[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,15,50,1681,[13,34,46,58,70,82,94,106,118,130,142,152,164,176,188,200,212,224,236,248,260,272,284,296,308,320,332,344,356,368,380,392,404,416,428,440,452,464,476,488,500,512,524,535,547,559,571,583,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1123435,1,"单选题","采用冷拉方法调直HRB335级钢筋时，冷拉率不宜大于（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","1％",true,{"key":24,"text":25,"correct":26},"B","4％",false,{"key":28,"text":29,"correct":26},"C","5％",{"key":31,"text":32,"correct":26},"D","10％","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1123436,"预应力混凝土筒仓基础施工技术主要取决于基础设计的（ ）要求。",[38,40,42,44],{"key":20,"text":39,"correct":22},"形式和技术",{"key":24,"text":41,"correct":26},"材料",{"key":28,"text":43,"correct":26},"承载力",{"key":31,"text":45,"correct":26},"施工方法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1123437,"减少了大量起重机的吊运工作量的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"滑模施工方法",{"key":24,"text":53,"correct":26},"大模板施工方法",{"key":28,"text":55,"correct":22},"爬模施工方法",{"key":31,"text":57,"correct":26},"预建整体平移施工方法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1123438,"履带式起重机属于（ ）起重机的一种。",[62,64,66,68],{"key":20,"text":63,"correct":26},"桅杆式",{"key":24,"text":65,"correct":26},"塔式",{"key":28,"text":67,"correct":22},"自行杆式",{"key":31,"text":69,"correct":26},"轮胎式",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1123439,"结构安装工程中，不适用于需要经常移动作业场地工程施工的起重机类型是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"电动式汽车起重机",{"key":24,"text":77,"correct":26},"液压式汽车起重机",{"key":28,"text":79,"correct":22},"电动式履带起重机",{"key":31,"text":81,"correct":26},"液压式履带起重机",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1123440,"钢筋混凝土结构施工时，使用的模板属于组合式模板的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"钢框竹胶合板模板",{"key":24,"text":89,"correct":26},"滑动模板",{"key":28,"text":91,"correct":26},"爬升模板",{"key":31,"text":93,"correct":26},"模壳",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1123441,"混凝土养护的目的是为混凝土（ ）创造必要的湿度、温度条件。",[98,100,102,104],{"key":20,"text":99,"correct":26},"初凝",{"key":24,"text":101,"correct":26},"终凝",{"key":28,"text":103,"correct":22},"硬化",{"key":31,"text":105,"correct":26},"固化",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1123442,"砌块的吊装一般按施工段依次进行，一般以一个或两个单元为一个施工段，进行分段流水施工，其次序为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"先外后内，先远后近，先上后下",{"key":24,"text":113,"correct":26},"先外后内，先近后远，先下后上",{"key":28,"text":115,"correct":26},"先内后外，先远后近，先下后上",{"key":31,"text":117,"correct":22},"先外后内，先远后近，先下后上",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1123443,"钢筋连接时常采用的机械连接方法是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"套管挤压连接",{"key":24,"text":125,"correct":26},"电渣压力焊",{"key":28,"text":127,"correct":26},"闪光对焊",{"key":31,"text":129,"correct":26},"钢丝绑扎连接",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1123444,"采用滑模法施工钢筋混凝土井塔的优点是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"施工速度快,占用井口时间少",{"key":24,"text":137,"correct":26},"专用设备和机具用量小",{"key":28,"text":139,"correct":26},"施工技术要求低,劳动力需求量小",{"key":31,"text":141,"correct":26},"施工接缝易处理",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1123445,"混凝土配制时，其水泥用量的允许偏差不得超过（ ）。",[146,147,149,151],{"key":20,"text":21,"correct":26},{"key":24,"text":148,"correct":22},"2％",{"key":28,"text":150,"correct":26},"3％",{"key":31,"text":25,"correct":26},{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},1123446,"选择起重机时应使起重机吊装荷载（ ）被吊装构件的重量。",[156,158,160,162],{"key":20,"text":157,"correct":26},"小于",{"key":24,"text":159,"correct":22},"大于",{"key":28,"text":161,"correct":26},"等于",{"key":31,"text":163,"correct":26},"不等于",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":28,"analysis":33},1123447,"根据起重机械的使用特点，（ ）适用于单件大、中型设备、构件的吊装。",[168,170,172,174],{"key":20,"text":169,"correct":26},"门式桅杆起重机",{"key":24,"text":171,"correct":26},"塔式起重机",{"key":28,"text":173,"correct":22},"自行式起重机",{"key":31,"text":175,"correct":26},"独脚桅杆起重机",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":31,"analysis":33},1123448,"钢结构焊缝连接的缺点是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":26},"不利于自动化施工",{"key":24,"text":183,"correct":26},"浪费钢材",{"key":28,"text":185,"correct":26},"无残余应力和残余变形",{"key":31,"text":187,"correct":22},"低温冷脆问题突出",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":28,"analysis":33},1123449,"立井井筒施工综合设备配套机械化作业线主要设备配套内容包括（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":26},"FJD-6伞钻、HS-6抓岩机、3m3吊桶等",{"key":24,"text":195,"correct":26},"FJD-6伞钻、HS-4抓岩机、3m3吊桶等",{"key":28,"text":197,"correct":22},"FJD-9伞钻、HZ-6抓岩机、5m3吊桶等",{"key":31,"text":199,"correct":26},"FJD-9伞钻、HK-4抓岩机、5m3吊桶等",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},1123450,"立井井筒施工中，提升系统不包含的设备是（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":26},"提升容器",{"key":24,"text":207,"correct":26},"钩头联结装置",{"key":28,"text":209,"correct":26},"天轮",{"key":31,"text":211,"correct":22},"抓岩机",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},1123451,"立井井筒施工混凝土的分层浇筑厚度一般为（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"0．3～0．4m",{"key":24,"text":219,"correct":26},"0．5～0．6m",{"key":28,"text":221,"correct":26},"O．7～0．8m",{"key":31,"text":223,"correct":26},"1．0～1．2m",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},1123452,"下列关于壁后注浆加固封水的说法正确的是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"井筒围岩裂隙较大、出水较多的地段，应在砌壁时预埋注浆管",{"key":24,"text":231,"correct":26},"壁后注浆，一般是自下而上分段进行",{"key":28,"text":233,"correct":26},"注浆段高，视含水层赋存条件和具体出水点位置而定，一般段高为10～15m",{"key":31,"text":235,"correct":26},"注浆孔的深度应透过井壁进入含水岩层50～100mm",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1123453,"当井筒较深时，常用的通风方式是（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":26},"压入式通风",{"key":24,"text":243,"correct":22},"抽出式为主，辅以压人式通风",{"key":28,"text":245,"correct":26},"抽出式通风",{"key":31,"text":247,"correct":26},"压入式为主，辅以抽出式通风",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},1123454,"立井井筒施工采用短段掘砌单行作业方式时，现浇混凝土井壁施工一般采用（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":26},"木模板",{"key":24,"text":255,"correct":22},"金属伸缩式活动模板",{"key":28,"text":257,"correct":26},"整体滑升金属模板",{"key":31,"text":259,"correct":26},"金属拆卸式模板",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},1123455,"立井井筒掘砌混合作业区别于短段单行作业的主要特征是（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":26},"将井筒划分为若干段高，自上而下逐段施工",{"key":24,"text":267,"correct":22},"浇筑混凝土的同时即可装岩出渣",{"key":28,"text":269,"correct":26},"在同一段高内，按照掘、砌先后交替顺序作业",{"key":31,"text":271,"correct":26},"砌壁是在多层吊盘上，自上而下逐段进行的",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},1123456,"立井井筒掘砌单行作业中，确定井筒掘进段高的因素是（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":26},"井筒深度、井壁结构、施工技术",{"key":24,"text":279,"correct":26},"井筒大小、支护结构、施工要求",{"key":28,"text":281,"correct":26},"井筒地质条件、井简直径、施工水平",{"key":31,"text":283,"correct":22},"井筒穿过岩层的性质、涌水量大小、施工速度要求",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},1123457,"立井井筒施工综合设备配套机械化作业线及其配套方案适应于（ ）凿井工程。",[288,290,292,294],{"key":20,"text":289,"correct":22},"井筒直径5．0～10．0m，井筒深度1000m",{"key":24,"text":291,"correct":26},"井筒直径5．0～6．5m，井筒深度500～800m",{"key":28,"text":293,"correct":26},"井筒直径4．0～5．0m，井筒深度400～600m",{"key":31,"text":295,"correct":26},"井筒直径5．0～6．5m，井筒深度300～500m",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},1123458,"立井井筒基岩段采用爆破法掘进施工，通常采用伞形钻架打眼，伞形钻架一次钻眼深度一般为（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":26},"2m以下",{"key":24,"text":303,"correct":26},"2～3m",{"key":28,"text":305,"correct":22},"3～5m",{"key":31,"text":307,"correct":26},"5m以上",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":24,"analysis":33},1123459,"立井井筒施工时，当采用人工手持钻机打眼时，炮眼深度以（ ）m为宜。",[312,314,316,318],{"key":20,"text":313,"correct":26},"1．0～1．5",{"key":24,"text":315,"correct":22},"1．5～2．0",{"key":28,"text":317,"correct":26},"2．0～2．5",{"key":31,"text":319,"correct":26},"2．5～3．0",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},1123460,"在立井施工中，（ ）是最费工时的工作，它约占整个掘进工作循环时间的50％～60％，是决定立井施工速度的关键工作。",[324,326,328,330],{"key":20,"text":325,"correct":22},"装岩与提升工作",{"key":24,"text":327,"correct":26},"钻眼爆破工作",{"key":28,"text":329,"correct":26},"测量工作",{"key":31,"text":331,"correct":26},"支护工作",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},1123461,"立井掘进的通风是由设置在地面的通风机和井内的风筒完成的，常用的通风方式是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":26},"串联式",{"key":24,"text":339,"correct":26},"并联式",{"key":28,"text":341,"correct":26},"压入式辅以抽出式",{"key":31,"text":343,"correct":22},"抽出式辅以压入式",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},1123462,"立井井筒基岩永久支护有多种，目前应用最多的是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":26},"料石井壁",{"key":24,"text":351,"correct":22},"混凝土井壁",{"key":28,"text":353,"correct":26},"钢筋混凝土井壁",{"key":31,"text":355,"correct":26},"锚喷支护井壁",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":33},1123463,"井筒表土特殊施工法中和治水关系密切的两种方法是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":26},"冻结法、钻井法",{"key":24,"text":363,"correct":26},"沉井法、注浆法",{"key":28,"text":365,"correct":22},"冻结法、注浆法",{"key":31,"text":367,"correct":26},"沉井法、钻井法",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},1123464,"在立井施工中，工作面常有积水，要求采用抗水炸药。不属于在实际工程中最为常用的抗水炸药是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":26},"抗水岩石硝铵炸药",{"key":24,"text":375,"correct":26},"水胶炸药",{"key":28,"text":377,"correct":26},"硝化甘油炸药",{"key":31,"text":379,"correct":22},"铵油炸药",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":28,"analysis":33},1123465,"立井井筒施工时，当采用伞钻打眼时，为充分发挥机械设备的性能，炮眼深度以（ ）m为宜。",[384,386,388,390],{"key":20,"text":385,"correct":26},"1．O～2．0",{"key":24,"text":387,"correct":26},"2．0～3．0",{"key":28,"text":389,"correct":22},"3．0～5．0",{"key":31,"text":391,"correct":26},"5．0～6．0",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},1123466,"立井井筒根据（ ）在时间和空间的不同安排方式，立井井筒施工方式可分为掘、砌单行作业，掘、砌平行作业，掘、砌混合作业和掘、砌、安一次成井。",[396,398,400,402],{"key":20,"text":397,"correct":22},"掘进、砌壁和安装",{"key":24,"text":399,"correct":26},"掘进、砌壁",{"key":28,"text":401,"correct":26},"砌壁、安装",{"key":31,"text":403,"correct":26},"掘进、安装",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},1123467,"关于明排水法的说法，错误的是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":26},"明排水法是在基坑开挖过程中，在坑底设置集水坑，并沿坑底周围或中央开挖排水沟，使水流入集水坑，然后用水泵抽走",{"key":24,"text":411,"correct":22},"集水坑应设置在基础范围以外，地下水的下游，每隔20～40m设置一个",{"key":28,"text":413,"correct":26},"当土为细砂和粉砂时，地下水渗出会带走细粒，发生流砂现象，此时应用井点降水法",{"key":31,"text":415,"correct":26},"明排水法设备简单、排水方便，适用于粗粒土层，也用于渗水量小的黏土层",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":31,"analysis":33},1123468,"下列关于地面预注浆堵水的说法中，正确的是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":26},"含水层距地表较深时，采用地面预注浆较为合适",{"key":24,"text":423,"correct":26},"地面预注浆的钻注浆孔和注浆工作都可在建井期同时进行",{"key":28,"text":425,"correct":26},"钻孔布置在大于井筒掘进直径3～5m的圆周上",{"key":31,"text":427,"correct":22},"注浆时，若含水层比较薄，可将含水岩层一次注完全深",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":33},1123469,"矿井由立井井筒转入车场和巷道施工时，提升容器应由吊桶改为（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"罐笼",{"key":24,"text":435,"correct":26},"矿车",{"key":28,"text":437,"correct":26},"吊笼",{"key":31,"text":439,"correct":26},"箕斗",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},1123470,"立井井筒施工辅助生产系统的悬吊系统由（ ）组成。",[444,446,448,450],{"key":20,"text":445,"correct":26},"提升机、钢丝绳、天轮",{"key":24,"text":447,"correct":26},"提升机、钢丝绳、吊盘",{"key":28,"text":449,"correct":26},"凿井绞车、钢丝绳、井架",{"key":31,"text":451,"correct":22},"凿井绞车、钢丝绳、天轮",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},1123471,"立井井筒施工中掘砌单行作业的最大优点是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":26},"取消了临时支护，简化了施工工序",{"key":24,"text":459,"correct":22},"工序单一，设备简单，管理方便",{"key":28,"text":461,"correct":26},"省略了长段单行作业中掘、砌转换时间",{"key":31,"text":463,"correct":26},"利用部分支护时间进行装渣出矸，节约工时而提高成井速度",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":28,"analysis":33},1123472,"某立井井筒净直径为5.5m，深度650m，基岩段施工采用高度3.5m的金属伸缩式模板砌壁，工作面常用伞钻打眼的合理炮眼深度应为（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":26},"2．0m",{"key":24,"text":471,"correct":26},"3．0m",{"key":28,"text":473,"correct":22},"4．0m",{"key":31,"text":475,"correct":26},"5．0m",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":24,"analysis":33},1123473,"立井井筒采用现浇混凝土支护时，装配式钢模板的高度不宜超过（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":26},"0.6m",{"key":24,"text":483,"correct":22},"1.2m",{"key":28,"text":485,"correct":26},"1.8m",{"key":31,"text":487,"correct":26},"2.0m",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":28,"analysis":33},1123474,"在立井井筒施工中，表土层是否稳定对施工方式和进度影响很大，属于稳定表土的是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":26},"淤泥层",{"key":24,"text":495,"correct":26},"浸水的大孔隙土层",{"key":28,"text":497,"correct":22},"含非饱和水的黏土层",{"key":31,"text":499,"correct":26},"膨胀土",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":31,"analysis":33},1123475,"下列不属于井筒表土普通施工法的是（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":26},"井圈背板普通施工法",{"key":24,"text":507,"correct":26},"吊挂井壁施工法",{"key":28,"text":509,"correct":26},"板桩施工法",{"key":31,"text":511,"correct":22},"冻结法",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":24,"analysis":33},1123476,"目前，矿山巷道永久支护一般以（ ）方法为主。",[516,518,520,522],{"key":20,"text":517,"correct":26},"金属锚杆支架支护",{"key":24,"text":519,"correct":22},"锚喷支护",{"key":28,"text":521,"correct":26},"金属棚子支护",{"key":31,"text":523,"correct":26},"前探支架支护",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},1123477,"巷道掘砌循环图表在编制时要考虑（ ）的备用时间。",[528,529,531,533],{"key":20,"text":32,"correct":22},{"key":24,"text":530,"correct":26},"20％",{"key":28,"text":532,"correct":26},"30％",{"key":31,"text":534,"correct":26},"40％",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":31,"analysis":33},1123478,"巷道采用下山施工法时，要特别注意（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":26},"提升问题",{"key":24,"text":542,"correct":26},"通风问题",{"key":28,"text":544,"correct":26},"支护问题",{"key":31,"text":546,"correct":22},"跑车事故",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":28,"analysis":33},1123479,"巷道与硐室施工时，一般不可能采用（ ）进行钻眼作业。",[551,553,555,557],{"key":20,"text":552,"correct":26},"气腿式凿岩机",{"key":24,"text":554,"correct":26},"凿岩台车",{"key":28,"text":556,"correct":22},"伞形钻架",{"key":31,"text":558,"correct":26},"钻装机",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":28,"analysis":33},1123480,"巷道利用凿岩台车施工的优点是可实现（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":26},"掘进工作全面机械化",{"key":24,"text":566,"correct":26},"钻眼与装岩工序平行作业",{"key":28,"text":568,"correct":22},"钻眼工作的机械化",{"key":31,"text":570,"correct":26},"钻眼与爆破工序平行作业",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":31,"analysis":33},1123481,"巷道掘进时的装渣和出渣是最繁重、最费工时的工序，目前装渣主要采用机械设备进行，但巷道掘进装渣设备一般不采用（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":26},"铲斗式装岩机",{"key":24,"text":578,"correct":26},"耙斗式装岩机",{"key":28,"text":580,"correct":26},"立爪式装岩机",{"key":31,"text":582,"correct":22},"悬吊式抓岩机",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":31,"analysis":33},1123482,"巷道临时支护主要是保证掘进工作面的安全，但巷道施工临时支护一般不采用（ ）。",[587,589,590,592],{"key":20,"text":588,"correct":26},"喷射混凝土支护",{"key":24,"text":519,"correct":26},{"key":28,"text":591,"correct":26},"支架支护",{"key":31,"text":593,"correct":22},"砌碹支护",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":20,"analysis":33},1123483,"倾斜巷道架设金属支架支护时，支架的安装要保证柱腿的稳固，背板和顶帮之问的空隙要充填严密，同时支架要有（ ）的迎山角。",[598,600,602,604],{"key":20,"text":599,"correct":22},"3°～5°",{"key":24,"text":601,"correct":26},"3°～8°",{"key":28,"text":603,"correct":26},"5°～8°",{"key":31,"text":605,"correct":26},"5°～10°",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":24,"analysis":33},1123484,"在常规设备条件下，全断面一次掘进硐室的高度，一般不得超过（ ）m。",[610,612,614,616],{"key":20,"text":611,"correct":26},"2～3",{"key":24,"text":613,"correct":22},"4～5",{"key":28,"text":615,"correct":26},"5～6",{"key":31,"text":617,"correct":26},"7～8",[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]