[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123488":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1123488,791,1,"单选题","正台阶工作面（下行分层）施工法按照硐室的高度，整个断面可分为2个以上分层，每分层的高度以（ ）m为宜。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1．0～2．0",false,{"key":16,"text":17,"correct":14},"B","1．5～2．5",{"key":19,"text":20,"correct":21},"C","1．8～3．0",true,{"key":23,"text":24,"correct":14},"D","2．0～4．0","P82-85 正台阶工作面（下行分层）施工法按照硐室的高度，整个断面可分为2个以上分层，每分层的高度以1.8-3.0 m为宜或以起拱线作为上分层。上分层的超前距离一般为2-3m。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]