[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124222":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124222,791,2,"多选题","某矿井主要巷道采用锚喷支护，局部地段岩石比较破碎，但没有涌水，支护结构宜采用（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","木支架",false,{"key":16,"text":17,"correct":14},"B","锚喷支护",{"key":19,"text":20,"correct":21},"C","锚喷网联合支护",true,{"key":23,"text":24,"correct":14},"D","现浇混凝土衬砌",{"key":26,"text":27,"correct":21},"E","锚喷复合支护","CE","P27-28 喷射混凝土同时配置金属网时就构成锚喷网支护，对提高锚喷支护能力有重要作用。采用金属支架与锚喷棍凝土的联合具有较大的支护能力，适用于围岩破碎、压力大等严重情况。",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]