[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1123410":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1123410,791,1,"单选题","关于挤密桩的说法，正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","土桩和灰土桩挤密地基地下水位以下或含水量超过25％的土，不宜采用",true,{"key":16,"text":17,"correct":18},"B","土桩主要适用于提高人工填土地基的承载力",false,{"key":20,"text":21,"correct":18},"C","灰土桩主要适用于消除湿陷性黄土地基的湿陷性",{"key":23,"text":24,"correct":18},"D","土桩和灰土桩的施工回填土料一般采用过筛（筛孔20～30mm）的粉质黏土","P53-55 土桩和灰土桩挤密地基是由桩间挤密土和填穷的桩体组成的人工\"复合地基\"。适用于处理地下水位以上，深度5-15m湿陷性黄土或人工填土地基。土桩主要适用于消除湿陷性黄土地基的湿陷性，灰土桩主要适用于提高人工填土地基的承载力。地下水位以下或含水量超过25%的土，不宜采用。",{"id":6,"name":27,"category":28,"favorite":29},"二建矿业工程实务","建筑工程",0]