[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123643":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1123643,791,1,"单选题","立井井筒施工悬吊系统管理，对于悬吊系统安装应有检查、验收记录，悬吊装置要有质量检验报告单；独眼井临时改绞须布置（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","安全梯",true,{"key":16,"text":17,"correct":18},"B","吊桶",false,{"key":20,"text":21,"correct":18},"C","吊笼",{"key":23,"text":24,"correct":18},"D","罐笼","P248-252 立井施工悬吊系统管理:悬吊系统安装有检查、验收记录;悬吊装置要有质量检验报告单;独眼井临时改绞须布置安全梯;罐笼提升必须有防坠装置;各悬吊、提升钢丝绳有出厂质保书和质量试验报告，质量合格;有提升连接装置探伤报告和各种销轴探伤报告，且质量合格;天轮平台周围要设围栏，有检修人员安全行走通道;井架的过卷高度满足提升要求;井架安装避雷设施及接地装置。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]