[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":620},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,13,50,1681,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,573,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1123335,1,"单选题","关于施工控制网的布设形式和要求的说法，错误的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","井下平面控制网可以布设成导线网、三角网等形式",true,{"key":24,"text":25,"correct":26},"B","地面平面控制网可以布设成GPS网、边角网等形式",false,{"key":28,"text":29,"correct":26},"C","地面高程控制网可采用水准网或三角高程网",{"key":31,"text":32,"correct":26},"D","水准网和三角高程网在井下高程控制网也都有采用","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1123336,"关于矿井测量的近井网的性质，说法正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"近井网就是近井点，是离开井筒最近的点的控制网",{"key":24,"text":41,"correct":26},"近井网是精度最高的网",{"key":28,"text":43,"correct":26},"近井网是一种平面控制网",{"key":31,"text":45,"correct":22},"近井网是矿井测量控制网",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1123337,"以下导入高程的方法，不正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"几何水准测量可完成平硐导入高程",{"key":24,"text":53,"correct":26},"斜井导人高程要用三角高程测量",{"key":28,"text":55,"correct":22},"三角高程和几何水准均可以对立井导入高程",{"key":31,"text":57,"correct":26},"立井可以采用长钢丝导人高程",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1123338,"矿山地面施工平面控制网的形式，合理的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"地面平坦而地势简单的小型场地，采用导线网",{"key":24,"text":65,"correct":26},"对于起伏较大的丘陵地区，宜采用单根的导线网",{"key":28,"text":67,"correct":22},"对通视困难的建筑场地，可以采用GPS网",{"key":31,"text":69,"correct":26},"地势平坦的小型场地，则通常采用方格网",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1123339,"关于井巷贯通及贯通测量的说法，不正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"两个相向掘进工作面掘进同一井巷时接通，属于井巷贯通",{"key":24,"text":77,"correct":26},"只有一个井筒时也会有巷道贯通的工作",{"key":28,"text":79,"correct":22},"中线、腰线及其坡度均属于井巷贯通的几何要素",{"key":31,"text":81,"correct":26},"井巷中心线的坐标方位角属于井巷贯通的一项重要几何要素",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1123340,"在常用测量工具中，（ ）是只能测量两点之间高差的仪器。",[86,88,90,92],{"key":20,"text":87,"correct":26},"经纬仪",{"key":24,"text":89,"correct":22},"水准仪",{"key":28,"text":91,"correct":26},"全站仪",{"key":31,"text":93,"correct":26},"光电测距仪",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1123341,"贯通测量最后一次标定贯通方向时，其未掘巷道长度应满足（ ）的要求。",[98,100,102,104],{"key":20,"text":99,"correct":22},"不得小于50m",{"key":24,"text":101,"correct":26},"不得大于50m",{"key":28,"text":103,"correct":26},"不得大于20m",{"key":31,"text":105,"correct":26},"不得小于20m",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1123342,"下列不属于岩石的吸水性的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"自然吸水率",{"key":24,"text":113,"correct":26},"饱和吸水率",{"key":28,"text":115,"correct":22},"吸水量",{"key":31,"text":117,"correct":26},"饱和系数",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1123343,"下列关于岩体节理面的说法错误的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"节理面是岩体的弱结构，一般会使岩石的强度降低，变形模量降低",{"key":24,"text":125,"correct":26},"节理面还会导致岩体的变形和强度具有各向异性的特性",{"key":28,"text":127,"correct":22},"节理面的抗剪强度不能决定岩体的强度",{"key":31,"text":129,"correct":26},"节理面的抗剪强度可以用库仑准则表示",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1123344,"岩石的水理性质不包括（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"透水性",{"key":24,"text":137,"correct":26},"持水性",{"key":28,"text":139,"correct":26},"给水性",{"key":31,"text":141,"correct":22},"吸水性",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1123345,"岩浆岩一般被视为均质、各向同性体（除部分喷出岩），物理力学指标比较高，下列关于其基本特点的说法错误的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"深成岩一浅成岩一喷出岩之间的强度和抗风化能力形成从高到低排列",{"key":24,"text":149,"correct":26},"岩浆岩体经过侵入或构造运动后形成复杂的岩体构造，并会形成较多的节理、裂隙，从而更易风化破坏",{"key":28,"text":151,"correct":22},"岩浆岩根据成因分为火山岩和喷出岩",{"key":31,"text":153,"correct":26},"岩浆岩的侵入常使周围岩性变坏，成为重要的软弱结构",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1123346,"关于巷道松动圈测量结果的评价，说法不正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"一般认为声波速度低于原岩声速的区域就属于松动圈范围",{"key":24,"text":161,"correct":26},"松动圈范围越大则围岩稳定越困难",{"key":28,"text":163,"correct":26},"围岩的声速越低说明岩体的质量越差",{"key":31,"text":165,"correct":22},"松动圈就是围岩因巷道开挖引起应力集中造成的破碎范围",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1123347,"关于多点位移计的特点，说法正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"多点位移计也可以判断围岩松动范围",{"key":24,"text":173,"correct":26},"多点位移计是测量巷道表面多个测点位移的仪器",{"key":28,"text":175,"correct":26},"多点位移计布设需要弹簧张紧",{"key":31,"text":177,"correct":26},"围岩是否有离层现象不能用多点位移计测定",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1123348,"关于衬砌支护的特点，说法不正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"衬砌支护主要用于服务年限较长的巷道、硐室",{"key":24,"text":185,"correct":26},"衬砌支护施工前都应完成模板质量、规格的检查、验收",{"key":28,"text":187,"correct":22},"巷道衬砌支护的合理断面形式主要是拱形、梯形",{"key":31,"text":189,"correct":26},"无论哪种衬砌支护，都要求壁后充填饱满",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1123349,"关于锚喷网联合支护的特点，说法不正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"联合支护可同时发挥锚杆与喷混凝土两种支护的优点",{"key":24,"text":197,"correct":26},"喷混凝土还可改善围岩整体性而提高锚杆的支护效果",{"key":28,"text":199,"correct":26},"锚杆是决定支护控制围岩深度范围的主要因素",{"key":31,"text":201,"correct":22},"钢筋网的作用是提高喷混凝土的刚性",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1123350,"关于锚杆支护的作用，说法不合理的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"锚杆可利用其较高的抗压性能承受围岩的大压力",{"key":24,"text":209,"correct":26},"锚杆用较高的抗剪强度阻止岩体沿滑面的滑动",{"key":28,"text":211,"correct":26},"锚杆靠钢材的高模量可以约束围岩的变形",{"key":31,"text":213,"correct":26},"锚杆靠其抗拉强度来对抗围岩扩容变形的张力",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1123351,"巷道施工采用锚喷支护，锚喷支护目前在煤矿中普遍使用，锚杆支护是一种（ ）支护形式。",[218,220,222,224],{"key":20,"text":219,"correct":26},"被动",{"key":24,"text":221,"correct":22},"积极",{"key":28,"text":223,"correct":26},"柔体",{"key":31,"text":225,"correct":26},"整体",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1123352,"在露天矿的边坡工程中，边坡坡面的稳定形势是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"没有一定规律",{"key":24,"text":233,"correct":26},"边坡坡面为凸形时比凹形更有利",{"key":28,"text":235,"correct":26},"边坡坡面凹形和凸形基本相同",{"key":31,"text":237,"correct":22},"边坡坡面为凹形时比凸形更有利",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1123353,"滑面爆破的边坡加固方法，适用于（ ）的边坡。",[242,244,246,248],{"key":20,"text":243,"correct":22},"具有浅层滑坡隐患",{"key":24,"text":245,"correct":26},"滑面不明确",{"key":28,"text":247,"correct":26},"处理非顺层滑坡隐患",{"key":31,"text":249,"correct":26},"存在较厚的滑动层",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1123354,"关于岩石边坡几何形态对其稳定的影响，说法不正确的是边坡的（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":26},"坡度越大越不利于边坡稳定",{"key":24,"text":257,"correct":26},"高度越大越不利于边坡稳定",{"key":28,"text":259,"correct":26},"坡脚越小越不利于边坡稳定",{"key":31,"text":261,"correct":22},"坡面越凹越不利于边坡稳定",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1123355,"矿业工程施工中,影响井巷周围岩体稳定性的主要因素是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"岩体本身的特性",{"key":24,"text":269,"correct":26},"巷道断面大小和形式",{"key":28,"text":271,"correct":26},"井巷开挖方法",{"key":31,"text":273,"correct":26},"井巷支护方法",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},1123356,"按照普氏系数的岩石分级方法，f值在（ ）以下的属于软岩和较软岩石。",[278,280,282,284],{"key":20,"text":279,"correct":26},"1",{"key":24,"text":281,"correct":26},"2",{"key":28,"text":283,"correct":26},"3",{"key":31,"text":285,"correct":22},"4",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},1123357,"为保证各种建筑物、管线等位置能满足设计要求以及有利于分期分批施工，施工测量通常遵循（ ）原则。",[290,292,294,296],{"key":20,"text":291,"correct":22},"先整体后局部",{"key":24,"text":293,"correct":26},"先局部后整体",{"key":28,"text":295,"correct":26},"先施工的先不测",{"key":31,"text":297,"correct":26},"整体、局部测量同时进行",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":28,"analysis":33},1123358,"关于矿业工程施工测量实施的原则，正确的是（ ）",[302,304,306,308],{"key":20,"text":303,"correct":26},"从整体到局部、先控制后细部、由低级到高级",{"key":24,"text":305,"correct":26},"从局部到整体、先细部后控制、由低级到高级",{"key":28,"text":307,"correct":22},"从整体到局部、先控制后细部、由高级到低级",{"key":31,"text":309,"correct":26},"从局部到整体、先细部后控制、由高级到低级",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1123359,"关于井巷应力实测的说法，不正确的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"衬砌墙体荷载测量可以采用压力枕",{"key":24,"text":317,"correct":22},"围岩应力测量的内容和原岩应力相同",{"key":28,"text":319,"correct":26},"喷混凝土荷载一般采用表面应力测量",{"key":31,"text":321,"correct":26},"支架腿柱下布设测力盒可以获得支架的总荷载",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},1123360,"关于收敛变形测量的功能和特点，说法不正确的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"收敛计可以测量巷道内任意两点间的相对位移",{"key":24,"text":329,"correct":26},"收敛测量可以获得巷道表面位移的速率",{"key":28,"text":331,"correct":22},"当巷道表面位移大小不再变化时说明围岩开始稳定",{"key":31,"text":333,"correct":26},"当围岩变形曲线开始平缓则就可以考虑二次支护",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},1123361,"支架拉杆的作用是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"增加支架的整体稳定性",{"key":24,"text":341,"correct":26},"提高支架的抗变形能力",{"key":28,"text":343,"correct":26},"提高支架的承压能力",{"key":31,"text":345,"correct":26},"使荷载平均到支架上",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1123362,"施工要求支架与围岩背紧主要是为了（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"形成支架对围岩的作用",{"key":24,"text":353,"correct":26},"限制围岩产生无限制变形",{"key":28,"text":355,"correct":26},"提高支架承受能力",{"key":31,"text":357,"correct":26},"减少围岩的变形压力",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1123363,"关于喷混凝土支护的作用，说法不正确的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":26},"防止围岩风化",{"key":24,"text":365,"correct":22},"不能单独作为巷道支护形式",{"key":28,"text":367,"correct":26},"防止围岩破碎松动",{"key":31,"text":369,"correct":26},"不能承受围岩较大变形",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1123364,"关于矿山井巷工程稳定与支护施工的基本原则,说法正确的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"充分利用围岩的强度及其自承载能力",{"key":24,"text":377,"correct":26},"不允许围岩产生任何变形",{"key":28,"text":379,"correct":26},"必须进行二次支护",{"key":31,"text":381,"correct":26},"尽量提高支架的强度和抗变形能力",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},1123365,"如岩石边坡内结构面的倾斜角为（ ）时，对边坡稳定有利。",[386,388,390,392],{"key":20,"text":387,"correct":26},"30°时",{"key":24,"text":389,"correct":26},"等于边坡的坡角",{"key":28,"text":391,"correct":26},"小于边坡的坡角",{"key":31,"text":393,"correct":22},"大于边坡的坡角",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1123366,"抗滑桩作为边坡稳定的方法，适用于（ ）条件。",[398,400,402,404],{"key":20,"text":399,"correct":26},"存在大范围滑动隐患的边坡",{"key":24,"text":401,"correct":22},"属于浅层滑坡隐患的边坡",{"key":28,"text":403,"correct":26},"滑动面不明确的边坡",{"key":31,"text":405,"correct":26},"具有多滑动面的边坡",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":28,"analysis":33},1123367,"对于露天矿山的边坡稳定分析，一般情况下可不考虑（ ）的影响。",[410,412,414,416],{"key":20,"text":411,"correct":26},"岩石性质",{"key":24,"text":413,"correct":26},"边坡角度",{"key":28,"text":415,"correct":22},"矿坑面积",{"key":31,"text":417,"correct":26},"结构面性质",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":28,"analysis":33},1123368,"爆破作业中出现瞎炮，处理方法是在距瞎炮至少（ ）处重新钻与瞎炮炮眼平行的新炮眼，进行装药放炮。",[422,424,426,428],{"key":20,"text":423,"correct":26},"0．1m",{"key":24,"text":425,"correct":26},"0．2m",{"key":28,"text":427,"correct":22},"0．3m",{"key":31,"text":429,"correct":26},"0．5m",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":28,"analysis":33},1123369,"矿山爆破中，早爆事故原因不包括（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":26},"杂散电流",{"key":24,"text":437,"correct":26},"静电感应",{"key":28,"text":439,"correct":22},"起爆器材质量不好",{"key":31,"text":441,"correct":26},"雷电",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},1123370,"露天中深孔爆破作业时,最便于机械化作业的装药结构是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"连续装药结构",{"key":24,"text":449,"correct":26},"混合装药结构",{"key":28,"text":451,"correct":26},"间隔装药结构",{"key":31,"text":453,"correct":26},"底部空气垫层装药结构",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},1123371,"周边眼、崩落眼、掏槽眼的起爆顺序是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":26},"周边眼、掏槽眼、崩落眼",{"key":24,"text":461,"correct":26},"周边眼、崩落眼、掏槽眼",{"key":28,"text":463,"correct":26},"掏槽眼、周边眼、崩落眼",{"key":31,"text":465,"correct":22},"掏槽眼、崩落眼、周边眼",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":28,"analysis":33},1123372,"露天矿剥离工程设计边坡台阶高度为20m，坡面角65°爆破选用预裂爆破配合深孔爆破，在爆破设计中，如采用垂直钻孔，则炮孔深度为（ ）m。",[470,472,474,476],{"key":20,"text":471,"correct":26},"小于20",{"key":24,"text":473,"correct":26},"等于20",{"key":28,"text":475,"correct":22},"大于20",{"key":31,"text":477,"correct":26},"大于25",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},1123373,"露天浅孔爆破的应用范围包括（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":26},"大型露天矿生产爆破",{"key":24,"text":485,"correct":26},"大型露天矿土石方爆破",{"key":28,"text":487,"correct":26},"大型露天矿拉槽爆破",{"key":31,"text":489,"correct":22},"大型露天矿二次爆破破碎大块岩石",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":28,"analysis":33},1123374,"下列不属于深孔爆破的起爆方式的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":26},"排间顺序起爆",{"key":24,"text":497,"correct":26},"波浪式起爆",{"key":28,"text":499,"correct":22},"台阶爆破",{"key":31,"text":501,"correct":26},"楔形起爆",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},1123375,"矿山爆破中，杂散电流是指来自电爆网路之外的电流。超过（ ）时，必须采取可靠的预防杂散电流的措施。",[506,508,510,512],{"key":20,"text":507,"correct":22},"30mA",{"key":24,"text":509,"correct":26},"40mA",{"key":28,"text":511,"correct":26},"50mA",{"key":31,"text":513,"correct":26},"60mA",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},1123376,"提高炸药的能量利用率、减小对围岩冲击影响的装药结构是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":26},"连续装药、耦合装药、正向爆破、孔口填塞煤粉",{"key":24,"text":521,"correct":22},"间隔装药、不耦合装药、反向爆破、孔口填塞炮泥",{"key":28,"text":523,"correct":26},"连续装药、耦合装药、反向爆破、孔口填塞炮泥",{"key":31,"text":525,"correct":26},"间隔装药、不耦合装药、正向爆破、孔口填塞水炮泥",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},1123377,"矿山爆破中，雷电的预防方法包括（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":26},"在雷电区采用延期起爆方法",{"key":24,"text":533,"correct":26},"在雷电区起爆时做好静电的预防",{"key":28,"text":535,"correct":26},"采用不耦合装药结构",{"key":31,"text":537,"correct":22},"雷雨天和雷击区禁止采用电力起爆法",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1123378,"为处理瞎跑，可钻平行孔装药爆破，平行孔距盲炮孔不应小于（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":26},"0.2m",{"key":24,"text":545,"correct":22},"0.3m",{"key":28,"text":547,"correct":26},"0.4m",{"key":31,"text":549,"correct":26},"0.6m",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},1123379,"在有瓦斯和煤尘爆炸危险的井下工作面进行爆破作业时，禁止使用（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":26},"安全导爆索",{"key":24,"text":557,"correct":26},"瞬发安全电雷管",{"key":28,"text":559,"correct":26},"毫秒延期安全电雷管",{"key":31,"text":561,"correct":22},"非电毫秒延期雷管",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},1123380,"煤矿井下许用的导爆索是（ ）。",[566,567,569,571],{"key":20,"text":555,"correct":22},{"key":24,"text":568,"correct":26},"高抗水导爆索",{"key":28,"text":570,"correct":26},"高能导爆索",{"key":31,"text":572,"correct":26},"低能导爆索",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":31,"analysis":33},1123381,"煤矿井下许用的雷管是（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":26},"导爆管雷管",{"key":24,"text":580,"correct":26},"导爆管毫秒电雷管",{"key":28,"text":582,"correct":26},"秒延期雷管",{"key":31,"text":584,"correct":22},"安全电雷管",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":24,"analysis":33},1123382,"在我国已经被淘汰的炸药是（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":26},"水胶炸药",{"key":24,"text":592,"correct":22},"铵梯炸药",{"key":28,"text":594,"correct":26},"铵油炸药",{"key":31,"text":596,"correct":26},"乳化炸药",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":28,"analysis":33},1123383,"可用于高瓦斯矿井或低瓦斯矿井高瓦斯区爆破使用的炸药是（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":26},"一级煤矿许用炸药",{"key":24,"text":604,"correct":26},"二级煤矿许用炸药",{"key":28,"text":606,"correct":22},"三级煤矿许用炸药",{"key":31,"text":608,"correct":26},"特级煤矿许用炸药",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":24,"analysis":33},1123384,"在我国已经被淘汰的雷管是（ ）。",[613,615,617,618],{"key":20,"text":614,"correct":26},"无起爆药电雷管",{"key":24,"text":616,"correct":22},"火雷管",{"key":28,"text":584,"correct":26},{"key":31,"text":619,"correct":26},"抗杂散电流电雷管",[621,624,627,630,633,636],{"id":15,"name":622,"category":7,"favorite":623},"领导干部任职前廉政法规知识测试题",92,{"id":625,"name":626,"category":7,"favorite":15},595,"建筑结构与设备",{"id":628,"name":629,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":631,"name":632,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":634,"name":635,"category":7,"favorite":8},534,"BIM工程师",{"id":637,"name":635,"category":7,"favorite":8},535]