[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124408":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124408,791,2,"多选题","环境保护工程具有完整的设计体系和施工、验收程序，严格执行“三同时”政策，其中“三同时”是指（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","同时设计",true,{"key":16,"text":17,"correct":18},"B","同时竣工",false,{"key":20,"text":21,"correct":14},"C","同时施工",{"key":23,"text":24,"correct":18},"D","同时验收",{"key":26,"text":27,"correct":14},"E","同时投产","ACE","P259-260 防治污染和其他公害的设施必须与主体工程同时设计、同时施工、同时投产使用。",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]