[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123533":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1123533,791,1,"单选题","分部工程质量应由（ ）组织有关单位检验评定。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工单位负责人",false,{"key":16,"text":17,"correct":14},"B","监理工程师",{"key":19,"text":20,"correct":21},"C","建设单位代表",true,{"key":23,"text":24,"correct":14},"D","质量管理部门负责人","P172-181 分部工程应由总监理工程师（建设单位代表）组织施工单位项目负责人和技术、质量负责人等进行检验评定，建设单位代核定。部工程含地基与基础、主体结构的，勘察和设计单位工程项目负责人还应参加相关分部工程检验评定。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]