369,371,373],{"key":20,"text":368,"correct":22},"设计定额",{"key":24,"text":370,"correct":22},"施工定额",{"key":28,"text":372,"correct":22},"结算定额",{"key":31,"text":358,"correct":26},{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":31,"analysis":33},1123566,"根据《建设工程工程量清单计价规范》GB 50500-2013，招标工程量清单的准确性与完整性应由（ ）负责。",[378,380,382,384],{"key":20,"text":379,"correct":22},"投标人",{"key":24,"text":381,"correct":22},"招标人指定的招标代理机构",{"key":28,"text":383,"correct":22},"招标人的上级部门",{"key":31,"text":385,"correct":26},"招标人",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},1123567,"矿业工程成本管理，不可作为竞争性费用的是（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"二次搬运费",{"key":24,"text":393,"correct":26},"安全文明施工费",{"key":28,"text":395,"correct":22},"冬雨期施工增加费",{"key":31,"text":397,"correct":22},"夜间施工增加费",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},1123568,"下列费用中属于管理费的是（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"工程设备费",{"key":24,"text":405,"correct":26},"劳动保险",{"key":28,"text":407,"correct":22},"工伤保险费",{"key":31,"text":409,"correct":22},"工程排污费",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":20,"analysis":33},1123569,"施工定额是以（ ）为对象编制。",[414,416,418,420],{"key":20,"text":415,"correct":26},"工序",{"key":24,"text":417,"correct":22},"分项",{"key":28,"text":419,"correct":22},"主要分项",{"key":31,"text":421,"correct":22},"项目",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":31,"analysis":33},1123570,"矿业工程建设其他费用中的专业性项目包括有采矿权转让费、井筒地质检查钻探费、探矿权转让费和（ ）。",[426,428,430,431],{"key":20,"text":427,"correct":22},"环境影响评价费用",{"key":24,"text":429,"correct":22},"安全生产评价费",{"key":28,"text":320,"correct":22},{"key":31,"text":432,"correct":26},"维修费",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":20,"analysis":33},1123571,"根据矿山工程造价费用定额现行规定，施工方利用永久建筑工程和设备的费用来源由发包方负责支出的是（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":26},"四通一平工程费用",{"key":24,"text":440,"correct":22},"属于临时设施费范围内的永久工程发生的费用",{"key":28,"text":442,"correct":22},"利用属于直接费项下的永久工程和设备费用",{"key":31,"text":444,"correct":22},"利用永久设备，其费用来源由直接定额中的机械费列支",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":28,"analysis":33},1123572,"在现有工程价格资料的基础上，经过分析整理用于编制项目建议书、可行性研究报告投资估算的依据的是（ ）。",[449,450,451,452],{"key":20,"text":356,"correct":22},{"key":24,"text":358,"correct":22},{"key":28,"text":360,"correct":26},{"key":31,"text":362,"correct":22},{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},1123573,"一般纳税人跨县（市）提供建筑版务,选择适用简易计税方法计税的,应以取得的全部价款和价外费用扣除支付的分包款后的余额为销售额,按照（ ）的征收率计算应纳税额。",[457,459,461,463],{"key":20,"text":458,"correct":26},"3%",{"key":24,"text":460,"correct":22},"5%",{"key":28,"text":462,"correct":22},"2%",{"key":31,"text":464,"correct":22},"11%",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1123574,"根据工程项目实行招投标的规定,下列说法不正确的是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"施工招标可以按照单位工程进行招标",{"key":24,"text":472,"correct":26},"特殊的分部工程可以独立招标",{"key":28,"text":474,"correct":22},"建设单位不得将项目化整为零规避招标",{"key":31,"text":476,"correct":22},"满足招标条件的项目应实现招标",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":28,"analysis":33},1123575,"不属于投标须知文件内容的是（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"资金来源",{"key":24,"text":484,"correct":22},"工程说明",{"key":28,"text":486,"correct":26},"资格审查文件",{"key":31,"text":488,"correct":22},"投标费用",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":28,"analysis":33},1123576,"关于投标报价的技巧，正确的说法是（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"自身任务不足时，愿意承揽的项目报价宜高",{"key":24,"text":496,"correct":22},"地区偏僻的项目成本较低，报价宜低‘",{"key":28,"text":498,"correct":26},"施工技术复杂且风险高的项目，报价宜高",{"key":31,"text":500,"correct":22},"自身有特长且竞争不强时的项目报价宜低",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":20,"analysis":33},1123577,"投标报价可采用的策略是（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":26},"提出改进技术方案",{"key":24,"text":508,"correct":22},"提前递交标书",{"key":28,"text":510,"correct":22},"低于成本价竞标",{"key":31,"text":512,"correct":22},"适当延长工期",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":24,"analysis":33},1123578,"不属于招标文件内容的是（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":22},"招标公告",{"key":24,"text":520,"correct":26},"工程造价",{"key":28,"text":522,"correct":22},"设计图纸",{"key":31,"text":524,"correct":22},"技术条款",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":31,"analysis":33},1123579,"矿业工程项目施工招标条件不需要（ ）。",[529,531,533,534],{"key":20,"text":530,"correct":22},"立项批准",{"key":24,"text":532,"correct":22},"资金落实",{"key":28,"text":522,"correct":22},{"key":31,"text":535,"correct":26},"编制决算",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},1123580,"不属于投标文件组成部分的是（ ）。",[540,541,543,545],{"key":20,"text":486,"correct":22},{"key":24,"text":542,"correct":22},"投标函部分",{"key":28,"text":544,"correct":22},"技术部分",{"key":31,"text":488,"correct":26},{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},1123581,"按照项目实施的先后进行招标的方式称为（ ）。",[550,552,554,556],{"key":20,"text":551,"correct":22},"总承包",{"key":24,"text":553,"correct":26},"阶段承包",{"key":28,"text":555,"correct":22},"分承包",{"key":31,"text":557,"correct":22},"独立承包",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":28,"analysis":33},1123582,"从可行性研究、勘察设计、组织施工、设备订货、职工培训直到竣工验收，全部工作交由一个承包公司完成，这种承包方式称为（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":22},"专项承包",{"key":24,"text":565,"correct":22},"项目承包",{"key":28,"text":567,"correct":26},"项目总承包",{"key":31,"text":553,"correct":22},{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},1123583,"投标书编制时，对投标人的要求是（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"可以根据投标人自身的情况编制投标书",{"key":24,"text":576,"correct":26},"投标人应当参加现场踏勘工作",{"key":28,"text":578,"correct":22},"投标书编制内容可不包含投标报价",{"key":31,"text":580,"correct":22},"主体工程分包要作说明",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":20,"analysis":33},1123584,"业主在确属需要时有权发布变更指示。指示的内容包括详细的变更内容、变更工程量、变更项目的施工技术要求和有关部门文件图纸，以及（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":26},"变更处理的原则",{"key":24,"text":588,"correct":22},"变更费用计算方法",{"key":28,"text":590,"correct":22},"变更工期计算方法",{"key":31,"text":592,"correct":22},"变更合同修改内容",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":24,"analysis":33},1123585,"矿业工程施工合同变更的正确说法是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"合同变更是对失效合同的完善与补充",{"key":24,"text":600,"correct":26},"合同变更需要双方当事人的一致同意",{"key":28,"text":602,"correct":22},"合同变更不具有法律约束力",{"key":31,"text":604,"correct":22},"合同变更可取消原来的债权债务",[606,609,612,615,618,621],{"id":15,"name":607,"category":7,"favorite":608},"领导干部任职前廉政法规知识测试题",92,{"id":610,"name":611,"category":7,"favorite":15},595,"建筑结构与设备",{"id":613,"name":614,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":616,"name":617,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":619,"name":620,"category":7,"favorite":8},534,"BIM工程师",{"id":622,"name":620,"category":7,"favorite":8},535]