[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123492":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1123492,791,1,"单选题","巷道采用上山施工法时，一般不要考虑（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","运输问题",false,{"key":16,"text":17,"correct":14},"B","通风问题",{"key":19,"text":20,"correct":21},"C","排水问题",true,{"key":23,"text":24,"correct":14},"D","支护问题","P91-94 巷道上山施工装岩应尽量使用机械设备装岩，装岩设备必须设置防滑措施。上山支护中，应积极使用锚喷支护结构。上山掘进，由于瓦斯密度较小，容易积聚在工作面附近，因此必须加强通风工作和瓦斯检查。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]