[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124345":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124345,791,2,"多选题","矿业工程项目检验验收过程分为（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","批检验",true,{"key":16,"text":17,"correct":14},"B","分项工程检验",{"key":19,"text":20,"correct":14},"C","分部工程检验",{"key":22,"text":23,"correct":14},"D","单位工程检验",{"key":25,"text":26,"correct":27},"E","单项工程检验",false,"ABCD","P156-158 矿业工程项目检验验收过程分为单位（子单位）工程检验、分部（子分部）工程检验、分项工程检验、检验批检验。",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]