[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123984":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1123984,791,2,"多选题","水泥土桩应在施工后一周内用（）手段检查成桩质量。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","开挖检查",true,{"key":16,"text":17,"correct":18},"B","声波透射法",false,{"key":20,"text":21,"correct":18},"C","超声探伤",{"key":23,"text":24,"correct":14},"D","钻孔取芯",{"key":26,"text":27,"correct":18},"E","硬度测定","AD","",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]