[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124371":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124371,791,2,"多选题","引起矿业工程施工索赔的主要因素包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","矿业工程项目的性质",true,{"key":16,"text":17,"correct":14},"B","矿业工程的施工特点",{"key":19,"text":20,"correct":21},"C","矿业工程的设备特性",false,{"key":23,"text":24,"correct":14},"D","矿业工程的环境条件",{"key":26,"text":27,"correct":14},"E","矿业工程的施工技术","ABDE","P210-217 索赔是工程承包中经常发生的正常现象。由于施工现场条件、气候条件的变化，施工进度、物价的变化，以及合同条款、规范、标准文件和施工图纸的变更、差异、延误等因素的影响，使得工程承包中不可避免地出现索赔。",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]