[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123803":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1123803,791,2,"多选题","不同工程建设阶段有不同的测量控制网，在矿业工程中，包括有（）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","勘査设计阶段的测图控制网",true,{"key":16,"text":17,"correct":14},"B","施工阶段的施工控制网",{"key":19,"text":20,"correct":14},"C","施工阶段还设有的变形监测控制网",{"key":22,"text":23,"correct":24},"D","矿井生产运行阶段要建立新的控制网",false,{"key":26,"text":27,"correct":14},"E","安装施工用的测量控制网","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"二建矿业工程实务","建筑工程",0]