[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124210":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124210,791,2,"多选题","关于施工控制网用途的说法,正确的是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工控制网是工程设计的依据",false,{"key":16,"text":17,"correct":18},"B","施工控制网是工程施工的依据",true,{"key":20,"text":21,"correct":14},"C","依据施工控制网对施工实物在图纸上进行放样",{"key":23,"text":24,"correct":18},"D","通过施工控制网图纸上的建（构）筑物在实际地点进行标定",{"key":26,"text":27,"correct":14},"E","施工控制网在施工完成后就失去功能","BD","P28-30 根据施工测量原则，各个建设阶段的测量都有\"先控制后细部\"的过程。因此，不同建设阶段和不同施工内容都会有不同的工程测量控制网。勘察设计阶段需要建立测图控制网，施工阶段应先建立施工控制网，生产运行阶段要根据各种需要建立相应的监测控制网。当项目建设完成后，还应进行竣工测量，提供最终的项目测量报告。施工测量不仅是施工的基础条件和施工的依据，也是检查施工质量、工程项目安全以及竣工验收重要的评价依据。同时施工测量资料，包括各种实际测绘的基本矿图、测量原始资料和测量成果计算资料，还将成为以后生产的重要依据，是施工完成后应完整移交的重要技术文件。",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]