[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124114":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124114,791,2,"多选题","立井井筒施工的有关规定包括（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","采用抓岩机出渣时，必须在作业前，要详细检查抓岩机各部件和悬吊的钢 丝绳",true,{"key":16,"text":17,"correct":18},"B","采用滑模施工或伞钻打眼时，其间距不得大于4m，但必须制订防止片帮措施， 报工程处处长批准",false,{"key":20,"text":21,"correct":14},"C","采用普通法凿井时，立井的永久支护或临时支护到工作面的距离不得大于2m",{"key":23,"text":24,"correct":14},"D","采用井壁注浆堵水时，必须遵守井筒在流砂层部位时，注浆孔深度应至少小于 井壁厚度200mm",{"key":26,"text":27,"correct":14},"E","井筒工作面预注浆前，在注浆含水岩层上方设置注浆岩帽或混凝土止 浆垫","ACDE","",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]