[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123992":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1123992,791,2,"多选题","矿业工程项目竣工验收，应在施工单位自验、监理工程师初验合格的基础上，由 建设单位组织，（ ）参加，在规定时间内进行正式验收。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","政府部门",false,{"key":16,"text":17,"correct":18},"B","设计单位",true,{"key":20,"text":21,"correct":18},"C","施工单位",{"key":23,"text":24,"correct":18},"D","监理单位",{"key":26,"text":27,"correct":14},"E","检测单位","BCD","",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]