[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":593},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,16,50,1681,[13,34,46,58,70,82,94,106,118,130,142,154,164,176,183,195,207,219,231,240,252,264,276,288,300,312,321,333,345,357,369,381,393,405,417,429,441,453,462,474,486,496,504,516,526,534,546,558,570,581],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1123485,1,"单选题","当地质条件复杂且硐室断面特大时，通常采用（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","全断面施工法",false,{"key":24,"text":25,"correct":22},"B","分层施工法",{"key":27,"text":28,"correct":22},"C","分次施工法",{"key":30,"text":31,"correct":32},"D","导硐施工法",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1123486,"某运输大巷长度2500m．半圆拱断面，净段面积15m2，该巷道应当采用（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"全断面施工方法",{"key":24,"text":41,"correct":22},"导硐施工方法",{"key":27,"text":43,"correct":22},"台阶施工方法",{"key":30,"text":45,"correct":22},"分断面施工方法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1123487,"硐室全断面施工法和普通巷道施工法基本相同，硐室全断面施工法一般适用于（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"稳定及整体性好的岩层",{"key":24,"text":53,"correct":22},"稳定性较好岩层",{"key":27,"text":55,"correct":22},"不稳定岩层",{"key":30,"text":57,"correct":22},"完整性岩层",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1123488,"正台阶工作面（下行分层）施工法按照硐室的高度，整个断面可分为2个以上分层，每分层的高度以（ ）m为宜。",[62,64,66,68],{"key":20,"text":63,"correct":22},"1．0～2．0",{"key":24,"text":65,"correct":22},"1．5～2．5",{"key":27,"text":67,"correct":32},"1．8～3．0",{"key":30,"text":69,"correct":22},"2．0～4．0",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1123489,"采用正台阶工作面工法的上分层超前距离过大时,易出现的施工问题是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"上分层钻眼困难",{"key":24,"text":77,"correct":22},"工作面支护图难",{"key":27,"text":79,"correct":32},"上分层出矸因难",{"key":30,"text":81,"correct":22},"工作面爆破困难",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1123490,"当工作面使用凿岩台车打眼时，配套的装岩设备一般宜选用（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"耙斗式装载机",{"key":24,"text":89,"correct":22},"铲斗后卸式装载机",{"key":27,"text":91,"correct":32},"铲斗侧卸式装载机",{"key":30,"text":93,"correct":22},"钻装机",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1123491,"巷道掘进过程中，在规定的时间内，按作业规程、爆破图表和循环图表的规定，以一定的人力和技术设备，保质保量地完成全部工序和工作量，并保证有节奏地、按一定顺序周而复始地进行，称为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"掘进循环作业",{"key":24,"text":101,"correct":32},"正规循环作业",{"key":27,"text":103,"correct":22},"一次成巷",{"key":30,"text":105,"correct":22},"分次成巷",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1123492,"巷道采用上山施工法时，一般不要考虑（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"运输问题",{"key":24,"text":113,"correct":22},"通风问题",{"key":27,"text":115,"correct":32},"排水问题",{"key":30,"text":117,"correct":22},"支护问题",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1123493,"下山掘进钻眼爆破工作中，应特别注意下山的（ ），使其符合设计要求。",[122,124,126,128],{"key":20,"text":123,"correct":32},"坡度",{"key":24,"text":125,"correct":22},"倾斜度",{"key":27,"text":127,"correct":22},"平整度",{"key":30,"text":129,"correct":22},"标高",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1123494,"斜井提升运输时，在斜井井口或下山的上口应安设制造简单、使用安全可靠、便于维修保养的（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"井口调车器",{"key":24,"text":137,"correct":32},"井口阻车器",{"key":27,"text":139,"correct":22},"井口绞车",{"key":30,"text":141,"correct":22},"井口提升机",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1123495,"下列进度控制措施中，属于组织管理措施的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"优选施工方案",{"key":24,"text":149,"correct":22},"采用新技术、新工艺",{"key":27,"text":151,"correct":32},"加强总包与分包单位间的协调工作",{"key":30,"text":153,"correct":22},"编制资源需求计划",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1123496,"某矿施工网络图见图2G320030-1，其中B工作的机动时间为（ ）天。",[158,160,162],{"key":20,"text":159,"correct":32},"10",{"key":24,"text":161,"correct":22},"5",{"key":27,"text":163,"correct":22},"2",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},1123497,"矿业工程进度计划编制的基本程序是（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":32},"调查研究、确定方案、划分工序并估算时间、绘制进度计划图表",{"key":24,"text":171,"correct":22},"调查研究、确定方案、分组编制、总体合成",{"key":27,"text":173,"correct":22},"调查研究、划分项目、确定方案、分组编制、总体合成",{"key":30,"text":175,"correct":22},"调查研究、划分项目、确定方案、划分工序、计算时间、编制计划、审查计划、确定计划",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},1123498,"某矿施工网络图见图2G320030—1，其中B工作的机动时间为（ ）d。",[180,181,182],{"key":20,"text":159,"correct":32},{"key":24,"text":161,"correct":22},{"key":27,"text":163,"correct":22},{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":27,"analysis":33},1123499,"某矿施工网络图见图2G320030—1，则该网络计划的总工期是（ ）d。",[187,189,191,193],{"key":20,"text":188,"correct":22},"80",{"key":24,"text":190,"correct":22},"85",{"key":27,"text":192,"correct":32},"90",{"key":30,"text":194,"correct":22},"95",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":24,"analysis":33},1123500,"矿山工程项目进度控制由于影响因素多，控制技术复杂，因此必须认真进行分析研究和规划，具体表现在（ ）。",[199,201,203,205],{"key":20,"text":200,"correct":22},"矿山工程项目是由矿建、土建和机电安装工程项目构成，在控制上具有相对独立性，有利于实施进度控制",{"key":24,"text":202,"correct":32},"矿山工程项目由多系统组成，这些系统在施工过程中相互关联，相互影响，甚至会制约工程的实际进度",{"key":27,"text":204,"correct":22},"矿山工程项目涉及较多的大型专用设备安装，实施进度控制将对矿山工程投资的时间效益产生不利的影响",{"key":30,"text":206,"correct":22},"矿山工程施工条件十分复杂，需要采用科学的方法来进行进度控制并不断调整工期，争取早日发挥经济效益",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":27,"analysis":33},1123501,"矿业工程进度控制必须要优选施工方案，下列优选施工方案的具体措施不正确的是（ ）。",[211,213,215,217],{"key":20,"text":212,"correct":22},"根据实际情况，综合分析、全面衡量，缩短井巷工程关键线路的工程量",{"key":24,"text":214,"correct":22},"在制定各单位工程施工技术方案时，必须充分考虑自然条件",{"key":27,"text":216,"correct":32},"井巷工程关键路线贯通掘进，以主、副井方向开拓为主，风井为辅",{"key":30,"text":218,"correct":22},"采用的施工工艺、施工装备，要进行方案对比",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":20,"analysis":33},1123502,"矿山工程进度拖延的事后控制措施最关键的是（ ）。",[223,225,227,229],{"key":20,"text":224,"correct":32},"分析进度拖延的原因",{"key":24,"text":226,"correct":22},"投入更多资源加速施工",{"key":27,"text":228,"correct":22},"调整施工合同",{"key":30,"text":230,"correct":22},"修改设计",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":20,"analysis":33},1123503,"工程进度更新的主要工作有（ ）。",[235,237,238,239],{"key":20,"text":236,"correct":32},"分析进度偏差的原因",{"key":24,"text":226,"correct":22},{"key":27,"text":228,"correct":22},{"key":30,"text":230,"correct":22},{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":27,"analysis":33},1123504,"矿业工程进度计划编制时，对矿山工程施工要特别注意（ ）的施工顺序。",[244,246,248,250],{"key":20,"text":245,"correct":22},"井筒与相互毗连的硐室",{"key":24,"text":247,"correct":22},"关键线路上工程",{"key":27,"text":249,"correct":32},"主、副井井筒交替装备",{"key":30,"text":251,"correct":22},"矿井与土建工程",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":24,"analysis":33},1123505,"矿业工程项目在确立施工进度目标时，施工方案选择的一般要求是工程应有较先进的（ ）。",[256,258,260,262],{"key":20,"text":257,"correct":22},"关键进度指标",{"key":24,"text":259,"correct":32},"平均进度指标",{"key":27,"text":261,"correct":22},"施工技术水平",{"key":30,"text":263,"correct":22},"施工质量目标",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":30,"analysis":33},1123506,"矿业工程施工进度计划编制时，网络计划工作的重点是确定（ ）。",[268,270,272,274],{"key":20,"text":269,"correct":22},"施工方案",{"key":24,"text":271,"correct":22},"施工方法",{"key":27,"text":273,"correct":22},"施工技术",{"key":30,"text":275,"correct":32},"施工顺序",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":27,"analysis":33},1123507,"矿井施工准备工期与矿井竣工工期之和构成矿井建设的总工期，矿井建设的总工期一般可依据（ ）来进行推算。",[280,282,284,286],{"key":20,"text":281,"correct":22},"关键生产系统的施工工期",{"key":24,"text":283,"correct":22},"全部生产系统的安装工期",{"key":27,"text":285,"correct":32},"矿井建设的关键线路工期",{"key":30,"text":287,"correct":22},"全部土建工程的施工工期",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":27,"analysis":33},1123508,"与网络进度计划相比，横道图进度计划的主要特点是（ ）。",[292,294,296,298],{"key":20,"text":293,"correct":22},"能明确反映各项工作之间的逻辑关系",{"key":24,"text":295,"correct":22},"能反映各项工作的机动时间",{"key":27,"text":297,"correct":32},"能直观反映各项工作的开始、完成时间",{"key":30,"text":299,"correct":22},"能正确反映出决定工期的关键工作",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":24,"analysis":33},1123509,"矿井竣工工期（或建井工期）是指从项目正式开工之日起到按照设计规定（ ），并经过试生产，试运转后正式交付生产所经历的时间。",[304,306,308,310],{"key":20,"text":305,"correct":22},"施工人员进场",{"key":24,"text":307,"correct":32},"竣工完成建设工程",{"key":27,"text":309,"correct":22},"开始场内施工准备工作",{"key":30,"text":311,"correct":22},"施工许可证办理完毕",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":24,"analysis":33},1123510,"矿井投产工期是指从（ ）之日起到部分工作面建成，并经试运转，试生产后正式投产所经历的时问。",[316,317,319,320],{"key":20,"text":305,"correct":22},{"key":24,"text":318,"correct":32},"项目正式开工",{"key":27,"text":309,"correct":22},{"key":30,"text":311,"correct":22},{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":30,"analysis":33},1123511,"某立井井筒净直径为6．5m，深度为750m，其中表土段深度为150m，则该井筒表土段应当采用（ ）施工，才能确保井筒的施工安全，并获得可靠的进度指标。",[325,327,329,331],{"key":20,"text":326,"correct":22},"井圈背板普通法",{"key":24,"text":328,"correct":22},"吊挂井壁法",{"key":27,"text":330,"correct":22},"板桩法",{"key":30,"text":332,"correct":32},"冻结法",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":30,"analysis":33},1123512,"在矿山井巷工程中,不应列入关键路线的工程内容,通常是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"主井或副井",{"key":24,"text":340,"correct":22},"主、副井联络巷",{"key":27,"text":342,"correct":22},"井底车场重车线",{"key":30,"text":344,"correct":32},"管子道",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":30,"analysis":33},1123513,"矿山工程项目在进度控制方法上有其自身的特点，下列说法不属于该特点的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"施工顺序明确而限制多，使控制方法难度增加",{"key":24,"text":352,"correct":22},"复杂的环境因素对进度计划影响大，使控制具有不确定性",{"key":27,"text":354,"correct":22},"进度控制手段多，但应用具有限制性",{"key":30,"text":356,"correct":32},"实施单行作业条件好，能减少施工干扰",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1123514,"对进场材料质量控制，要重视材料的（ ），以防错用或使用不合格的材料。",[361,363,365,367],{"key":20,"text":362,"correct":22},"进场验收",{"key":24,"text":364,"correct":32},"使用认证",{"key":27,"text":366,"correct":22},"检验",{"key":30,"text":368,"correct":22},"试验",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":27,"analysis":33},1123515,"矿业工程一般质量事故的事故分析应由（ ）组织。",[373,375,377,379],{"key":20,"text":374,"correct":22},"项目经理",{"key":24,"text":376,"correct":22},"工程处处长",{"key":27,"text":378,"correct":32},"总监理工程师",{"key":30,"text":380,"correct":22},"业主代表",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":27,"analysis":33},1123516,"工序质量的控制，可以简单归纳为（ ）的管理控制循环系统。",[385,387,389,391],{"key":20,"text":386,"correct":22},"实施—检查—处理—总结",{"key":24,"text":388,"correct":22},"实施—检查—归纳—计划",{"key":27,"text":390,"correct":32},"计划—执行—检查—处理",{"key":30,"text":392,"correct":22},"计划—检查—处理—执行",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":20,"analysis":33},1123517,"健全的质量检验制度要求检验工作要从项目开始，即从（ ）开始，到工序检验、最后的竣工验收的每个过程；也包括专职质量检验部门和人员的例行的检验工作，以及矿山工程施工人员的自行的检验规定。",[397,399,401,403],{"key":20,"text":398,"correct":32},"材料、设备订货进场",{"key":24,"text":400,"correct":22},"工序检验",{"key":27,"text":402,"correct":22},"施工人员的自检",{"key":30,"text":404,"correct":22},"专职质量检验部门和人员的检验",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":24,"analysis":33},1123518,"按照《建设工程质量管理条例》的规定，建设工程发生质量事故，有关单位应在（ ）内向当地建设行政主管部门和其他有关部门报告。",[409,411,413,415],{"key":20,"text":410,"correct":22},"8h",{"key":24,"text":412,"correct":32},"24h",{"key":27,"text":414,"correct":22},"48h",{"key":30,"text":416,"correct":22},"1周",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":24,"analysis":33},1123519,"将地面皮带运输走廊选作质量控制点的原因是该工程属于（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"隐蔽工程",{"key":24,"text":424,"correct":32},"关键部位",{"key":27,"text":426,"correct":22},"施工的薄弱环节",{"key":30,"text":428,"correct":22},"采用新技术的部位",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},1123520,"《质量事故处理报告》由（ ）编写，然后提交业主或建设单位，并上报有关主管部门。",[433,435,437,439],{"key":20,"text":434,"correct":22},"甲方代表",{"key":24,"text":436,"correct":32},"监理工程师",{"key":27,"text":438,"correct":22},"施工单位",{"key":30,"text":440,"correct":22},"质检部门",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":20,"analysis":33},1123521,"在工程项目建设过程中，质量控制要贯彻（ ）方针。",[445,447,449,451],{"key":20,"text":446,"correct":32},"预防为主",{"key":24,"text":448,"correct":22},"三阶段控制",{"key":27,"text":450,"correct":22},"百年大计，质量第一",{"key":30,"text":452,"correct":22},"把材料质量控制放在首位",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},1123522,"将巷道锚杆安装设置为施工质量控制点是由于它是工程的（ ）。",[457,458,459,461],{"key":20,"text":424,"correct":22},{"key":24,"text":426,"correct":32},{"key":27,"text":460,"correct":22},"关键施工作业",{"key":30,"text":422,"correct":22},{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1123523,"对工程质量事故进行处理时，首先要进行（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"事故原因分析",{"key":24,"text":469,"correct":32},"事故调查",{"key":27,"text":471,"correct":22},"采取防护措施",{"key":30,"text":473,"correct":22},"上报",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":27,"analysis":33},1123524,"质量事故的性质通常分为（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"一般事故和重大事故",{"key":24,"text":481,"correct":22},"主要事故和非主要事故",{"key":27,"text":483,"correct":32},"责任事故和非责任事故",{"key":30,"text":485,"correct":22},"轻微事故和严重事故",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":27,"analysis":33},1123525,"矿业工程施工阶段质量控制的重点是：施工工艺和（ ）。",[490,491,492,494],{"key":20,"text":271,"correct":22},{"key":24,"text":269,"correct":22},{"key":27,"text":493,"correct":32},"施工工序",{"key":30,"text":495,"correct":22},"技术措施",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":27,"analysis":33},1123526,"将锚杆支护钻孔设置为施工质量控制点是由于它是工程的（ ）。",[500,501,502,503],{"key":20,"text":424,"correct":22},{"key":24,"text":426,"correct":22},{"key":27,"text":460,"correct":32},{"key":30,"text":422,"correct":22},{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":24,"analysis":33},1123527,"在施工阶段工序质量管理的关键是（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"采用合理的技术措施",{"key":24,"text":511,"correct":32},"加强对施工工序的质量控制",{"key":27,"text":513,"correct":22},"采用合理的设计方案",{"key":30,"text":515,"correct":22},"加大质量控制的投入",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":27,"analysis":33},1123528,"“质量事故处理报告”应由（ ）组织编写。",[520,521,523,524],{"key":20,"text":374,"correct":22},{"key":24,"text":522,"correct":22},"项目总工程师",{"key":27,"text":436,"correct":32},{"key":30,"text":525,"correct":22},"质量检验员",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1123529,"工程质量缺陷处理完毕后,“质量事故处理报告”应由（ ）撰写。",[530,531,532,533],{"key":20,"text":380,"correct":22},{"key":24,"text":436,"correct":32},{"key":27,"text":374,"correct":22},{"key":30,"text":440,"correct":22},{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},1123530,"对于混凝土结构工程的施工质量，可以采用（ ）进行检测。",[538,540,542,544],{"key":20,"text":539,"correct":32},"无损检测法",{"key":24,"text":541,"correct":22},"光电法",{"key":27,"text":543,"correct":22},"取芯法",{"key":30,"text":545,"correct":22},"拉拔法",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":20,"analysis":33},1123531,"施工阶段混凝土的质量检验项目主要有坍落度、表观密度和（ ）等。",[550,552,554,556],{"key":20,"text":551,"correct":32},"抗压强度、抗折及抗弯强度",{"key":24,"text":553,"correct":22},"抗剪强度、抗折及抗弯强度",{"key":27,"text":555,"correct":22},"抗压强度、导热系数及抗弯强度",{"key":30,"text":557,"correct":22},"抗压强度、耐火度及抗弯强度",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},1123532,"井巷工程质量抽检时，合格率应达到（ ）以上。",[562,564,566,568],{"key":20,"text":563,"correct":22},"60％",{"key":24,"text":565,"correct":32},"70％",{"key":27,"text":567,"correct":22},"80％",{"key":30,"text":569,"correct":22},"90％",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":27,"analysis":33},1123533,"分部工程质量应由（ ）组织有关单位检验评定。",[574,576,577,579],{"key":20,"text":575,"correct":22},"施工单位负责人",{"key":24,"text":436,"correct":22},{"key":27,"text":578,"correct":32},"建设单位代表",{"key":30,"text":580,"correct":22},"质量管理部门负责人",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":30,"analysis":33},1123534,"材料送检的质量检验方法通常不采用（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"外观检验",{"key":24,"text":588,"correct":22},"理化检验",{"key":27,"text":590,"correct":22},"无损检验",{"key":30,"text":592,"correct":32},"抽样检验",[594,597,600,603,606,609],{"id":15,"name":595,"category":7,"favorite":596},"领导干部任职前廉政法规知识测试题",92,{"id":598,"name":599,"category":7,"favorite":15},595,"建筑结构与设备",{"id":601,"name":602,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":604,"name":605,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":607,"name":608,"category":7,"favorite":8},534,"BIM工程师",{"id":610,"name":608,"category":7,"favorite":8},535]