[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124413":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124413,791,2,"多选题","矿业工程施工质量控制的特点有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","多发性",false,{"key":16,"text":17,"correct":18},"B","复杂性",true,{"key":20,"text":21,"correct":18},"C","连续性",{"key":23,"text":24,"correct":18},"D","隐蔽性",{"key":26,"text":27,"correct":14},"E","有效性","BCD","P99-104 书中无直接答案，分析如下：由于矿业了程项目包括地面、地下两大内容，涉汲矿建、土建和安装三大专业，施工技术和管理具有其自身的特点，特别是地下工程项目，施工方法受地质条件的影响较大，施工安全风险高，这也造就了矿业工程施工管理比一般工程项目更具复杂性。施工阶段质量控制的重点是施工工艺和施工工序。连续性：施工工艺具有连续性：如井筒冻结段内层井壁的施工，改进套壁工艺，采用块模倒换的施工方法，在严格控制混凝土初凝时间基上，实现了冻结段井筒内壁块模倒换的连续施工工艺，缩短了套璧时间，节约了施工工期，加快了冻结井筒的施工速度。矿业施工过程中工程质量特性表现为适用性、耐久性、隐蔽性、安全性、可靠性、经济性及环境的协调性，隐蔽性：如在浇筑混凝土之前，应进行钢筋隐蔽工程验收。",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]