[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123580":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1123580,791,1,"单选题","不属于投标文件组成部分的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","资格审查文件",false,{"key":16,"text":17,"correct":14},"B","投标函部分",{"key":19,"text":20,"correct":14},"C","技术部分",{"key":22,"text":23,"correct":24},"D","投标费用",true,"P197-199 投标文件一般包括下列内容:1.投标函;2投标报价;3.施工组织设计;4.商务和技术偏差表。投标人根据扣标文件载明的项目实际情况，拟在中标后将中标项目的部分非主体、非关键性工作进行分包的，应当在投标文件中载明。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]