[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124418":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124418,791,2,"多选题","矿业工程的施工项目管理分为（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","业主的项目管理（建设监理）",true,{"key":16,"text":17,"correct":14},"B","总承包单位的项目管理",{"key":19,"text":20,"correct":14},"C","设计单位的项目管理",{"key":22,"text":23,"correct":14},"D","施工单位的项目管理",{"key":25,"text":26,"correct":27},"E","监管单位的项目管理",false,"ABCD","P99-104 矿业工程施工项目管理，按照参与单位划分包括业主的项目管理（包括建设监理）、总承包单位的项目管理、设计单位的项目管理以及施工单位的项目管理。",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]