[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124057":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124057,791,2,"多选题","矿业工程项目的建设准备工作主要内容有（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","征地拆迁、材料设备订货",true,{"key":16,"text":17,"correct":14},"B","五通一平",{"key":19,"text":20,"correct":21},"C","编制矿井施工的初步设计",false,{"key":23,"text":24,"correct":14},"D","进行进一步的工程、水文地质勘探",{"key":26,"text":27,"correct":14},"E","落实建筑材料的供应","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]