[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-791-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},791,"二建矿业工程实务","建筑工程",0,11,50,1681,[13,34,46,58,70,82,94,103,113,122,134,146,155,167,179,191,203,215,227,239,251,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,510,522,534,546,558,570,582,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1123225,1,"单选题","煤巷掘进工作面采用远距离爆破时，起爆地点应设在进风侧反向风门之外的全风 压通风的新鲜风流中或避难硐室内，远距离爆破时，回风系统必须停电撤人，爆破后不应 小于（）方允许进人工作面检查。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","15min",false,{"key":24,"text":25,"correct":22},"B","20min",{"key":27,"text":28,"correct":22},"C","25min",{"key":30,"text":31,"correct":32},"D","30min",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1123226,"地下爆破作业时，当间距小于（ ）的两个平行巷道中的一个巷道工作面需进行 爆破时，应通知相邻巷道工作面的作业人员撤到安全地点。",[38,40,42,44],{"key":20,"text":39,"correct":22},"10m",{"key":24,"text":41,"correct":22},"15m",{"key":27,"text":43,"correct":32},"20m",{"key":30,"text":45,"correct":22},"30m",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1123227,"采用普通法凿井时，立井的永久支护或临时支护到工作面的距离不得大于2m; 采用滑模施工或伞钻打眼时，其间距不得大于（），但必须制订防止片帮措施，报工程 处总工程师批准。",[50,52,54,56],{"key":20,"text":51,"correct":22},"2m",{"key":24,"text":53,"correct":22},"3m",{"key":27,"text":55,"correct":32},"4m",{"key":30,"text":57,"correct":22},"5m",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1123228,"关于井筒穿过含水岩层或破碎带，采用地面或工作面预注桨时的主要安全要求，以下说法错误的是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"注浆施工前，必须编制注浆工程设计",{"key":24,"text":65,"correct":32},"注浆段长度必须大于注浆的含水岩层的厚度，并深入不透水岩层或硬岩层5~1 0 m。井底的设计位置在注浆的含水岩层内时，注浆深度必须小于井深10m",{"key":27,"text":67,"correct":22},"井筒工作面预注浆前，在注浆的含水岩层上方，必须按设计要求设置止浆岩帽或混凝土止浆垫。含水岩层厚度大，需采用分段注桨和掘砌时，对每一注浆段，必须按设计要求设置止浆岩帽或混凝土止浆垫",{"key":30,"text":69,"correct":22},"岩帽和混凝土止桨垫的结构形式和厚度应根据最大注浆压力、岩石性质和工作条件确定。混凝土止浆垫由井壁支承时，应对井壁强度进行验算",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1123229,"关于采用井壁注浆堵水时，主要安全要求，以下说法错误的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"钻孔时应经常检査孔内涌水量和含砂量。涌水较大或含有砂时，必须停止钻进，及时注浆；钻孔中无水时，必须及时严密封孔",{"key":24,"text":77,"correct":32},"井筒在流砂层部位时，注浆孔深度必须小于井壁厚度100mm。井筒采用双层井壁支护时，注浆孔应穿过内壁进入外壁不超过200 mm",{"key":27,"text":79,"correct":22},"当井壁破裂必须采用破壁注浆时，必须制定专门措施",{"key":30,"text":81,"correct":22},"井壁必须有承受最大注浆压力的强度",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1123230,"关于冻结法凿井的安全规定，以下说法错误的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"地质检査钻孔不得打在冻结的井筒内。水文观测钻孔偏斜不得超出井筒，深度不得超过冻结段下部隔水层",{"key":24,"text":89,"correct":32},"冻结法立井施工，冻结深度应穿过风化带延深至稳定的基岩5 m以上",{"key":27,"text":91,"correct":22},"基岩段涌水较大时，应加深冻结深度",{"key":30,"text":93,"correct":22},"不论冻结管能否提拔回收，对全孔必须及时用水泥砂浆或混凝土全部充满填实",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1123231,"冻结法立井施工，其冻结深度应穿过风化带进人稳定的基岩（）以上。基岩段 涌水较大时，应加深冻结深度。",[98,99,100,101],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":22},{"key":27,"text":39,"correct":32},{"key":30,"text":102,"correct":22},"6m",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":27,"analysis":33},1123232,"立井施工采用吊桶提升，吊桶须沿导向钢丝绳升降；开凿初期无导向绳时，或吊 盘下面无导向绳部分的升降距离不得超过（）。",[107,108,109,111],{"key":20,"text":39,"correct":22},{"key":24,"text":43,"correct":22},{"key":27,"text":110,"correct":32},"40m",{"key":30,"text":112,"correct":22},"50m",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":24,"analysis":33},1123233,"靠近掘进工作面（）长度内的支架，在放炮前必须加固。放炮崩倒、崩坏的支架，必须先行修复，修复后方可进入工作面作业。",[117,118,119,121],{"key":20,"text":57,"correct":22},{"key":24,"text":39,"correct":32},{"key":27,"text":120,"correct":22},"12m",{"key":30,"text":41,"correct":22},{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":20,"analysis":33},1123234,"修复旧巷道时，平巷和竖、斜井的修复方向是（）。",[126,128,130,132],{"key":20,"text":127,"correct":32},"竖、斜井只许自上而下，平巷由外向里进行",{"key":24,"text":129,"correct":22},"竖、斜井只许自下而上，平巷由外向里进行",{"key":27,"text":131,"correct":22},"竖、斜井只许自上而下，平巷由里向外进行",{"key":30,"text":133,"correct":22},"竖、斜井只许自下而上，平巷由里向外进行",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":20,"analysis":33},1123235,"煤矿建设项目由2家施工单位共同施工的，由（）负责组织制定和督促落实有 关安全技术措施，并签订安全生产管理协议，指定专职安全生产管理人员进行安全检査与 协调。",[138,140,142,144],{"key":20,"text":139,"correct":32},"建设单位",{"key":24,"text":141,"correct":22},"监理单位",{"key":27,"text":143,"correct":22},"设计单位",{"key":30,"text":145,"correct":22},"总包单位",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":20,"analysis":33},1123236,"在矿山铁路或道路两侧堆放物品时，堆放物的边缘与铁路建筑接近限界的距离， 不得小于0.75m;与道路路面边缘的距离，不得小于（ ）（如道路有侧沟时，其与侧沟 外侧的距离，不得小于0.5m)。",[150,152,153,154],{"key":20,"text":151,"correct":32},"1m",{"key":24,"text":51,"correct":22},{"key":27,"text":53,"correct":22},{"key":30,"text":55,"correct":22},{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":24,"analysis":33},1123237,"按金属非金属露天矿山安全规程规定，两台以上的挖掘机在同一平台上作业时， 挖掘机的间距：汽车运输时，不得小于其最大挖掘半径的（）倍，且不得小于50 m。",[159,161,163,165],{"key":20,"text":160,"correct":22},"2",{"key":24,"text":162,"correct":32},"3",{"key":27,"text":164,"correct":22},"4",{"key":30,"text":166,"correct":22},"5",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":30,"analysis":33},1123238,"尾矿库闭库设计和闭库施工方案，未经（）以上安全生产监督管理部门审查或 审查不合格的，企业不得进行尾矿库闭库施工。",[171,173,175,177],{"key":20,"text":172,"correct":22},"矿级",{"key":24,"text":174,"correct":22},"县级",{"key":27,"text":176,"correct":22},"市级",{"key":30,"text":178,"correct":32},"省级",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":24,"analysis":33},1123240,"井下采掘工作面进风流中的空气成分(按体积计算），氧气不低于（），二氧化 碳不高于0.5%。",[183,185,187,189],{"key":20,"text":184,"correct":22},"10%",{"key":24,"text":186,"correct":32},"20%",{"key":27,"text":188,"correct":22},"30%",{"key":30,"text":190,"correct":22},"40%",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":27,"analysis":33},1123241,"井下所有作业地点的空气中含尘量不得超过（）。",[195,197,199,201],{"key":20,"text":196,"correct":22},"1. 0mg\u002Fm3",{"key":24,"text":198,"correct":22},"1. 5mg\u002Fm3",{"key":27,"text":200,"correct":32},"2. 0mg\u002Fm3",{"key":30,"text":202,"correct":22},"2. 5mg\u002Fm3",{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":24,"analysis":33},1123242,"冻结井井筒内不得（）。",[207,209,211,213],{"key":20,"text":208,"correct":22},"进行爆破施工",{"key":24,"text":210,"correct":32},"打地质检查孔",{"key":27,"text":212,"correct":22},"打水文观察孔",{"key":30,"text":214,"correct":22},"打任何钻孔",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":24,"analysis":33},1123243,"《注册建造师执业管理办法(试行)》（建市【2008】48号)第四条规定：注册建造 师应当在其注册证书所注明的专业范围内从事（）活动，具体执业按照本办法附件《注 册建造师执业工程范围》执行。'",[219,221,223,225],{"key":20,"text":220,"correct":22},"A*建设工程项目管理",{"key":24,"text":222,"correct":32},"建设工程施工管理",{"key":27,"text":224,"correct":22},"建设工程施工监理",{"key":30,"text":226,"correct":22},"建设工程质量管理",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":20,"analysis":33},1123244,"通过二级建造师资格考核认定，或参加全国统考取得二级建造师资格证书并经注 册的人员，可在（）内以二级注册建造师名义执业。",[231,233,235,237],{"key":20,"text":232,"correct":32},"全国范围",{"key":24,"text":234,"correct":22},"本省范围",{"key":27,"text":236,"correct":22},"行业范围",{"key":30,"text":238,"correct":22},"工程项目",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":30,"analysis":33},1123245,"据建设部《关于印发〈注册建造师执业管理办法〉（试行）的通知》（建市〔2008〕 48号)第五条“大中型工程施工项目负责人必须由本专业注册建造师担任，二级注册建造 师可以承担（ ）”。",[243,245,247,249],{"key":20,"text":244,"correct":22},"大型项目",{"key":24,"text":246,"correct":22},"中型项目",{"key":27,"text":248,"correct":22},"小型项目",{"key":30,"text":250,"correct":32},"中、小型项目",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":27,"analysis":33},1123247,"根据建设部《注册建造师执业管理办法》的规定，担任建设工程施工项目负责人 的注册建造师应当在（）相关文件上签字并加盖执业印章。",[255,257,259,260],{"key":20,"text":256,"correct":22},"建设工程项目设计",{"key":24,"text":258,"correct":22},"建设工程项目计划",{"key":27,"text":222,"correct":32},{"key":30,"text":261,"correct":22},"建设工程项目验收",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1123248,"矿区基本控制网是为满足矿山生产和建设对空间位置的精确需要而设立的平面和 高程控制网，其目的是（）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"将整个矿区或矿山纳入不同的平面坐标系统和高程系统之中",{"key":24,"text":269,"correct":32},"将整个矿区或矿山纳人统一的平面坐标系统和高程系统之中",{"key":27,"text":271,"correct":22},"将矿区或矿山的不同部分纳人各自的平面坐标系统和高程系统之中",{"key":30,"text":273,"correct":22},"将整个矿区或矿山分成不同的平面坐标系统和高程系统",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},1123249,"按照坚硬程度岩石可分为（）。",[278,280,282,284],{"key":20,"text":279,"correct":32},"硬质岩、软质岩、极软岩",{"key":24,"text":281,"correct":22},"硬质岩、较破碎岩体、破碎岩体",{"key":27,"text":283,"correct":22},"硬质岩、软质岩、极破碎岩体",{"key":30,"text":285,"correct":22},"硬质岩、极软岩、破碎岩体",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},1123250,"关于近井点和井口高程基点的建立要求，以下说法错误的是（）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"近井点和井口高程基点应尽可能设在便于观测、保存的地方，不应受到采动影响",{"key":24,"text":293,"correct":22},"近井点至井筒连测导线边数不宜超过3 条；对多井筒的矿井地面近井点，应统一布置，尽可能使邻近井筒的近井点构成测量网的一条边线，或间隔的边数最少",{"key":27,"text":295,"correct":32},"水准基点不可少于3 个，合适的情况下，近井点也可作为水准基点",{"key":30,"text":297,"correct":22},"近井点和水准基点应埋设在结构坚固、稳定的井口附近建筑物上或井筒附近的地面上",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":30,"analysis":33},1123251,"拱形可缩性金属支架适用于（ ）的巷道支护。",[302,304,306,308],{"key":20,"text":303,"correct":22},"地压不大",{"key":24,"text":305,"correct":22},"地压稳定",{"key":27,"text":307,"correct":22},"围岩破碎",{"key":30,"text":309,"correct":32},"围岩变形量大",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},1123252,"关于水胶炸药论述正确的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":32},"水胶炸药具有密度高、威力大、安全性好",{"key":24,"text":317,"correct":22},"水胶炸药有毒气体多",{"key":27,"text":319,"correct":22},"爆轰感度略差于普通浆状炸药",{"key":30,"text":321,"correct":22},"不可用雷管直接起爆",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":30,"analysis":33},1123254,"泥浆的主要成分一般不包括（）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"膨润土",{"key":24,"text":329,"correct":22},"掺合物",{"key":27,"text":331,"correct":22},"水",{"key":30,"text":333,"correct":32},"砂",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1123255,"在立井施工中，目前应用最为广泛的抓岩机械是（），它通常固定在吊盘下层 盘或稳绳盘上。",[338,340,342,344],{"key":20,"text":339,"correct":22},"长绳悬吊抓岩机",{"key":24,"text":341,"correct":32},"中心回转式抓岩机",{"key":27,"text":343,"correct":22},"环行轨道式抓岩机",{"key":30,"text":345,"correct":22},"靠壁式抓岩机",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},1123256,"巷道与硐室钻眼爆破施工时，当采用凿岩台车钻眼时，炮眼的深度一般取（）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"1. 0~1. 5m",{"key":24,"text":353,"correct":22},"1. 5~2. 0m",{"key":27,"text":355,"correct":32},"2. 5~3. 5m",{"key":30,"text":357,"correct":22},"3. 5~6.0m",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":30,"analysis":33},1123258,"关于井塔的施工方法，以下说法错误的是（）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"滑模施工方法：施工速度快，占用井口时间少，经济效益明显。缺点是施工专用设备和机具用量大，利用率低，一次性投资高；连续成型施工技术要求高，占用劳动力多；遇有恶劣天气等情况停滑后，施工接缝处理复杂，容易出现拉裂、偏扭等工程事故。因此，当井塔施工工期要求紧迫，企业技术、管理素质、施工装备好，井塔上部又无悬挑梁时，应积极选用滑模施工方法",{"key":24,"text":365,"correct":22},"大模板施工方法：井塔构筑物整体性好，预埋件易于固定，确保了钢筋保护层；井塔按楼层划分施工段，为安装创造了较好条件；充分发挥地面拼装的优越性，大大改善了作业环境，减少了高空作业，节省劳力，降低了劳动强度；采用泵送工艺，实现了混凝土机械化施工配套作业线。但是，施工现场需有较大的专用场地，供预制、拼装和堆放大模板；同时需要一定的机械设备，进行吊装作业和满足快速施工；此外，混凝土输送距离长，必须保证流态混凝土连续供料以及塔壁和柱深层处混凝土的浇筑质量",{"key":27,"text":367,"correct":22},"预建整体平移施工方法：该方法的最大优点是可以缩短井塔施工和提升设备安装占用井口的时间，解决井口矿建、土建和机电安装三类工程的矛盾，可缩短建井总工期，加快建井速度。但是井塔平移需要增加临时工程以及井塔基础和塔身的加固工作量，使其造价提高",{"key":30,"text":369,"correct":32},"利用吊车安装法：利用吊车吊起杆件或部件在井口进行安装；可节省时间、安装工序简单；使用设备较少。该方法目前主要适用于井口场地受限的中小型井塔",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":27,"analysis":33},1123259,"项目实施阶段的质量检验“三检制”中专检的内容是（）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"对照工艺，自我把关",{"key":24,"text":377,"correct":22},"同工序及上下工序交接检",{"key":27,"text":379,"correct":32},"进料、半成品、成品检验",{"key":30,"text":381,"correct":22},"自盖工号、自作标记",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":30,"analysis":33},1123260,"矿业工程施工合同变更时，承包人在施工中提出合理化的建议，这种由承包人提 出涉及设计图纸和施工组织设计变更、材料与设备的代用代换，须经（）的同意。",[386,388,390,392],{"key":20,"text":387,"correct":22},"项目经理",{"key":24,"text":389,"correct":22},"设计负责人",{"key":27,"text":391,"correct":22},"施工负责人",{"key":30,"text":393,"correct":32},"监理工程师",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},1123261,"井下作业场所空气粉尘中游离Si02含量超过10%时，总粉尘的最高允许浓度不 得大于（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"1 mg\u002Fm3",{"key":24,"text":401,"correct":32},"2 mg\u002Fm3",{"key":27,"text":403,"correct":22},"5mg\u002Fm3",{"key":30,"text":405,"correct":22},"10mg\u002Fm3",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},1123262,"工程技术档案的主要内容一般不包括（）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"工程竣工图纸",{"key":24,"text":413,"correct":22},"隐蔽工程资料",{"key":27,"text":415,"correct":32},"施工总结",{"key":30,"text":417,"correct":22},"工程质量检查合格证书",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},1123263,"毎个矿井必须有（）以上能行人的安全出口，出口之间的直线水平距离必须符 合相关规定。",[422,424,426,428],{"key":20,"text":423,"correct":22},"一个",{"key":24,"text":425,"correct":32},"两个",{"key":27,"text":427,"correct":22},"三个",{"key":30,"text":429,"correct":22},"四个",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},1123264,"矿山事故调查处理:工作应当自事故发生之日起（）内结束；遇有特殊情况，可 以适当延长，但是不得超过180d。",[434,436,438,440],{"key":20,"text":435,"correct":22},"30d",{"key":24,"text":437,"correct":22},"60d",{"key":27,"text":439,"correct":32},"90d",{"key":30,"text":441,"correct":22},"120d",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},1123265,"《民用爆炸物品购买许可证》应当载明许可购买的品种、数量、购买单位以及( )",[446,448,450,452],{"key":20,"text":447,"correct":22},"销售单位",{"key":24,"text":449,"correct":22},"购买时间",{"key":27,"text":451,"correct":32},"有效期限",{"key":30,"text":453,"correct":22},"运输方式",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":27,"analysis":33},1123266,"喷混凝土的设计强度等级不应低于（）；对于竖井及重要隧洞和斜井工程，喷 混凝土的设计强度等级不应低于C20。",[458,460,462,464],{"key":20,"text":459,"correct":22},"C25",{"key":24,"text":461,"correct":22},"C20",{"key":27,"text":463,"correct":32},"C15",{"key":30,"text":465,"correct":22},"C10",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},1123267,"尾矿库使用到最终设计高程前（）年，应进行闭库设计，当需要扩建或新建尾 矿库接续生产时，应根据建设周期提前制定扩建或新建尾矿库的规划设计工作，确保新老 库使用的衔接。",[470,472,474,476],{"key":20,"text":471,"correct":22},"1 ~2",{"key":24,"text":473,"correct":32},"2~3",{"key":27,"text":475,"correct":22},"3 ~4",{"key":30,"text":477,"correct":22},"4~5",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},1123268,"矿井施工控制网设置的正确方法是（）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"以矿井附近任意已知的矿区控制网平面和高程测点为矿井基准点",{"key":24,"text":485,"correct":22},"以矿区控制网为基础专门测设的近井点和井口高程基点为工业广场和生活区的 统一基点",{"key":27,"text":487,"correct":32},"以近井点和井口高程基点为工业广场基准点，生活区可另布置控制网",{"key":30,"text":489,"correct":22},"根据施工单位个数，该项目应建立四个独立的施工控制网",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1123270,"下列不属于提高混凝土强度的措施的是（）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"提高水泥标号",{"key":24,"text":497,"correct":32},"尽量提高水灰比",{"key":27,"text":499,"correct":22},"采用高强度石子",{"key":30,"text":501,"correct":22},"加强养护，保证有适宜的温度和较高的湿度",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":30,"analysis":33},1123271,"拱形可缩性金属支架适用于（）的巷道支护。",[506,507,508,509],{"key":20,"text":303,"correct":22},{"key":24,"text":305,"correct":22},{"key":27,"text":307,"correct":22},{"key":30,"text":309,"correct":32},{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":30,"analysis":33},1123272,"关于岩石的物理性质，以下说法错误的是（）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"岩石的孔隙性是指岩石中各种孔隙(包括毛细管、洞隙、空隙、细裂隙以及岩溶溶洞和粗裂隙)的发育程度，可用孔隙率与孔隙比表示。孔隙率即岩石中孔隙总体积与包括孔隙在内的岩石总体积之比。孔隙比是指岩石孔隙总体积与岩石固体部分体积之比。砾岩、砂岩等沉积岩类岩石经常具有较大的孔隙率。岩石随着孔隙率的增大，其透水性增大，强度降低",{"key":24,"text":517,"correct":22},"岩石的吸水性指岩石在一定条件下的吸水能力。一般用自然吸水率、饱和吸水率及饱和系数表示。岩石的吸水率、饱和系数大，表明岩石的吸水能力强，水对岩石颗粒间结合物的浸湿、软化作用就强，岩石强度和稳定性受水作用的影响就越显著",{"key":27,"text":519,"correct":22},"岩石的软化性用软化系数表示，是指水饱和状态下的试件与干燥状态下的试件(或自然含水状态下)单向抗压强度之比。它是判定岩石耐风化、耐水浸能力的指标之一。软化系数小于0.75的岩石，其抗水、抗风化和抗冻性较差",{"key":30,"text":521,"correct":32},"岩石的抗冻性是指它抵抗冻融破坏的性能。抗冻性主要取决于岩石开型孔隙的发育程度、亲水性和可溶性矿物含量及矿物颗粒间联结强度。吸水率、饱和系数和软化系数等指标可以作为判定岩石抗冻性的间接指标。一般认为吸水率小于5 % ，饱和系数小于0. 8，软化系数大于0. 5 5的岩石，为抗冻岩石",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":27,"analysis":33},1123273,"爆破作业中出现瞎炮，处理方法是在距瞎炮至少（ ）处重新钻与瞎炮炮眼平行 的新炮眼，进行装药放炮。",[526,528,530,532],{"key":20,"text":527,"correct":22},"0. 1m",{"key":24,"text":529,"correct":22},"0. 2m",{"key":27,"text":531,"correct":32},"0. 3m",{"key":30,"text":533,"correct":22},"0. 5m",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},1123274,"钢筋混凝土单层工业厂房施工的关键是（）。",[538,540,542,544],{"key":20,"text":539,"correct":32},"承重结构构件的吊装",{"key":24,"text":541,"correct":22},"基础的施工",{"key":27,"text":543,"correct":22},"预应力屋架的制作",{"key":30,"text":545,"correct":22},"吊车梁的安装",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},1123276,"巷道掘进过程中，在规定的时间内，按作业规程、爆破图表和循环图表的规定， 以一定的人力和技术设备，保质保量地完成全部工序和工作量，并保证有节奏地、按一定 顺序周而复始地进行，称为（）。",[550,552,554,556],{"key":20,"text":551,"correct":22},"掘进循环作业",{"key":24,"text":553,"correct":32},"正规循环作业",{"key":27,"text":555,"correct":22},"一次成巷",{"key":30,"text":557,"correct":22},"分次成巷",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":30,"analysis":33},1123277,"矿山建设是复杂的综合工程项目，在各个施工阶段都要围绕（ ）组织快速施工。",[562,564,566,568],{"key":20,"text":563,"correct":22},"矿井生产的主要工程",{"key":24,"text":565,"correct":22},"矿井投产的主要工程",{"key":27,"text":567,"correct":22},"矿井贯通的关键工程",{"key":30,"text":569,"correct":32},"关键线路的关键工程",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":30,"analysis":33},1123278,"立井井筒工程验收时，现浇混凝土井壁的施工质量检查通常不包括（）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"井壁外观",{"key":24,"text":577,"correct":22},"井壁厚度",{"key":27,"text":579,"correct":22},"混凝土强度",{"key":30,"text":581,"correct":32},"钢筋数量",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},1123280,"采掘工作面回风流中二氧化碳浓度超过（）时，必须停止工作，撤出人员，查 明原因，制订措施，报总工程师批准，进行处理。",[586,588,590,592],{"key":20,"text":587,"correct":32},"1. 5%",{"key":24,"text":589,"correct":22},"2. 0%",{"key":27,"text":591,"correct":22},"3.0%",{"key":30,"text":593,"correct":22},"5.0%",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},1123281,"矿山建设过程中，地层变形、位移和地下水迁移和运动，地表受到影响是由于 ( )导致地层压力和地下生态环境失衡引起的。",[598,600,602,604],{"key":20,"text":599,"correct":22},"疏干排水",{"key":24,"text":601,"correct":32},"开挖",{"key":27,"text":603,"correct":22},"滑坡",{"key":30,"text":605,"correct":22},"泥石流",[607,610,613,616,619,622],{"id":15,"name":608,"category":7,"favorite":609},"领导干部任职前廉政法规知识测试题",92,{"id":611,"name":612,"category":7,"favorite":15},595,"建筑结构与设备",{"id":614,"name":615,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":617,"name":618,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":620,"name":621,"category":7,"favorite":8},534,"BIM工程师",{"id":623,"name":621,"category":7,"favorite":8},535]