[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123563":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1123563,791,1,"单选题","下列不属于矿业工程组织措施费中的I临时设施费的为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","临时宿舍",false,{"key":16,"text":17,"correct":14},"B","临时仓库",{"key":19,"text":20,"correct":21},"C","临时施工所必须的预注浆工程费",true,{"key":23,"text":24,"correct":14},"D","临时办公用房","P181-186 临时设施费:是指施工企业为进行建设工程施工所必须搭设的生活和生产用的临时建筑物、构筑物和其他临时设施费用，包括临时设施的搭设、维修、拆除、清理费或摊销费等。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]