[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123636":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1123636,791,1,"单选题","废石场应设置截水、导水沟，防止（ ）流入废石场，防止泥石流危及下游环境。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","雨水",false,{"key":16,"text":17,"correct":18},"B","外部水",true,{"key":20,"text":21,"correct":14},"C","河水",{"key":23,"text":24,"correct":14},"D","尾矿水","P259-260 防治污染和其他公害的设施必须与主体工程同时设计、同时施工、同时投产使用。废石场应设置截水、导水沟，防止外部水流入废石场，防止泥石流危及下游环境。输送含有毒有害或有腐蚀性物质的废水沟渠、管道，必须采取防止渗漏和腐蚀的措施。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]