[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123417":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1123417,791,1,"单选题","锚杆锚头与围岩的固定，以（ ）手段最可靠。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","水泥卷锚固",false,{"key":16,"text":17,"correct":14},"B","管缝张力锚固",{"key":19,"text":20,"correct":14},"C","机械锚固",{"key":22,"text":23,"correct":24},"D","树脂粘结锚固",true,"P59-63 目前的锚杆多用帖接式锚固。经常采用砂浆全长和粘接（地面较多）锚固或是树脂端头粘接（矿井井下为多）锚固的形式。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]