[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123817":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1123817,791,2,"多选题","对矿井定向测量的要求，说法正确的是（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","矿井联系测量的定向，至少应有两次独立测量结果的计算",true,{"key":16,"text":17,"correct":18},"B","矿井联系测量的定向，至少应有两次独立计算的结果",false,{"key":20,"text":21,"correct":14},"C","定向的两次独立测量的允许互差的大小与井深有关",{"key":23,"text":24,"correct":14},"D","联系测量定向的允许限差与矿井井田的长度有关",{"key":26,"text":27,"correct":14},"E","联系测量定向的允许限差与两次测量的互差有关","ACDE","",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]