[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123546":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1123546,791,1,"单选题","单位工程正式验收时，应由（ ）来组织各有关单位负责人进行单位工程验收。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设单位负责人",true,{"key":16,"text":17,"correct":18},"B","监理工程师",false,{"key":20,"text":21,"correct":18},"C","项目经理",{"key":23,"text":24,"correct":18},"D","造价工程师","P156-158 建设单位收到工程验收报告后，应由建设单位负责人组织施工（含分包单位）、设计、监理等单位负责人进行单位工程验收。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]