[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123734":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1123734,791,1,"单选题","立井井筒表土段施工为冻结法施工时，其冻结深度应穿过风化带延深至稳定的基岩（ ）以上。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","8m",false,{"key":16,"text":17,"correct":18},"B","10m",true,{"key":20,"text":21,"correct":14},"C","15m",{"key":23,"text":24,"correct":14},"D","20m","P285-288 冻结深度应当穿过风化带延深至稳定的基岩1 0 m以上。基岩段涌水较大时，应当加深冻结深度。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]