[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123437":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1123437,791,1,"单选题","减少了大量起重机的吊运工作量的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","滑模施工方法",false,{"key":16,"text":17,"correct":14},"B","大模板施工方法",{"key":19,"text":20,"correct":21},"C","爬模施工方法",true,{"key":23,"text":24,"correct":14},"D","预建整体平移施工方法","P42-47 模施工方法综合了滑模和模板二者的长处，工艺较为简单，容易掌握，减少了大量起重机的吊运工作量",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]