[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124459":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124459,791,2,"多选题","《煤矿井巷工程施工规范》GB 50511—2010关于“先探（水）后掘（进）”的重要规定，当掘进工作面遇有下列情况之一时必须先探水后掘进（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","接近溶洞、水量大的含水层",true,{"key":16,"text":17,"correct":14},"B","接近可能与河流、湖泊、水库、蓄水池、含水层等相通的断层",{"key":19,"text":20,"correct":14},"C","接近被淹井巷、老空或老窑",{"key":22,"text":23,"correct":14},"D","接近隔离矿柱",{"key":25,"text":26,"correct":27},"E","长时间停头恢复掘进时",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]