[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1124006":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1124006,791,2,"多选题","工程量清单计价的方法有以下（）方式。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","按工料单价计算",true,{"key":16,"text":17,"correct":14},"B","按综合单价法计算",{"key":19,"text":20,"correct":21},"C","按施工工程对象性质的不同分别确定",false,{"key":23,"text":24,"correct":21},"D","按分部分项工程单价计算",{"key":26,"text":27,"correct":21},"E","按单位工程报价计算","AB","",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]