[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124429":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124429,791,2,"多选题","不同工程建设阶段有不同的测量控制网，在矿业工程中，包括有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","勘查设计阶段的测图控制网",true,{"key":16,"text":17,"correct":14},"B","施工阶段的施工控制网",{"key":19,"text":20,"correct":21},"C","施工阶段还设有的变形监测控制网",false,{"key":23,"text":24,"correct":14},"D","矿井生产运行阶段要建立新的控制网",{"key":26,"text":27,"correct":21},"E","安装施工用的测量控制网","ABD","P112-114 工程建设过程中的不同阶段都需要通过测量落实各种定位工作。根据施工测量原则，各个建设阶段的测量都有\"先控制后细部\"的过程。因此，不同建设阶段和不同施工内容都会有不同的工程测量控制网。勘察设计阶段需要建立测图控制网，施工阶段应先建立施工控制网，生产运行阶段要根据各种需要建立相应的监测控制网。房屋建筑、矿山、道路等工程在施工前都要建立满足自身工程建设需要的施工控制网。",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]