[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124192":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124192,791,2,"多选题","矿井建设和生产过程中的水文地质工作，是在水文地质勘探工作的基础上进行的。其主要任务是（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","井筒施工、巷道掘进、回采工作面的水文地质观测工作",true,{"key":16,"text":17,"correct":14},"B","进一步查明影响矿井充水的因素，对矿井突水、涌水量的预测",{"key":19,"text":20,"correct":14},"C","提供矿井防水、探水及疏水方案和措施的有关水文地质资料",{"key":22,"text":23,"correct":24},"D","顶底板稳定性观测工作",false,{"key":26,"text":27,"correct":24},"E","制定矿井施工的防治水方案及措施","ABC","P12-14 矿井建设和生产过程中的水文地质工作，是在水文地质勘探工作的基础上进行的，其主要任务包括以下内容:（1）井筒施工、巷道掘进、回采工作面的水文地质观测工作;（2）进一步查明影响矿井充水的因素，对矿井突水、涌水量的预测;（3）提供矿井防水、探水及疏水方案和措施的有关水文地质资料;（4）水文地质长期观测工作;（5）研究和解决矿区（井）供水水源及矿井水的综合利用。",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]