[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123525":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1123525,791,1,"单选题","矿业工程施工阶段质量控制的重点是：施工工艺和（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工方法",false,{"key":16,"text":17,"correct":14},"B","施工方案",{"key":19,"text":20,"correct":21},"C","施工工序",true,{"key":23,"text":24,"correct":14},"D","技术措施","P145-1146 矿工程施工阶段质量管理与保障的基本任务是:建立能够稳定施工出合格工程的施工系统，抓好每一环节的质量控制，保证工程质量全面达到或超过质量标准的要求。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]