[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124327":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124327,791,2,"多选题","矿业工程施工阶段质量控制的重点有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工工艺",true,{"key":16,"text":17,"correct":18},"B","施工段",false,{"key":20,"text":21,"correct":14},"C","施工工序",{"key":23,"text":24,"correct":14},"D","施工用料",{"key":26,"text":27,"correct":14},"E","施工机械","ACDE","P145-1146 对技术要求高，施工难度大的某个工序或环节，设置技术和监理的重点，重点控制操作人员、材料、设备、施工工艺等;针对质量通病或容易产生不合格产品的工序，提前制定有效的措施，重点控制;对于新工艺、新材料、新技术也需要特别引起重视。",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]