[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123986":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1123986,791,2,"多选题","基坑支护土钉墙施工质量应满足（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","土钉成孔施工孔深和孔距允许偏差± 200mm",false,{"key":16,"text":17,"correct":18},"B","喷射混凝土作业应分段进行，一次喷射厚度不宜小于40mm",true,{"key":20,"text":21,"correct":18},"C","喷射混凝土面层中的钢筋网与土钉应连接牢固",{"key":23,"text":24,"correct":14},"D","上层土钉喷射混凝土面达到设计强度的50%后方可开挖下层土方及下层土钉 施工",{"key":26,"text":27,"correct":18},"E","土钉注浆材料宜选水泥浆或水泥砂浆","BCE","",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]