[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124127":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124127,791,2,"多选题","《尾矿库安全管理规定》中的施工要求，未经技术论证和安全生产监督管理部门的 批准，任何单位和个人不得随意变更下述涉及尾矿库安全的事宜（）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","筑坝方式",true,{"key":16,"text":17,"correct":14},"B","坝型、坝外坡坡比和最终埂轴线的位置",{"key":19,"text":20,"correct":14},"C","坝体防渗、排渗及反滤层的设置",{"key":22,"text":23,"correct":14},"D","排洪系统的形式、布置及尺寸",{"key":25,"text":26,"correct":27},"E","顼体的非破损性检査",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]