[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124020":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124020,791,2,"多选题","矿业工程施工合同变更的基本要求是()",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","合同变更在合同完全履行之后",false,{"key":16,"text":17,"correct":18},"B","合同变更是对原合同部分内容的变更或修改",true,{"key":20,"text":21,"correct":18},"C","合同变更一般需要有双方当事人的一致同意",{"key":23,"text":24,"correct":18},"D","合同变更须遵守法定的程序和形式",{"key":26,"text":27,"correct":14},"E","合同变更完全取消原来的债权债务关系","BCD","",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]