[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123997":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1123997,791,2,"多选题","关于排桩施工的主要质量要求，以下说法正确的是（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","桩位偏差，轴线和垂直轴线方向均不宜超过50mm。垂直度偏差不宜大于0.5%",true,{"key":16,"text":17,"correct":18},"B","钻孔灌注桩桩底沉渣不宜超过300mm；当用作承重结构时，桩底沉渣按有关要求执行",false,{"key":20,"text":21,"correct":14},"C","排桩宜采取隔桩施工，并应在灌注混凝土24h后进行邻桩成孔施工",{"key":23,"text":24,"correct":14},"D","非均匀配筋排桩的钢筋笼在绑扎、吊装和埋设时，应保证钢筋笼的安放方向与设计方向一致",{"key":26,"text":27,"correct":14},"E","冠梁施工前，应将支护桩桩顶浮浆凿除清理干净，桩顶以上露出的钢筋长度应达到设计要求","ACDE","钻孔灌注桩桩底沉渣不宜超过200mm；当用作承重结构时，桩底沉渣按有关要求执行。",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]