[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123999":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1123999,791,2,"多选题","矿业工程项目的成本由建筑安装工程费，设备及工器具购置费及（）构成。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程建设其他费",true,{"key":16,"text":17,"correct":18},"B","建设期贷款利息",false,{"key":20,"text":21,"correct":18},"C","企业管理费",{"key":23,"text":24,"correct":18},"D","措施费",{"key":26,"text":27,"correct":14},"E","预备费","AE","",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]